Report (2) rnsT �o! — ov `lIl
770a sw /-1,4T-11•,/
GREEN MOUNTAIN
Ill" structural engineering
Memorandum
January 9, 2020
To: Amilian Avgi, Riverside Homes
From:Corina Muntean, P.E
Re: Plan 2885 at Elderberry Ridge Lot 13
I understand that the garage shear wall does not meet the 3.5:1 ratio that is
noted on detail 11 on S2 or permit drawings. We recommend that the inside of
the pier be sheathed and nailed as shear wall type D.
If you have any questions, don't hesitate to ask.
oO FR are,
Lu 49' 78PE '9 v
r
OREGON q
004k- 12, \q �`
MU �
`EXPIRES IS• 31 -IQ o
greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607