Loading...
Report r M yf2a lg- e o32i 1,6sgy 5w FhYvia►7 i,il ESIGNE° FIELD REPORT Page 1 of 1 COI Project: Polygon-129.03 Prepared By: Jessica Pence > Name° River Terrace East Date 01/30/2020 Location: SW Scholls Ferry&Roy Rogers Bvrtn Report*: 306 Arrival 0915 Departure: m 0930 ,» mm, Weather Cloudy,50s » » Permit#; TBp Site Visit Requested 8 Rob Howser(Polygon) Met With(on site): Rob(phone? Purpose: Observe Lots 139-140 Subgrade Outstanding issues: l *RESOLVED* I was informed lots 139-140 subgrade had been over-excavated where previously observed as soft(see site plan). Subgrade appeared to consist of brown silt,Using a Y4 diameter steel foundation probe,I observed the relative consistency of the subgrade.Probe resistance indicated generally medium stiff to stiff subgrade conditions. Based on our observations,it is our opinion the lot subgrade observed today have been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments:Site PI (1) Reviewed 1 The repot presents opinions as a resutrof our obs�tter of activities op to geotechnical .i -, environmental servkes.. *von-the contractor toe.... with the plans and sperifkadons throughout of doe project irrespective ofthe presence of our reoreseruative,..Ourwnrk(tree., nekdt s.� . direction of the contractor,the wasn't-employees or agents.Our fine is.not-tpondb e:for site safety,.This field report is a DRAFT representation of our field observation g,and . tacomenerdadonx.The'i can only be considered final uponRteview of the GeoDesigh project manager,as indicated by initials in the'Reviewed BY'scoop,.: Signature 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 I S03.968.8787 I Nneay.geadesignint.cam