Loading...
PFI2020-00066 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12020-00066 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/24/2020 Parcel: SEG266 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2716358 Project Description: Adjacent to 11355 SW Springwood Dr. Replace UG primary between VT 17356 and VT 14661. Class of Work: FEES Description Date Amount Type 1 - Utilities (gas,electric, data) PFI Permit Fee 02/24/2020 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at wwwJigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: TOM COX PHONE: 5037565419 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Perm ittee/Applicant Signature: 11+ �Yt LA T 7-qV11✓ Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00066 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings,mailboxes,etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses,residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the CityEngineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector,Trent Brickey at 503-718-2686,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector,in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s)from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard FEB 21 2020 PFI#: ENGINEERING DEPARTMENT CITY OF TIGARD �,nlrt}Ir�!r,; I`dG1NEEflING Public Facilities Improv` ement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2716358 8 TYPE 1—Franchise Utility Work performed by NWN,PGE, or utility Brief description of project agency REPLACE LIG PRIMARY BTWN VT 17356 AND VT 14661 ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of. • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): '4 4� main line tap ❑ TYPE 3—Full Scale Development Work 11355 SW Springwood Dr performed with land use approval which includes any of the following • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE LINDA OTT • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd DR water service area City/State: Beaverton, OR Zip. 97003 ❑ TYPE 4—Small Cell Technology Phone: 503.612.6093 ❑ TYPE 5—Tigard Triangle Email: preregcoord@pgn.com phone: NOTE: Type 1 and 2 applications may be Contact name: TOM COX emailed to rowpc rmits tird-or.gov. Phone: 503.736.5419 Email: PREREQCOORD@PGN.COM CONTRACTOR INFORMATION ❑ Same as applicant Name: "BID WALK PERMIT' CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd, Tigard,Oregon 97223 www.tigard-or.gov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. lal�te& - LINDA OTT FOR TOM COX 2.21.20 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE • Case No: Permit fee: Received by: Date: Approved