503.443.3799 Special Inspection
Final Report
Date: December 18,2019 Job#18-8490
Permit#BUP2018-00197
Mail To: Project:
TRAILBLAZER DEVELOPMENT, LLC TIGARD SELF STORAGE(EXTRA
333 S STATE ST-SUITE V-144 SPACE)
LAKE OSWEGO, OR 97034 7600 SW ATLANTA ST
TIGARD, OR 97223
To Whom It May Concern:
ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
for the following:
Concrete Construction
Shotcrete
Prestressed concrete
Anchors-Adhesive
Cold Formed Steel
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
t-d-e. (72/1,O '.
Approved by:
Bob Brown/President
BB/KS
i..
cePt
Proud to be Nationally Accredited by International Accrediting Service
ACCREDITED
. DCI111111111
ensineens
Washington Z`'/S— °'v( 1 1
g Oregon
California
.5 Texas
— Alaska December 17, 2019
Colorado Matt Neish
Montana 808 SW 3rd Ave
Suite 300
Portland, OR 97204
Re: Tigard Storage Facility
Final Structural Observation Summary Report
As required by the City of Tigard, DCI provided periodic observation of the
construction work. DCI Engineers completed the structural observations at the
following stages during construction:
a. Foundation, April 4, 2019
b. PT Slab, May 20, 2019
c. PT Slab, May 23, 2019
d. PT Slab, May 30, 2019
e. CFS Framing, August 6, 2019
f. CFS Framing, October 15, 2019
To the best of our knowledge, non-conforming structural items have been resolved
in general conformance with structural contract documents, specifications, or our
instructions. The reviewed work meets the requirements of the code.
Special Inspection reports, submitted to our office by ACS Testing Inc., were
reviewed for the structural requirements. To the best of our knowledge, ACS
Testing Inc. performed all required special inspections. All of ACS Testing Inc.
non-conforming structural items were resolved and they have submitted their final
report.
DCI has reviewed all required deferred submittals prior to final submission to the
city. To the best of our knowledge, all items have been installed and inspected by
ACS Testing Inc. where applicable.
The purpose of these visits was to evaluate portions of the construction with respect
to the design intent. This report is based on a visual observation of construction
readily accessible to view. Concealed conditions and items that were not described
in this report were not included in this review. Work that has been observed does
921 SW Washington Street,Suite 560 r ° ',OR,97205 Phone(503)242-2448
Service Innovation Value
not waive the contractor's responsibility for the means and methods of construction,
job site safety, or to comply with the contract documents.
If you have any questions, or need any further assistance give me a call.
Sincerely,
FIUCTU
DCI Engineers 5 �p PROF <
14/C? - 74858PE • 9
CSAF:
ORE ON
s'si,9�qCH z3.ON}
Chalupa, SE FY CN
EXPIRES: 12-31-19
cc: ACS Testing Inc.
City of Tigard
Disclaimer: This report is based on limited visual observations of structural components for general
conformance to the approved construction documents prepared by DCI. There is no claim, either
stated or implied that all conditions were observed or analytically evaluated. These observations
should not be construed as a quality control inspection, nor shall anything herein be deemed to
relieve the contactor from its obligations under the contract documents and all applicable codes.
Observed deficiencies or variations from the approved contract documents have been noted above.
The contractor and/or special inspector shall provide documentation and written verification of
acceptable corrective action(s).
GEOENGINEERS
0
4000 Kruse Way Place
Bldg.3,Suite 200 YEARS
Lake Oswego,Oregon 97035
503.624.9274 IN O R E G O N
December 18, 2019
Trailblazer Development, LLC
333 South State Street,Suite V-144
Lake Oswego,Oregon 97034
Attention: Jeb Koerner
Subject: Final Summary Letter-SW Atlanta Street Storage Building
Geotechnical Engineering Services during Construction
Tigard,Oregon
Building Permit No. BUP 2018-00197
GeoEngineers File No.23459-001-01
GeoEngineers, Inc. (GeoEngineers) provided geotechnical observation and consulting services during the
construction of the SW Atlanta Street Storage Building project in Tigard, Oregon. Our scope of services was
performed in general accordance with our proposal dated September 5, 2018 and authorized on September 9,
2018.We provided a partial summary letter documenting the rammed aggregate pier(RAP)installation,dated June
3, 2019.
This letter provides documentation required by Chapter 17 of the International Building Code (IBC) that special
inspections were performed at the site for geotechnical engineering construction by personnel under my
supervision. This work included observing RAP installation, site preparation and grading, fill placement and
compaction, floor slab and foundation subgrade preparation, and pavement density testing for improvements to
Atlanta Street.Our site visits were completed between January and November 2019.Field reports that documented
our services were prepared and submitted to members of the design and construction team.
As of the date of this letter,the above special inspections for the subject project have been completed. Based on
our observations, it is our professional opinion that these inspections and tests were performed and reported
according to IBC requirements, and the geotechnical engineering related construction that we observed was in
conformance with the applicable workmanship provisions of the IBC.
Trailblazer Development,LLC December 18,2019 Page 2
Our opinion applies to work observed by personnel under my supervision and represents conditions at the date of
our final observation.Our involvement did not include supervision or direction of the actual work of the contractor,
the contractor's employees, or agents. Our opinion is not intended to relieve any other party from meeting
requirements imposed by contract or other means,including commonly accepted industry practices.
Sincerely,
GeoEngineers,Inc.
0,0 PROF
Air OGIN
°94 8 ,e
gLAN tib
EXPIRES: t 2 3 I.z3 '
Gre A.Landau,ME,tit.
Associate Geotechnical Engineer
One copy submitted electronically
Disclaimer:Any electronic form,facsimile or hard copy of the original document(email,text,table,and/or figure),if provided,and any attachments are only a copy of
the original document.The original document is stored by GeoEngineers,Inc.and will serve as the official document of record.
GEOENGINEERS
File No.23459 00101