Specifications 149714 sal BELVote r
GREEN MOUNTIAIN RECEIVED
JUN 132019
111110 structural engineering CITY OFTIGARD
BUILDING DIVISION
STRUCTURAL CALCULATIONS
Plan 2885
Elderberry Ridge, Lot 5
Tigard, Oregon
Contractor:
Riverside Homes
<(,,° PR"es
49 APE9
cr
OREGON
f 141
[EXPIRES t2 1
Project Number: 17485
May 20, 2019
Index
Structural Information
Lateral Analysis L-1 thru L-15
greenmountainse.com-info@greenmountainse corn-4857 NW Lake Rd.,Suite 260.Camas,WA 98607
GREEN MOUNTMIIN
1%11, structural engineering
STRUCTURAL DESIGN INFORMATION
GOVERNING CODE: 2015 International Residential Code(IRC)
2015 International Building Code(IBC)
This engineering pertains to the design of the Lateral Force Resisting System and a review of
the home designer's framing and foundation plans. The home designer is responsible for
making any necessary changes as required by these calculations to their framing and
foundation plans.
1. Dead Load:
A. Roof 15 psf
B. Floor 10 psf
C. Exterior walls 10 psf
D. Exterior walls with veneer 50 psf
E. Interior walls with gypboard each side 5 psf
2. Live load:
A. Floor 40 psf
B. Decks&Balconies 60 psf
3. Snow load:
A. Uniformly distributed snow load on roof 25 psf
4. Wind load-based on ASCE 7-10 CH 27 MWFRS Directional Procedure:
A. 3 Second Gust Wind Speed V=126 mph
B. Exposure B
C. Importance factor I=1.0
D. Topographical Factor Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
5. Seismic load-based on ASCE 7-10 Section 12.14:
A. Mapped Spectral Acceleration for short periods Ss=1.0
B. Mapped Spectral Acceleration for 1 second period S1=0.34
C. Soil Site Class D
D. Ductility coefficient R=6.5
E. Seismic Design Category D
6. Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
7. Retaining wall lateral loads:
A. Walls free to displace laterally at top 40 pcf
B. Walls restrained against lateral displacement at top 45 pcf
8. Concrete:
A. 28 day design strength F'c 3000 psi
B. Reinforcing bars ASTM A615,Grade 60
greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607
GREEN MOUNTS IN PROJECT: Riverside - 2885
IOW structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-1
LATERAL
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2•Sps
SEISMIC BASE SHEAR V:= W (EQ.12.14-11 with F=12)
R
S mapped spectral acceleration for SS := 1.00
short periods(Se c.11.4.1) from USGS web site
5 mapped spectral acceleration for St:= 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.4-1) Fa 1'1 Based on Soil
F„ Site coefficient(Table 11.4-2)
F := 1.8 Site Class D
SMS:= Fa'Ss SMS= 1.1 (Eq.11.4-1)
SMS:= F„•S1 SM1= 0.61 (Eq.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS•= 3•SMS O.l; > (.�.50g
SEISMIC
2 CATEGORY
Spy:= 3•SMi SDS C i1 > IJy D per Table 11.6-1
WOOD SHEAR PANELS
1.2 Sps
R:= 6.5 Table 9.52.2
V:_ •W
R
12.0.73
V:= •W V:= 0.1354
6.5
12.4 Seismic Load Combinations
1!) (Eq.12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS
11
GREEN MOUNTIFIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-2
LATERAL
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
■ .
11 7.4
ps f psf
�' Wind Base
Shear
Length L:= 52•ft
Height Ht:= 24•ft WIND:= L•Ht.(11•psf+ 7.4.psf)
SEISMIC WIND= 22963.2 lb
Fr Wroof
F2 — Wfloor Seismic
Wwal I
Base Shear
Aroof:= 52•ft•40•ft Aroof= 2080ft2
Afloor 43•ft•40•ft Afloor=1720ft2
Wwalls 4.52•ft•20•ft Wwalls= 4160ft2
SEISMIC:= (Aroo{•15•psf + Afloor•15•psf+ Wwaiis•10•psf)•0.123 SEISMIC= 12127.8 lb