by: TYe Date: 2 Notified bv: Al— Date: ZT City o f Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 wwa.tigard-or.gov 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Pemrit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ON ONLY TYPE 4: SMALL WIRELESS FACILITY 1`YPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑ No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineers Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 SAX/Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement I +� Ditch n Streetlight I A•—•—•—•—•—•—•—•—r—•— t Dre" I I ' T�•Fropos 5F Irl I I 1 NExisting House 1 rI I Existing 1 rl d i Lr r Driveway cr n I al I TI o i ^ • tyr � a I v o Existing Shop I � i Powerpole I I o l a _ 95, 1 D rropertyLme—-—- z.— Flr�Hydrant(FH) I I I I Scale: I"=30' I I I TYPE 1 I I I ' I I i i 1 1 TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/fix'apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 LE END ABC tw 1m Pos t wRNlecArcx �g Es�wsr[u Knnes �Mzrpu AnonroNAd[AcnnrevAroM[.rAClurea p. EQUIPMENT O I°O� I MSI.z.MI.FAvdr.mcroxrwwRrw A WMexwut r CONESTO RPP � v Resuce edRaws AxnwsrAu rAur MRlexrals GA PARK �P 7 I ass g CONDUCTORS yti >�.• w]].IL..c.IxA1EK r..Nr.o IAw.RVM.Kc collo GYOVIDEO dIxzGLLfO]YppE 1IM0V[OCLWIMCttM M ABCn54 A.......G.l1 ]b 'OROWIO ABANVONEY GABLL KIIL<SM6] VI.17W WL 1 VT-17366: WL 2 VT--16009(NEWT Sa0.PGESM7CH VAULT Install: (3(3)ELBOW KIT-JKTD GABLE-#110AL N01E3 Remove: 5 5 1.vnun N YE (3)ELBOW KIT-JKTD CABLE-#210AL 1N2 SIWOFWro Le• •:sE]Atxxu "OW- 2$' WLR055 d 1 .1 bJ �.1. FYCgETMFFN 1[31 14 fr aur] ,, • a1N3111.18 55-3 ['.xP PtlM IE9I PVLL 974 ® R0 o s]PJI.GwEnw C/c s PRM- "FERRY .'IV la ]MI' "sw c�6Laree d 5Ga-1u e'o[EapNu T�4Fv 7 i .11 tu100 N335 5 10' 100T - 2516 151]320 121 �R ......G >0 4 AW 1 naCu n* 1, 4W` nt e 10390 \\1 112 1 PRIMARY CABLE&CONDUIT TABLE 71 WL 2 VT 16009(NEW VAULT): MM 1,s 1eMIx lexalx ruu W [A.Ie uM.n 1M,.Ig I Install: (6)ELBOW KIT-JKTD CABLE-#1IOAL noM m m1 m6w nd1 sealw n6 an eMm LATERAL TAP UNIT4 POS-3 PHASE Yi W yB 5U90005783-COVER 860 VAULT NONSLIP 2-DOOR NO KEYWAY Iron (6)DUST COVER SU52-660 VAULT BASE 72'X48"X66" Ten 1121 Remove: 11.2 VICINITY MAP 1 (6)ELBOW KIT-JKTD CABLE-#2/0AL ] I( z C 11 nan ..rv•``• 1 A r�wu9 See Fi 1 11 99 Vf 31 IWS Px P` O"( 8W00 LOOP 1 I Y+0 CU DX— cu ox ,!�• � t wM n %/ 6moe(13ggGfi1 r4y^ I 11] 1 I Bi II]51 AIW3 Vi-12392 I I 1190 Pte...^ � •••,l' lix9 wo ,Iw ar E 1Ylg A - 1 ags E i .n... .....-..�. .«... ..' S ]g3 M]710355 9 'P� • it ( !T' 5 1 6anLw EM..HERE G.,rL jam bMimK.IHCRFYEMp XRCY EAn m,.,-...