Report (2) „,a,F 7409 SW Tech Center Dr.Ste. 145
4111=ov sir£ Tigard,OR 97223
Ph:503-443-3799 Fax:503-620-2748
OILS
503.443.3799 Special Inspection
Final Report
Date: January 22,2020 Job#19-8641-34
Permit#BUP2019-00305
Mail To: Project:
NORTHWEST HANDLING SYSTEMS BIAMP SYSTEMS
18008 NE AIRPORT WAY 8005 NW HUNZIKER ST
PORTLAND, OR 97210 PORTLAND, OR 97223
To Whom It May Concern:
ACS Testing, Inc. attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
for the following:
Anchors—Expansion
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.
Id...4)(72./\4A”
Approved by:
Bob Brown/President
BB/KS
Proud to be NationallyAccredited byInternational Accrediting Service
�
ACCREDITED