PFI2020-00030 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12020-00030
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/23/2020
Parcel: SEG855
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job#M2837157
Project Description: SEG855//14115 SW Chehalem Ct. Replace 2 laterals and 5 2/0 elbows Vault 14.
Class of Work: FEES
Description Date Amount
Type 1 Utilities(gas,electric, data) PFI Permit Fee 01/23/2020 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
AMY SWEANY
2213 SW 153RD DRIVE
BEAVERTON, OR 97003
PHONE: 5036122935
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12020-00030
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
Trent Brickey
971-228-9269
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreements]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVE®
JAN 2 2 2020
. City of Tigard pLANNC�ITY OF IGiVE RIND PFI#: Zoz-00 0
ENGINEERING DEPARTI\�N�
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION TYPE OF WORK
Project name: PGE Job # M2837157
8 TYPE 1—Franchise Utility Work
Brief description of project: Replace 2 laterals and 5 2/0 elbows in Vault 14 performed by WN,PGE, or utility
agency
❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION %G gSj • Sanitary sewer lateral installation and
U c (�,{ ,-I,, main line tap
Location (address if available): I `1 ` t"� cv. ❑ TYPE 3—Full Scale Development Work
Across from 13902 SW Walnut Creek Way performed with land use approval which
includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: PGE [Submitted by Amy Sweany] • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and 'Tigard
Mailing address. 2213 SW 153rd Drive water service area
City/State: Beaverton, OR Zip: 97003 ❑ TYPE 4—Small Cell Technology
Phone:
503-612-2935 ❑ 'TYPE 5—Tigard Triangle
Email: preregcoord@pgn.com Phone: 503-612-2935 NOTE: Type 1 and 2 applications may be
Contact name: Amy Sweany emailed to rowpermits9figard-or.gov.
Phone: 503-612-2935 Ems: preregcoord@pgn.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: Portland General Electric CCB Number:
Mailing address. 2213 SW 153rd Drive City/State: Beaverton, OR Zip: 97003
Phone: 503-464-7777 Ems: preregcoord@pgn.com
ENGINEER INFORMATION
Name: N/A
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes 0 No Case number:
Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant, certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
6K 1 c�Scuaa+t Amy Sweany for PGE 1/20/20
Applicant's or au orized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: 2rs7,c3—�(�(1�d Permit fee: 0d,. � Received by:
—2 ' Date: 1-L2—Zvtiv
Approved by: Date: i12z�2O2 Notified by: o�Dater
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3: DETAILED SUBMITTAL
REQUIREMENTS
CHECKLIST
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro
❑ Street Name
How many install sites are proposed as part of this permit El Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following. items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4
Edge of Favement
Ditch ..moi.
Streetlight I —
•
---•—•—•—•—• —•—
I ! A tP a
� I
' T"P'i o�os rTiif�" 1
I N! Existing House 1
Existing j
>a Driveway
i
a
`d
V
al
1
-E I I a,b 1
Existing Shap 1
Powe
I a 95' j
1 -------doper L7-_e—-—-—-—-—-
' I
! I Fire Hydrant(FH)
1 I Scale '1"=30'
� i I
TYPE 1
� I I
� I I
� � I
1 TYPE 2:
REQUIREMENTSMINIUM SKETCH
North arrow Property lines&dimensions Existing utilities locations
(sewer, storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4
o n
3 M
�h sr �
13902 Southwest
Walnut Greek Way
or M
1 3
S s
Iepubiiea
931%41'931%41' . c O` �t'y` W Walnut Cs
1-North d/
1 14 4 0�
� 2
ah, 5� Sw
ff 25 W543 �'i,4f Walnut St
/ P%2 1s ar
siy
J / chPha/Pm�t
14115
f
O�
,m f�r
20� /
s�
S
rdust Ln
ta131 SW ta
�
Replace 2
laterals and PGE CONSTRUCTION DRAWING
52/0 VIOo A IONS CORRECTED
elbows in Foreman: Date:
General Foreman: Date:
s DalumDu#edIofield c—f—ton cha .VauIt 14 SDPMENG REVIEWASBUILTBYDESIGN
ER:
c L -
0/20
JAWU M2837157
TITLE
Portland General Electric
N1, 'ff&&AYHILL-MURRAYHILL 13 SIZE
ATTENTION: CALL 811 BEFORE YOU DIG 11 x 17
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED .+'y D OCAT/ON
BY THE OREGON UTILITY NOTIFICATION CENTER. $ • GE Across from 13902 SW Walnut Creek Way
THOSE RULES ARE SET FORTH IN OAR 951-001-0010 THIN K
RIGHT-0OFPERMIT NOTICE:—_— SC IPTIO
THROUGH 951-001-0090 YOU MAY OBTAIN COPIES OF , A PERMIT FROM THE LOGY.AIRISDICTION IS REQUIRED BEFORE ANY WORk 99epalace�laterals and 52/0 elbows in Vault 14 SHEET
THE RULES BY CALLING THE OREGON UTILITY SAFETY IN THE RIGHT-OF-WAY MAY BE PERFORMED.ONLY PGE APPROVED COUNTY SECTIONS WORK WITH
NOTIFICATION CENTER ADMINISTRATION @/501-231-1987/ CONTRACTORS AND CONRIACT02S WHO WIVE MADE OTHER SPECIAL Washington C2 04B 1 OF 1
TO REQUEST LOCATES CALL THE OREGOA Klrowwhat%hClow. FIRST AGREEHENTSWrTHPGEMUSEALLOWEDTOWORRUNMMESPERMR.