�., Ypn]ETI.EEn GIIMT(RWfWA(1 ,p Ea NMw EIn(TORIeMI NOCC.kI 5 11353 GME6VEEIMY OMIRYIOIE.YRpIE Pv I �� DEVUITION FROM THIS DESIGN MUST 51 APPROVED BY THE PGE RMA NACER i ] QS 1 + 1jo c�OX 1 3p -' [AIL ISI BFFORE YOII D]G It[M ,R) rlFAxrOx' MF60N IAWIFAIIMoi too IO FOLLOW Rw([A00/I[n .' E W INF MF40X VIIINOnnGnON CFNRR. ! 'Ope 11e'0 THINK Ixosr wlrsARFSFr roRlxMwxRs]mr.omn 6 SAFETY rxrovon m-w]m]o rov MAroelMx rorlsoF IMFevuSwGYLNl6TxroMantro Il+Oe FIRST MOIIFIGIpN[EMI[RAAMWIf1MTgMeI]OQ43FIM1l GtE roRF i GVE ��4ourneuI.tvllnunnmI.c.aEtEsro0p0 mi nOrEINa,1[vwrAt n1a1nA IT `EMf�1J�E6fEIF[E1qIE.]aN dy c spp,M r PaATIO munroxoluemG GilWL 3 VT-14661: io I NESC vp_.,oNs Co CTrr Install: .-.. ar. 4 sx (3)ELBOW KIT-JKTD CABLE-#110AL a6.IMFM.NIMI: art: `00�0l1 »s Remove: saaMn=*1G r�v�ary wM sauarev DEsr2]a:H: (3)ELBOW KIT-JKTD CABLE-#210AL p 11912020 1 in=60It 10.0001 c1 6 M2716356 0 REPLACE BIO UG PRI BTWN VT I79 146611979 n /�E/ PROGREes-ROeWSON 22x17 O / Lo A 1135 SW SPRINGWODD OR TIGARD DR 97TIJ 1 a \ W PRI REPIAGE BPNN VLTS C113M-173566 C11MA-1,1661 r O n , NIOSHINato N I'M 1OF2 �, 14rn yDl 120 Feel ♦WN T N _ ' TOM COX 563867ZI4 Z;OVNCAN R � 1-LINE DIAGRAM Bhp DR [j ,ls 9ela m WORK AREA .1b�,pJ 016,Ina PD16aN��Q� SN B00Kp6rs rsn Po-+sxo g � zAc "ANNOY c c,aa In. PD' R0 IiBIC, /1 plat Sp6 '�' Vl-,d851 Ar55P59 gal- 120 .1r9H 1 F a1 q.,r1}' -ABGl95 dWi 501.746' V:.30 I 100.563 S /1166MW-72W-72JS C2A/ C" lATC 91a6 A.]µ W.,NfS .,„lir t_W IC�x W162 i - 'TIC A Slr _ N eY0.H162 80DA in.m+ i' NJ-a' f U h2JC %)PLAmS Vit.55D (f-_ < C PL v T ,n 1 Ar .• AIOB 5' csN RµY ���11V111YYPG4F..�SW PIONEER LN PD- -Utz3 5� wa \` A15 E P6 _ AQt3 aL PW510 m1963B AtCO./AO AIW S]]I AMM52 $1NS / rfi 5x6 VC-13JJ1 }Y...! W-W 1wrn N XJJP^^^"'^^^"'»a"' A2AL is 195 PL35i2 A '0oL "1.161 A- 15WOY I qL 0 ..ABG 195 N'f' �pB NC la by PIPI A1:OAI V PM1AP Ar56x9 n V 6 OSEOIe N'G .151J P0.1 JA53BJl9c -sla'._ ,xMW-ItO56T ry3a6 MC PLdfi16 ' L 11212 113M:2.I,iPL m31Vi-141m ]SSJ3Y E1 BOOA <,."v VS-m 166418 16392 ` -1 ]sm5a 5911 36D5 QJF VC-1 PBC 1E01iB1 1'. A 1m]]741 MIMI CSO IT351 L� 1 ODA r W-t4ru Vr-un1 m r ABC YO e]I - rN cznL -t N 11 01 W I open Y Po-1 fy_ P6[.1T 6 PL;YI�aI ^' Vi.nMl 5011 910 555555'''''' ir, W-uwt A9czxm IB ABc rso 53sz ez 1'91 vrnsenABanL �•n c .,5es oBeP Ir �� PDIr&H n6Yl. n[P.i. N yr-Nl msTm6 C2AL���tl c50216N so ea9s �B V61nr6V C6Y P63]W Vl-+ 1 BSO t91f SB 30133 ~ CT 16 e21a CAxvB9 nBl , Vr.1 1 5919z 91 M1A` 2S( ISx9 1JN6 Po- - \ (p�' BW31m3 P /d a Po- Wa 91H49 / 0 V6, �ryM1 ,P f SW 9LA K 0 IDOW136]AL BSO x119.. '� 1W s1 "h��lren 4 xsxa vr-Iz.OB � ^ yr-,vw T�6ae1.o e r W — w° Pn�'/bsa'�N"' �yi mzxm u.e 3 W�we 1 Min? In ,. W-1x13 i aD] R A§Q 1N]06 2 �gq,501,5'w BSO1v001 B558&)S ' 2WI9 •.AL Y yy ' VL-1311) Ppl IC PDAO f B3AL "`w��aLLL M 61 P0.15253 C 1005JI.,lY PV1.4 PENN 0`A1 ezAL� M�pONY yl nT-PD� n ^I SW Bo- AN1211p4 `' SW CO O La ezaL asa zaz+t' L P[IM Ppde BI5.z6M Z _ exs 6e.91 _ c x ron. '67400 Po-laB+3(�B ze a'sw cxmn BznL T6nm w16xx 45'ANTON OR u 'R ; xYr9Y3 ✓D-1a1 P0. B]510))5 Q BBB A2CV SW MANZANITI ST ASCU 0—A3fV p0.M9:: r-Pp19 -:PD15 8358360.] -IS,H e]BI[r A50 3 _ j `_v1T1) CSnL PD1] MI's 1170 J1 PD1] 1 _ V4' A.L555 145 ASQ BM W pEG i51CU8 AW aP¢I1 As011%M 2Y 0 A153 AIN -MW M,, Ml1 i�X0.1.6 I� P61]61�I ax1NlE y1-0 MsIr ss 2Pl ++yy'"' Ys1JYe0'g C II j 1 d zA Pommel yI w "Is 11 I I 51 ST P, < P1.311 lrtm G% < I..PDA9 memrs 1^ PD10 m n C Al—j li sO afisBz D+a °O- T Pu51t 3'Po-1.1 1. 70 G 'ABC S'A MC N JYa .CON162 R$BI. I %AB1 A'A G 60 AM1 M 5 Nl9.VC e' PLA91 3s 51rm M.NaI �62 p�0.6 ..PDfiz -PO.2 :-�.z A10 a6ms .. S R]N OAK ASf 2%U46 "=_.W W,661 A 100 2m <00F[x Hal A/ GI'...P1-0619 RdBle Wlm'•• CI5)5133 r A Zai A nL CTIONORAWMIp ASBVRTV ,v Gslwll FarSmYr. Nb: bJA w TB ASBIMSBYCE6.GNER' NY DEV14710NFROM THIS DESIGN MUST 12/]12019 tin=Soft 10]0001 COWDM28 M2115M APPROVED BY THE PGE PROJECT MANAGER REPLACE BIO UG PRI B1WN W1]356AND K I4861970' utL OSS 6FFORF you., nrxnor PROGRESSAOBINSON 9 x n e9ox uwuouafs rou ro Sauow6mrs nvwrfP erT1F6XF6Bx unmxonnunox axnX. ; GF/ 113556W 6PRNGWODDDR.TIfv\RD.OR 9T133 THINK oLBUI AAf fl M Ix WA9 z<Ol-W'P ROWxfsld6l-0090 rou wrwnWCOnrJn - UG PRI REPUCE BTNN ATS C113M-173586 C113N-16881 ,yEEr SAFETY FAWff BruwxS mf BAr6av vnun rx L NOriREYIOSTUTlUAOMXsTFSCAIl I5EORF N 30F2 FIRST OAFQ✓E51o11 4TWNCTFSCAN TxE ORF60N SYx1Al tbebr TOM COX ON C11SU UIIIT'NOT1JIGi1ox CFx1FI1.OSl AT)FAf1 CYIhAnxPdC A ]OM COX 503A8]J1514.pRN Dl1NLAN N 3 6YSIxFSS GAYS PAIM M fNGVA110N ' www.invarion.com ODOr PERMT4 owres: rsor[cTpaes�wa. PGE(Beaverton LCC) M2716358 raoat7wAnuAorA orrAT L 11333Swap o7.oea or 71x4 oR + r�eaE weraAcrare ;, PCE OVvI MTAU NASBlMIaeBC ssa4 Tom Cex/So3-736-3413 tore.roxpppisem WORK / MlFMeEO er' TlMffKCOMlael COaraAOee- AHE t / C Borden Potelco Inc. ® ' POTELCO INC ' .......... ........... .. 1 / Row � l `NOPK � •/aa p0`' 2 / a�aa ra a 10 X& .te / a/aa � �y / ri • as t K-17356 leirn ® ® a v / Provide spotter(s)to m fy� assist pedestrian traffic safely around work area, p / A when a safe detour routs n / a ROAD Is not available. WORK EJB / a �® / P / e 5°Mo``e� / a DEVICE SPACING: T, TAPER: 20' :fop TANGENT:20' All signs and devices SHALL conform to the MUTCDIOTTCH. Will adjust to fit field conditions as needed for safety. Plan NOT to scale.