Report 4A err 2o '6- 003 '1 (65 71 i iciYvtty (.A✓
DESIGN FIELD REPORT
Page 1 of 1
WI e+Ct"' Po on 129.03 Prepared Jessica Pence
Project:Name: River Terrace East Date: 01 0/ 020
Location: SW Schalk Ferry&Roy Rogers,Bvrtn. Report#: 306
Arrival: 0915 Departure: 0930
Weather: Cloudy, SOs Permit#: TBD
Site Visit Requested Rob Hawser(Polygon) Met With(on site):, Rob(pliant)
Purpose: Observe Lots 139-140 Subgrade
Outstanding.Issues: t *RESOLVED*
I was informed lots 139-140 subgrade had been over-excavated where previously observed as soft(see site plan).
Subgrade appeared to consist of brown silt.Using a 1,4°diameter steel foundation probe,I observed the relative
consistency of the subgrade.Probe resistance indicated generally medium stiff to stiff subgrade conditions.
Based on our observations,it is our opinion the lot subgrade observed today have been prepared in general
accordance with our geotechnical recommendations.
Distribution.
Attachments:Site PI (1)
Reviewed <
This report presents*prot 'M
ons as a ruultof ar ... n ofacMAtks r ng to geotechnical •• • soreness, refpon the cmaactor to • Mtt the plane and
specifications throodhout_ bonof the project irrespective of the presence of our reareseraativs,Dunmore data •dtrectton of the contract:.Rut ••s employees
et agents.Our bon is:not pondble for Me safety Tide field report is a DRAFT:represcnuton of our Reid observations.- WO • recontriedatloos,The • can only be..
considered final upon review of the GeoDesign project tend,as Indicated by initials in the'kertewed fear sectort..:
Signature' •
9450 SW Commerce Circle,Soite 300 I Wilsonville,OR 97070 1503.968,8787 I wam.geodeslgninc.com