Permit (4) CITY OF TIGARD ELECTRICAL RESTRICTED ENERGY PERMIT
COMMUNITY DEVELOPMENT Permit#: ELR2020 00014
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/22/2020
TIGARD Parcel: 2S112DB00300
Jurisdiction: Tigard
Site address: 7257 SW KABLE LN 100
Project: Trane Subdivision:HERN PACIFIC TIGARD INDUSTRIAL Lot: 5
Project Description: Low voltage for Access Control and Security systems.
Contractor: AROCK TECHNOLOGIES LLC Owner: PACIFIC REALTY ASSOCIATES
PO BOX 2320 ATTN: N PIVEN
OREGON CITY, OR 97045 15350 SE SEQUOIA PKWY#300
PORTLAND, OR 97224
PHONE: 502-0306 PHONE:
FAX:
FEES
Description Date Amount
Specifics: Restricted Energy Permit 01/22/2020 $150.00
12%State Surcharge-Electrical 01/22/2020 $18.00
Type of Use: COM
Class of Work: ALT
Total Number of Systems: 2
Audio&Stereo: 0 Boiler Controls: 0
CCTV: 0 Clock Systems: 0
Data&Telecommunications: 0 Fire Alarm: 0
HVAC: 0 Instrumentation: 0
Intercom/Paging: 0 Landscape/Irrigation: 0
Landscape Lighting: 0 Medical: 0
Nurse Calls: 0 Protective Signal: 0
Security Alarm: 1 Other: 1 Total $168.00
Other Desc: Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspend d for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Tho4e rules e set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.27 987 p.332 44
Issued By: y Permittee Signature: 7/1/4'
`;
OWNER INSTALLATION ONLY
The installation is being made on property I own which is not intended for sale,lease or rent.
OWNER'S SIGNATURE: Date:
CONTRACTOR INSTALLATION ONLY
SIGNATURE OF SUPR.ELEC' Date:
LICENSE NO.
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Electrical Permit Application FOR OFFICE t SE OyI.1
City of Tigard RECEIVED Date/Bed mom r7,i `�
:' - 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
Phone: 503.718.2439 ,�A N 2 2 2020 Date/B : Related Permit#: ; a _, r 9
Email: TigardBuildingPermits@Tigard-or.go Ready Date/By: Juris: n See Page 2 for
1 I GA K D Inspection Line: 503.639.4175 Intern Notified/Method: ' j r Supplemental Information
TYPE OF WORt LDING PLAN REVIEW
El New construction JAddition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked):
O Service or feeder 400 amps or more 0 Building over three stories.
El Demolition 0 Other:
where the available fault current ❑Marinas and boatyards.
CATEGORY OF CONSTRUCTION exceeds 10,000 amps at 150 volts or ❑Floating buildings.
El1-and 2-family dwelling ❑Commercial/industrial 0 Accessory building less to ground,or exceeds 14,000 0 Commercial-use agricultural
Multi-familyMaster builder Other: amps for all other installations. buildings.
❑ ❑ ❑ 0 Fire pump. ❑Installation of 150 KVA or
JOB SITE INFORMATION AND LOCATION ❑Emergency system. larger separately derived
❑Addition of new motor load of system.
Job#: I Job site address: "7 5 7 S 1n1 /a b l e /g J OC 1 OOHP or more. ❑"A",`B","t-2",`°1-3",
City/State/ZIP: _ El Six or more residential units. occupancy.
r^/< ❑Health-care facilities. ❑Recreational vehicle parks.
Suite/bldg./apt.#: GCi I Project name: �'�� El locations. El Supply voltage for more than
J r 0 Service or feeder 600 amps or more. 600 volts nominal.
Cross street/directions to job site: 1a „c_/ Arc FEE SCHEDULE
Description I Qty. I Each I Total
New residential single-or multi-family dwelling unit.
Subdivision: I Lot#: Includes attached garage.
1,000 sq.ft.or less 168.54 4
Tax map/parcel#: Ea.add'l 500 sq.ft.or portion 33.92 1
DESCRIPTION OF WORK Limited energy,residential 75.00 2
4 ' . ` ) / y (with above sq.ft.)
