Loading...
Report (2) rnsT �o! — ov `lIl 770a sw /-1,4T-11•,/ GREEN MOUNTAIN Ill" structural engineering Memorandum January 9, 2020 To: Amilian Avgi, Riverside Homes From:Corina Muntean, P.E Re: Plan 2885 at Elderberry Ridge Lot 13 I understand that the garage shear wall does not meet the 3.5:1 ratio that is noted on detail 11 on S2 or permit drawings. We recommend that the inside of the pier be sheathed and nailed as shear wall type D. If you have any questions, don't hesitate to ask. oO FR are, Lu 49' 78PE '9 v r OREGON q 004k- 12, \q �` MU � `EXPIRES IS• 31 -IQ o greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607