Plans /(p2CyA1P rir
} RECEIVED
JAN 7 2020
"" CITY OF TIGARD
Oregon Pleating Mechanical General Notes: BUILDING DIVISION
& Air Conditioning
1. Cooling equipment does not exceed the load of the calculated requirement.
Tigard Town Square Demise(Shell) 2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg. OFFICE COPY
16200 SW Pacific Hwy 3. Heating and cooling ducting to be designed to not exceed 0.5 wc positive(supply)and 0.5 wc
Tigard, OR 97224 negative(return).
4. Provide programmable thermostat. 5 degree deadband minimum. 7 day. Microprocessor. Set
program for night energy savings.
Scope of Work 5. Seal ducting with UL listed mastic or mastic tape.
6. Fan motor does not exceed allowable,first available above BHP.
Oregon Heating and Air Conditioning will perform the following scope of work: 7. Max leakage rate of OSA or exhaust dampers to be 4 cfrn/sft @ 1.0 sp.
1. Provide and install (1) new exhaust fan. 8. Provide 0 and M to building owner.
Equipment Schedule
RTU1- Existing 4 ton.
RTU2- Existing 4 ton.
EF1- Existing.
EF2- Nutone AEN110- 90 cfm @ 0.25sp. On switch.