�CeS5 f l Sec r/( t /2
Limited energy,multi-family
residential(with above sq.ft.) 75.00 2
Renewable Energy 0 See Page 2
0 PROPERTY OWNER I 0 TENANT Services or feeders installation,alteration,and/or relocation
Name: 200 amps or less 100.70 2
Address: 201 amps to 400 amps 133.56 2
401 amps to 600 amps 200.34 2
City/State/ZIP: 601 amps to 1,000 amps 301.04 2
Phone:( ) Over 1,000 amps or volts 552.26 2
Temporary services or feeders installation,alteration,and/or
Email:
relocation
Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1
intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps _ 125.08 2
Owner signature: Date: 401 amps to 599 amps 168.54 2
0 APPLICANT I 0 CONTACT PERSON Branch circuits—new,alteration,or extension,per panel
A.Fee for branch circuits with
Business name: ;, s> —I each
service or feeder fee, 7.42 2
each branch circuit _
Contact name: B.Fee for branch circuits without
Address: service or feeder fee,first 56.18 2
branch circuit
City/State/ZIP: Each add'I branch circuit 7.42 2
Miscellaneous(service or feeder not included)
Phone:( ) Each manufactured or modular
dwelling,service and/or feeder 67.84 2
Email: Reconnect only 67.84 2
CONTRACTOR Pump or irrigation circle 67.84 2
Business name: A r c,do Te-citixo /c sc c s Sign or outline lighting 67.84 2
Address: Signal circuit(s)or limited-energy d2r See Page 2 l
0 Q 33. C panel,alteration,or extension.
City/State/ZIP: (Jj} / Each additional inspection over allowable in any of the above
tti D t (. 4 y/ ( 9 wL/s Additional inspection(1 hr min) 66.25/hr
Phone:(5)3 '7) I . —a 7 1 Investigation(1 hr min) 90.00/hr
Email: ct vl ciPin.), p la K VC O.fre Lic-- -ce it . C e vi-A Industrial plant(1 hr min) 78.18/hr
Inspections for which no fee is 90.00/hr
CCB Lic.:aa755 Electrical Lic.: GLt[ 3 Suprv. Lic.:St-1aS4.L specifically listed('/=hrmin)
�113 aq ✓,� 7� ELECTRICAL PERMIT FEES
Suprv.Electrician signature,required: r
tA(v Subtotal: !��
Print name: /70/ > /--} f Date: a ) —2_ 0 Plan Review Required(25%of permit fee):
d State surcharge(12%of permit fee): (i `1
Authorized signature: TOTAL PERMIT FEE: ��g,
g 42
This permit application expires if a permit is not obtained within 180
Print name: 40/r1Gt,.i I)/f 14 i Date: 2.[,i days after it has been accepted as complete.
* Number of inspections allowed per permit.
1:\Building\Permits\ELC_PermitApp_ELR_ERE.doe Rev 10/26/2017 440-4615T(11/05/COM/WEB
Electrical Permit Application—City of Tigard
Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
RESIDENTIAL WORK ONLY: FEE SCHEDULE
Description I Qty. I Each I Total [ *
Fee for all residential systems combined: $75.00 Renewable electrical energy systems:
Check Type of Work Involved: 5 kva or less 100.70 2
5.01 to 15 kva 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
n B• urglar Alarm 25.01 to 50 kva 301.04 2
50.01 to 100 kva 552.26 2
❑ Garage Door Opener* >100 kva(fee in accordance 552.26 2
with OAR 918-309-0040)
n Heating,Ventilation and Air Conditioning Solar generation systems in excess of 25 kva:
System* Each additional kva over 25 7.42 3
n V• acuum Systems* >100 kva-no additional charge 0.0 3
Each additional inspection over allowable in any of the above:
I I O• ther: Each additional inspection is 66.25/hr
charged at an hourly(1 hr min)
Inspections for which no fee is 90.00/hr
specifically listed('/hr min)
COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES
Fee for each commercial system: $75.00 Subtotal(Enter on Page 1):
y * Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
❑ Audio and Stereo Systems
n Boiler Controls
n Clock Systems
Data Telecommunication Installation
❑ Fire Alarm Installation
n HVAC
❑ Instrumentation
n Intercom and Paging Systems
❑ Landscape Irrigation Control*
n M• edical
n Nurse Calls
❑ Outdoor Landscape Lighting*
n Protective Signaling
n Other: t �: .
Total number of commercial systems: X
*No licenses are required. Licenses are required for all
other installations
I:\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 10/26/2017