Report ryi57 aorg - o03q6
I !4IHCE
Horn Consulting Engineers LLC
r ;;,1)
At. c, 4;44,
Memo:
SIM o► .:
To: City of Tigard \LAGor(
From: David J. Horn 1;
Date: 1/17/2020
Re: 14425 McFarland
Tigard, OR
We have reviewed the design, construction plans, and made a site visit to the above-mentioned
residential addition /new garage project. Stone Age Construction has poured the concrete stem walls
with #4 verticals spaced at 16" O.C. We find that this is acceptable with no further work required.
7412 SW Beaverton-Hillsdale Hwy, Ste 202 Portland, OR 97225
Phone: 503.892.5782 Email: dave@a hornce.com