PFI2020-00015 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
• COMMUNITY DEVELOPMENT Permit#: PF12020-00015
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/15/2020
Parcel: SEG1365
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job#M2798186
Project Description: SEG3583 and SEG1365// 13660 SW 121 st Ave. Replace two poles: Pole 2151 and Pole 2153
Class of Work: FEES
Description Date Amount
Type 1 - Utilities (gas, electric, data) PFI Permit Fee 01/15/2020 $300.00
Owner:
Total $300.00
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tioard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
JEREMY SAMPSON
PHONE: 5036126093
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12020-00015
Type: Condition Name: Status: Seven :
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140 (Tri-Met)
and 503-431-2345 (Tigard School District) and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.) before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13- DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14- UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17- REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19- PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector.
PFI_Utilities 23- MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have
authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26- RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI—Utilities 31 -OTHER Applied Notice
Other
RECEIVED
2020 N 15
City of Tigard r,JAN
OF 5 2020 PFI#:�u —®Q01_�
ITYENGINEERING DEPARTMENT PLANNING/ENGINEERIN'
• . Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION TYPE OF WORK
Project name: PGE Job # M2798186
® TYPE 1—Franchise Utility Work
performed by NWN,PGE, or utility
Brief description of project: agency
Replace 2 poles 2151 2153 ❑ TYPE 2-ROW Sidewalk/Driveway/Sewer
Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION ( • Sanitary sewer lateral installation and
) �Q 3 \�� � main line tap
(address address if available): J vv ❑ TYPE 3—Full Scale Development Work
133 W 121 ST AVE performed with land use approval which
' includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION Street widening
Name: PGE LINDA OTT Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 2213 SW 153RD DR water service area
City/State: BEAVERTON OR Zip. 97003 ❑ TYPE 4—Small CellTechnology
Phone:
503.612.6093 ❑ TYPE 5—Tigard Triangle
Email: preregcoord@pgn.com Phone:
NOTE: Type 1 and 2 applications may be
Contact name:
)MUCIMWOW JEREMY SAMPSON emailed to rowpermitst)rilnrd-ongov.
Phone: M Email:
503.612.6093 PREREQCOORD.PGN.COM
CONTRACTOR INFORMATION ❑ Same as applicant
Name: PGE CREW CCB Number:
Mailing address: City/State: Zip:
Phone: Email:
ENGINEER INFORMATION
Name:
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes ❑No Case number:
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 www.tigard-or.gov 503-718-2421 Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise of license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
za- te� Ott- LINDA OTT FOR MIKE MANCE 1-15-20
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
rr
Case No: FrZD Z4-006IS Permit fee: X00,e o Received by:_ L Date:
Approved by: 7ey---7f.6. Date: I1-01-0-02-o Notified by: �G Date: }`������✓
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY •R STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit
❑ Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineers Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4
Edge of Favement
Ditch
StreetlightI .•—•.•......��.�
A Raaf Dni•
• Tl�F�,5,1• �7SrTiRe_� 1
n! Existing House 1
Ito I Existing
>i Driveway ;
~it 1 �
a
� TI
oIOL
' I
Erdding Shop
Powerpole
95• 1
------rroperly'Line----------
� I o
! I Fire Hydrarrt(FH)
� I I
Scale '1"=30'
( 1 1
TYPE 1 AND TYPE 2:
MINIUM SKETCH
I �
� I
( I I
I I
� I
REQUIREMENTS
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 4 0f4
2149 A2 OVERHEAD LEGEND
45'4 AL TX 35'
1990 1982 1 WORK LOCATMNI
-------• SURVEYGRIOBOUNOARY
'2.z. '2zos 12.81 13285 �xeMoveABANooN PAuunEs_IHSTALL Facurnes
12155 1324° INsiALt ADDInONAL EACIUDES+MOOIFY FACR-1—
POLES
v r--POLE CLASS(1,2,3,4,H7,H2,S)
v H' Cl
a1z
L POLE HEIGHT
543814 35 FRAMING TRANSM/SSION4015Tft/BUTION(SEE CODES BELOW)
C 2ACSR SW MARION ST C 25522 1901
_FRAME DISTRIBUTION-LC 10115,MU 0011
99
3 CN2ACSR
J4 W (2PH BFT LT.TANG,PIN)
199 14
122117 19 3801 EQUIPMENT
45'4 14 OT
WL 1 PL-2151' 1957 501 9 RE"ucE Ll_u.oT
Install: 2150
85'4
_ A2
PL 50'-2 19 ANCHORS GUYING
12230 1'NORTH 12190
D11 ua0s c w m
Remove: •L1:no.. d ' d vos les,`a E
PL 45'-3 12170 4 'Las b 6
IGUY rljG4jGIj2jG1124A
D11 PnchOr Code Al A3 AS A]AB 2GUYS 021-1G9 011 Gf
TEMP TRANSFER COMMIS)
13300 3GUYS G3 G6 G9 G21
PGE PULLED
TOPPED TO COMMIS)
,2225
TELCO TO PUL` 1-LINE DIAARRA�Ik•e
PP
L3]99� P 401
1221312201 2151 1 PLJ]b PLJ]99 PL3e0U A501eo 21
12199 12197 5.'-2 PL-21
12175 Nine 13360
6 1 2 'PPD-23 a ,,, pA23T7[8086343 ,�.p_.,�p.
