Loading...
Report (2) „,a,F 7409 SW Tech Center Dr.Ste. 145 4111=ov sir£ Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 OILS 503.443.3799 Special Inspection Final Report Date: January 22,2020 Job#19-8641-34 Permit#BUP2019-00305 Mail To: Project: NORTHWEST HANDLING SYSTEMS BIAMP SYSTEMS 18008 NE AIRPORT WAY 8005 NW HUNZIKER ST PORTLAND, OR 97210 PORTLAND, OR 97223 To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed for the following: Anchors—Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. Id...4)(72./\4A” Approved by: Bob Brown/President BB/KS Proud to be NationallyAccredited byInternational Accrediting Service � ACCREDITED