Loading...
Report (3) ST(90/41 - 003/ 7 / 0S7S Sw eg/20 sT Oft SIL1111110 • E 6 I 6 N • I N C . November 7,2019 Regarding the Arlington G plan that Jeff O'Brien is building on Parcel 1 Echo Heights,it has come to our attention that the typical header installed was a D.F.#2 4x10 instead of the D.F.#2 4x12 as called out on our notes page,see"framing notes",item#1. We have reviewed the headers for the Arlington G and a D.F.#2 4x10 header will be adequate on all standard header locations. If there are any further questions,please feel free to call or e-mail me. Professionally, Keith A Kudrna Suntel Design,Inc. Tel:(503)624-0555 Fax:(503)624-0155 16865 Boons Ferry Road,Suite 103 Lake Oswego,Oregon 97035 www . suntelhomedesign . com