Loading...
Report y / 7409 SW Tech Center Dr,Ste. 145 Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 503.443 3799 Special Inspection • Final Report Date: 9-20-19 Job# 19-8730-12 Permit#BUP2019-00215 Mail To: Project: SPEEDRACK WEST 7245 DURHAM RD#180 11100 NW GORDON RD TIGARD,OR 97224 NORTH PLAINS,OR 97133 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Anchors-Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. Approved by: Bob Brown/President BB/sa • tie Proud to be Nationally Accredited by International Accrediting Service ACCREDITED 7409 SW Tech Center Dr.Ste. 145 Tigard,OR.97223 ="eruecr Ph:503-443-3799 Fax:503-620-2748 "`T` DAILY FIELD REPORT FOR PROPRIETARY ANCHORS resr,nc, eic 503.143.3799 Date: 9-16-19 Permit#: BUP2419-00215 SPEEDRACK WEST 7245 DURHAM RD#180 11100 NW GORDON RD Continuous I I TIGARD, OR 97224 NORTH PLAINS, OR 97133 Periodic Inspector/Certification# Greg Gillman Cert#OBOA 751 ACS Job# 19-8730.12 Anchor Embedded in: Concrete Is this a re-inspection?: Yes Q No Compressive Strength: EXISTING UNKNOWN Approved plans available?: Q Yes n No HOLE DETAILICONDITION Work acceptable per approved Yes n No plans?: 71 Anchor Embed 1/2" Hole Q1: vr Size: Depth: manufacturer's evaluation report?: ❑✓ Yes No Holes cleaned properly?: C Yes n No LOCATION OF ANCHORS Embedment per plans?: �/ Yes No GRIDLINES Perimeter walls at main warehouse INSTALLATION GRIDLINES ESR REPORT# GRIDLINES ESR-1917 TZ CARBON&STAINLESS in CONCRETE ANCHOR TYPE: Torque controlled mechanical expansion IS THERE AN RFt? E Yes n No RFI ATTACHED? L Yes Q No EPDXY TYPE: N/A INSPECTION DETAILS: EXP. DATE: N/A ACS representative arrived on site to verify installation of approximately (72)112"diameter x 5 1/2"long torque controlled mechanical expansion anchors at column base plates for new storage rack system. Work completed per General Notes and Details 6,Sheet SED1, revision 0. Verified required 40 feet per pound torque. Foreman notified of Yes n No n N/A nonconformance items? Foremans Name: Bill with Speedrack West Reviewed {_j.7, Date: CC: Meals ijAd1k 9-17-19 Bill Louis,ChMeals na: Bob Brown,President SS/LK � ,t•Ls-i a7 AceREonao TRACKING # )` �^�nnyA2 TIME IN DATE DRIVER# 21 s C f41^,3-G: Lip CA111-1 [v IT :: I #6'v lfi r11- 2020 503-783-2600 ' .y .; www.direct-transport.com '";v°' NAME 1< W r c ADDRESS CITY 1\10W1 N rk-V4 IQ STATE OR. 9113 75 NAME \--Ty of 1167AP- 0 QVILD1,06 V 0 ADDRESS 1^ �� 13125swN LL A �j v CITY STATE ZIP REFERENCE#: ❑ ❑ ❑ 1 2 1 el RUSH REGULAR ECONOMY SPECIAL INSTRUCTIONS/DESCRIPTION OF PARCEL p+R.q p O1- t- ja V t'J o 3 - t 3 °D — Ill ) l' K&/Qw6s '-Di• SIGNATURE )1 ` DATE RECEIVED NO.PIECES WEIGHT "V/ Jt { PRINTED NAME TIME MILEAGE 1' l; r1)11//tk� ( (7