Loading...
Report M 112-0! -v(720 C DESIGNk' FIELD REPORT (30g0 S 16 c A 6 Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: Ken Buckingham.................................................... ........................................ Project Name: I River Terrace East Date: 01/02/2020 Location: I SW Scholls Ferry&Roy Rogers,Bvrtn. Report#: 303 Arrival: I 1245 Departure: 1330 Weather: I Cloudy,50s Permit#: TBD Site Visit Requested By: I Rob Howser(Polygon) Met With(on site): Rob Purpose: I Observe subgrade for lot 147,148 and 149 Outstanding Issues: Upon arrival,I observed that subgrade for lots 147, 148 and 149 had been prepared.Crews had started setting up forms for the footing.Observing around the forms,subgrade consisted of brown silt.Using a'A"steel foundation probe,I evaluated the relative consistency of the subgrade.Soils within the building footprint were generally medium stiff to stiff where probed. Based on our observations,it is our opinion the subgrade observed for Lot 147, 148 and 149 observed today,as indicated on the attached site plan,has been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments:Site Plan(1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor's employees or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By section. Signature: 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com