-Unlmown 34
PD-2350[608419 PD' ,_-PP 2 L?1'O"LNO'ARE
1 Yy�29
PD-2 1100 25'Lnk 2163 qE''7 rPO 2382 PD ]0 pp BY P 231 S{ NOL p 'PD-23
P-2380 /100 4Jy4- P0.2b1 Po-zlee ❑pp.23 •. LN .237
C 36 * U%P eD3b3 --0D 2b6 Ce06 P0.2376 PD. CSO 628 y
AL-TXT I�`C 350 qL-TX P-2379 P2h .tab I 62-PD-2 pp.2949 F.
�` C10 [7623 zz3bS (E NPGIJiB P�.2344 PL-2152.
71 I!W3 VP'FM1 EC4V P92x3L ^,PO.2x dbt
Unknown cm A PPO.2x
1708 6.2549 c�
PD-2x3 b�C pLL pLY e9 C,,t,,2 �,b PD-2364
Y
35p q�iX C2AL LN 'eeders �,B1 PD0.10�� PL.213 18010
C 50 62879 -PD-2318 799'P� 13400 1
12202 1219 fez a ^y1 A503B210 P-ese SPI}82 C25eetb0 •..RC, A2 7
12176 7' PD. ii.. P �) PO- ... 43
w D MI
PR9350830
/ C 52027 PD-191 , PP206 203. .toe
12160 5 0 145 290 500 Fe PD•18 P 20
P
I P 2 PO-97 PO-
53 tp
j ICINIMAP
H S(1
7
215 ♦1999 s"t�'
12197 12189 3 1852 407
io
121.5 A 15 3601 H6W
143407 1337. „E
1' 7 �
55 12159 13
2343 75'-Unk n Open �, sw",a„•1,
*/100 WL 2 PL-2153:
c iOCU TAC 3S0 AL-TX P' Instal[
TAC
54 PL VSOU 3
C 1D� 2s'-unknPwn 1'SOUTH .+ •^'•.-�
SW QUAEL CREEK LN u � Him
30'41 011
�'Q- a•9z 1981 134E0 WILDLIFE PROTECTION
C3 ALy vNA-TC O 2-IN PVC COND UNIT W/12'BKTS
x + 2-IN PVC CONDUIT UNIT
1 P 50KVA OH 120/240 7.2 NT1 CB
SACCOUNTS
12186 12114 14.82kW
142 C/O F40T UG TAP
1 162 293' k,=move: _
1310. PL 40'-4 _
011
iso 2-IN PVC COND UNIT W/12'BKTS :
1 2-IN PVC CONDUIT UNIT ,
VDROP 1P SOKVA OH 120/240 7.2 NT1 CB
9 t'i 142 C/O F40T UG TAP
4 0^1 13543 ;
21ty4 ( -�1 TEMP TRANSFER COMMIS), •n ,.,
13613 N 135 POE PULLED i
qq TOPPED TO COMM(S)
t
ossa ASU0 16040 TELCO TO PULL
NOnb U1 A,�_L..
181 $$soources:Egl HERE'GaTn�(1SGS
35'-Unknown 3571 sw Ln�,mn 0,: Tntermap IN REMEb1T P t�RCan.Esri
251' 2004 .Tapan METI Mi China(Hong Konl
1 511 n6vs Esri KDrea.EMI(Thailand).NGCC,()
n
r
Dn43 OPenStree04ap D9nblbldors.and the
n
;A 2593487GIS User Cammundy
P4 12054 �. .... _
4.1000 D 12092 12011 NY DEVIATION FROM THIS DESIGN MUST
207 �” �EAPPROVED BV THE PGE PROJECT MANAGER ii
nknown
a�A-50 AL-7X ATTENTION. CALL 811 BEFORE YOU DIG
7 ,y A2AL p0- 11058 T QW OREGON OIW REQUIRES YOU TO FOLLOW RULES ADOPTED
r 17 'R'7 '^ ,VpBUnknown ^ THINK BYTHE OREGON UTION NOOPHATION CENTER.
