Loading...
Report ryi57 aorg - o03q6 I !4IHCE Horn Consulting Engineers LLC r ;;,1) At. c, 4;44, Memo: SIM o► .: To: City of Tigard \LAGor( From: David J. Horn 1; Date: 1/17/2020 Re: 14425 McFarland Tigard, OR We have reviewed the design, construction plans, and made a site visit to the above-mentioned residential addition /new garage project. Stone Age Construction has poured the concrete stem walls with #4 verticals spaced at 16" O.C. We find that this is acceptable with no further work required. 7412 SW Beaverton-Hillsdale Hwy, Ste 202 Portland, OR 97225 Phone: 503.892.5782 Email: dave@a hornce.com