THE CONTRACTOR MUST NOTIFY THE LOCAL JUOSDICTION%NOURS YERrdi DESIGN BY PHONE DRAWN BY
UTILITY NOTIFICATION CENTER,811 AT LEAST �al� YDS dig. BEFORE NARK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON BRE. N LNRE DREW DENTE" Am Swean 503-612-2935
2 BUSINESS DAYS PRIOR TO EXCAVATION 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
Page 54 2011 Edition
Pedestrian Accommodation Diagrams
See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work
zones.
Pedestrian Accommodation Principles:
1. If the work impacts the sidewalk or pedestrian facility, provide a safe,
accessible path, where practical, in accordance with the requirements
of the ADA.
2. If not practical to match the width of the existing pedestrian facilities,
maintain a 4-ft minimum width.
3. Unless a reasonably safe route can be provided through the work
space, pedestrians should be appropriately directed with advance
signing to cross the road. Do not divert pedestrians into travel lanes.
4. Install pedestrian closure or detour signing on Type II barricades.
Make every practical effort to satisfy the following:
• If work closes a sidewalk or sidewalk ramp, close sidewalks at a point
where an alternate crossing point or route can be provided. Minimize
the amount of out-of-direction travel for pedestrians.
• Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK
CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD
CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE"
(R9-11a)signing to direct pedestrians to an alternate facility.
• Where there are business destinations between the nearest crosswalk
and the work area, close the sidewalk at the business access nearest
the work area, where practical using the SIDEWALK CLOSED sign.
Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the
• nearest crosswalk prior to the closure.
Chapter 5 September 2016
Page 56 2011 Edition
Pedestrian Accommodation, Intersection Diagram 5-8
For work near an intersection, close crosswalks and/or sidewalks as
necessary when safe passage cannot be maintained.
SIDEWALK CLOSED
�---►
USE OTHER SIDE
I
24X12
Type"W1
(Mount on B(II)LR)
ROAD
WORK
AHEAD
(Optional)
SIDEWALK CLOSED
SIDEWALK CLOSED -�
�- CROSS HERE
USE OTHER SIDE SIDEWALK 24x12
24x12 CLOSED Type'Wt"
Type'Wi' (Mount on B(II)LR)
(Mount on B(II)LR) 24x12
Type"W1"
(Mount on B(II)LR)
61DEWAU(CLOSED
AHEAD
CROSS MERE
24x18
Type"W1,.
(Mount on B(II)R)
ROAD
WORK
AHEAD
(Optional)
Chapter 5 September 2016
Page 52 2011 Edition
Bicycle and Pedestrian Accommodation Diagrams
The following practices and details address the accommodation of bicycles
and pedestrians within work zones. The following detail drawings should be
incorporated, where appropriate, into the traffic control plan for any short
term work.
1. See Section 1.6—Bicycle and Pedestrian Considerations for additional
guidance.
2. Stay alert for pedestrians and bicycle traffic and accommodate safe
passage for them, as needed.
3. The work space should be protected from bicycle and pedestrian
intrusion by using barricades or closely-spaced channelizing devices.
4. Maintain access to transit stops or clearly close a transit stop using
barricades or channelizing devices.
Bicycle Accommodation Diagram 5-6
Bicycle Accommodation Principles:
1. If a significant volume of bicycles can be expected and work closes a
marked bicycle facility, or requires bicycles to share a travel lane,
install a "(Bicycle)ON ROADWAY"sign (CW11-1)or the Bicycle
symbol (W11-1)sign with an"ON ROADWAY" (OBW1-5)rider, in
advance of the work area.
2. Install temporary signing off the paved shoulder, within the planter
(buffer)strip, or share the width needed between the shoulder and the
sidewalk, as available.
3. Signs are to remain in place until the surface is restored and the width
made available for bicycle use. See Diagram 5-6 for typical bicycle
signing placement.
Sign Spacing and Buffer Lengths(feet)
Posted Spadng Between Sgra "Buffer"
Speed A B C Spam
20 SO
25 100 100 100 7S
30 100
40 350 350 350 1550
45 180
50 S00 500 S00 210
55 2S0
60 28S
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 53
Bicycle Accommodation Diagram 5-6
I i
I
NOTES:
• Bicycles on Roadway(CW11-1)sign should not
interrupt standard sequences. For example:
I
o BE PREPARED TO STOP/Fla er Symbol
mbol y
o _LANE CLOSED AHEAD/Lane Ends
Symbol
• Bicycles on Roadway sign typically follows ROAD
I
WORK AHEAD sign and used as general warning.
I
I
I
I
It
I I
I I A
I I
I I
I I
I I
I I
I I
A
I I
I I
I�
I I
I I B
I I
I I
♦ I� ON
I ROADWAY
I I
I I
I I
ROADS
WORK
AHEAD
September 2016 Chapter 5
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Potted Specing Between Signs "Buffer"
Speed A B C Spam
20 50
25 100 100 100 75
30 100
40 350 350 350 US
ISO
45 ISO
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
ROAD
WORK
AHEAD
DNE LANE c 1 1
ppbORen ROAD
MEAD
B
BE
PREPARED
TO STOP
B
A (optional)
•
• ONE NNE
ROAD
AD
• BE MEROAD
100t.Mex. PREPARED
• TO STOP
WORK
• AHEAD
A B B C
Buffer
100 h.M—
C B B A
ROAD BE
WORK PREPARED •
AHEAD TO STOP 100t M".
ONE LANE � ••
ROAD I AHEAD
Tt
(Opnone) A
B
BE
PREPARED
TO STOP
B (opuorlm
ONE
1 1
ROAD
AHEAD
c
ROAD
WORK
AHEAD
September 2016 Chapter 5