407 OC Q C THOSE RULES ARE SET FORTH IN OAR 951-001-0010 -�'
2004 " SAFETY THROUGH 952-001-0090 YOU MAY 09TAIN COPIES OF jIW
"p x �' 'R 1:1520 THERULESBYCALUNGTHEOREGONUTILITY
N
SO
A3S0 87 SW31?/ESTLE Vi-206 FIRST NOTIFICATION CENTER AOMINI5IRATIONBl501-132-]98)/
Y 2 AL`Tx RSLppp P TO
REQUESTUTILITYLOCATESCALLTNEOREGON taeMkelWtbdm
AS063050 A360AL-TX 209 UTILITY NOTWICATIONCENTER,811ATLEAST Cdl laea6.
2 BUSINESS DAYS PRIOR TO EXCAVATION
12151 ai A 1 30' krwwn
O1 O CU
PGE CONSTRUCTION DRAWING
'053 AS-BUILT VERIFICATION 8 NESC VIOLATIONS CORRECTED
1205 PD-1 "
12062 Foreman: Data:
116 General Foreman: Dale:
x 35'-Unknown eed/o.QmM conMru4im
+�L SDPM•ENG REVIEW.' s.
-l 12097 � SBUILT BYDES/GNER:
11/20/2019 1 in=60It 1070001 1000004544 M2788186
064 m F
c 120 z I(AM due b 11/2119)Replace 2 oleS with taller les
121111 ` TIGARD-13362
1 0>7 120 210 �• LOCA110N 12-2.17
12071 311'-Unkn°wn 12065 rVE/ 13369SW 121STAVE TIGARD
LIESCRMTN)N
PD-1
ASO 63014 ` REP 2 POLES FOR TALLER POLES FOR COMM ATTACHMENT sjFI
A 350 A10, COUNTY SECnONS wOLtR wOH
0 38189 TX A350 q� p�[y gp -193 CU.T% - WASHINGTON C2103C 1
U Fa2t X A3W AL-TX Caution 1170 OESIGNSY PHONE DRAWN BY
30'-Unkrawn
<� PPt zany Feeders 12.+;8 N " MIKE MANCE 503-718-6301 TARALEAKE
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3— Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist.-
a.
xist:a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340— Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
Y2
Q
o
W A 0.
O
Wo2 O
S o¢� 4)
rn
m CO
Wo � l t LL
LU
9L
Q
ca
--— ————— — • ZS2-W
m c
$ •• �0
ca
•® 2
I
w 1 t m I•I
I E E M a1n
I
o • m
® �
I •
CL E
•
O j •
O k
LL v� e M pWp��O
C� I • m CO
Cl) -
V-
------------------— ------ ----- -- a
m
Sign Spacing and Buffer Lengths(feet) 1 t Z S Cd
C
Posted S acin Between Signs Buffer LU
LU p
Speed A B C Space zz o O
20 50
25 100 100 100 75
30 100
35 40 350 350 350 150 a O
45 180 cc 3
50 500 500 500 210
55 250
December 2011 Chapter 5
www.invarion.com
Bicycle Accomodation Diagram 5-6
NOTES:
- Bicycles on Roadway (CW11-1) sign should not
interrupt standard sequences. For example:
- BE PREPARED TO STOP/Flagger Symbol
- LANE CLOSED AHEAD/Lane Ends
Work Symbol
- Bicycles on Roadway sign typically follows ROAD
Area WORK AHEAD sign and used as general warning.
A
A
I
B
it
ROADWAY
ON
C
ROAD
WORK
AHEAD
www.invarion.com
Bicycle Accomodation Diagram 5-6
Bicycle Accommodation Principles:
1 . If a significant volume of bicycles can be expected and work closes a
marked bicycle facility, or requires bicycles to share a travel lane,
install a "(Bicycle) ON ROADWAY' sign (CW11-1) or the Bicycle
symbol (W11-1 ) sign with an "ON ROADWAY' (OBW1-5) rider, in
advance of the work area.
2. Install temporary signing off the paved shoulder, within the planter
(buffer) strip, or share the width needed between the shoulder and the
sidewalk, as available.
3. Signs are to remain in place until the surface is restored and the width
made available for bicycle use. See Diagram 5-6 for typical bicycle
signing placement.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75 ERRATA:
30 100
Supplement Table
35 350 350 350 125
40 150 Updated:February 12,
45 180 2016
By:ODOT Traffic-Roadway
50 500 500 500 210 Section
55 250
Sign Spacing and Buffer Lengths (feet) Supplement
Posted S acinc Between Signs "Buffer"
Speed A B C Space
60 285
65 700 700 700 325
70 1 1 365