WIND GOVERNS DESIGN
GREEN MOUNTS IN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-3
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:= .00256•KZ•Kn Kd•V2•I (Eq.6-15)
EXPOSURE
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I := 1.0
TOPOGRAPHICAL FACTOR Krt:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' KZ:= 057 q2:= .00256•KZ•Krt•Kd•V3s2•I qZ= 19.69
(varies/height)
15-20' KZ:= 0.62 qz:= .00256•KZ•Krt•Kd•V3s2I q2= 21.42
20'-25' KZ:= 0.66 qz:= .00256•KZ•Kn•Kd•V3,2•I qz= 22.8
25-30' KZ:= 0.70 qz:= .00256•Kf Ict•Kd.V352-I qz= 24.18
II
GREEN MOUNTnIN PROJECT: Riverside - 2885
IOW structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-4
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= qZ•G•CP G:= 0.85 Gust factor
CP pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-15' WINDWARD PW:= 12.4.psf•0.85.0.8 PW= 8.43 psf
LEEWARD Pi.:= 12.4•psf•0.85.0.5 PL. = 5.27 psf
1B-20' WINDWARD PH,:= 13.49.psf•0.85.0.8 PW= 9.17 psf
LEEWARD Pt, := 13.49.psf•0.85.0.5 PL = 5.73 psf
2a-25' WINDWARD PW:= 14.36.psf•0.85.0.8 P,v= 9.76 psf
LEEWARD PL := 14.36•psf•0.85.0.5 PL= 6.1 psf
AT ROOF
0'-15' WINDWARD PN,:= 12.4.psf•0.85.0.3 PW= 3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL = 6.32 psf
1B-20' WINDWARD PW:= 13.49•psf•0.85.0.3 PW= 3.44 psf
LEEWARD PL := 13.49.psf•0.85.0.6 PL = 6.88 psf
2a-25' WINDWARD PW:= 14.36.psf•0.85.0.3 P,y= 3.66 psf
LEEWARD Pi_ := 14.36•psf.0.85.0.6 Pi_ = 7.32 psf
26-30' WINDWARD PW:= 15.23•psf•0.85.0.3 PW= 3.88 psf
LEEWARD PL := 15.23•psf•0.85.0.6 PL= 7.77 psf
GREEN MOUNTnIN PROJECT: Riverside - 2885
111110 structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-5
LATERAL
WIND DESIGN IS EASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
;sf
;618 Assume
Cp-0.5 f e
‘. 1 A
4111iir ill6iiihk
Cp--o.6
I
1
8ft
a 17
psf 6.1
psf
IE.
Mean Roof Height
ocT te
18+ 22
= 20
2
Loads at Roof roof-ave
Windward 3.44.psf•5.5•ft= 18.92 plf
Leeward 6.88•psf•5.5•ft= 37.84 plf
Wall loads at upper level at main level
Windward 8.43psf•4•ft= 33.72pIf 8.43-psf-8.5•ft= 71.66 plf
Leeward 5.73•psf•4•ft= 22.92pIf 5.73•psf•8.5•ft= 48.71plf
eh
iv .tV, 4 , Roof A(344.041)
for rr + n L-6
1
t 111
16 7
11
II
• .1 I 11
n t
M in PRE MFG. - -- S 0 24" P.C.
, 0 ,
ii '."�_ ___ _OtRDER TRUSS M
r
_ �i111l1i�4►!i♦i�►�►!!1!♦�,�ili�1►����i!v.!!!!!1♦!!!//
d44!'+►!!!!i!!!!i!i!!s'A'+1 ,♦!•�►!i!i!!!i♦!!!!i!~♦♦!i/, —
4+►♦!i►i!♦!lhilil/�► ►1��►!i!!i!!!!!i!!!lile �r—
_ N y"X111i��1♦"♦��-'i-/-i►♦i!♦♦♦li��
♦!!!+♦•1♦+I
,� o !i♦!!!i♦i4!►4) S•41.!!lliii♦iCo!
,.. ::,•: ie /
[---------178
0 1 •V•i 1►1'ie L •ly"~
❑ ❑
0
moi•►i/'
4• 0 0 �('�
r
III � ►1i k]
r 1. RIDGE
❑ -
A
V ."--i .......... .....
''!'!v
/ v'!'!`.
/!+!!�1♦!!!!!!.
_1 ill�����•
!,w_.^-1111._
/ 1/1►11+/!!+► .
y�i♦!!1♦'V 'V!!V'V V'i -'V'V'i♦V\
♦1i ♦ ►!/i!♦1♦♦i .
/1!!1111♦ ' .. 111!♦!!ll4
1. -
/l/ii!l�i1►ri►!!!ii!!!! /.
.!!♦♦!!�!! !+ 1„•!.
/!!!i!♦ 00, 4*i 14►!!!,g, ,ii♦i Iii♦.
:♦iiiiiitc fY♦lam+• '!l�®1:. 4:P. ce,
P = MFG. - SSES 0 24' Q.C, J,
Tt=
►' '
{ �; i►1/.
II
-�1j/ ❑
ritillintn 4 ((H ' PORCH ATM
®� w
. *II • ROOF GUEST•SDRM7 AT
JACKS 4r./4r./
0 24' O.C. � ® OI I®
PRE. MFG. W/ t'-6" RAISED 1
TRUSSES HEEL
O/24' 0.C.
HEEL'_6' RAISED11 J.•
O
C
Cv.
liouavt 1OfE,
t r 's- int,..
L-7
❑ Ll
II III
I I III
I I
1 I MASTER III
eAni
T
M ASTER
III BEDROOM
1
BEDROOM
TWO t UN
1IC' ../11 SL
T O III
III III
1'
L..t, -3 _ _ , Pers T'� I
0
$ATH �1 1 f 1 I
Q L.J I
a,
rir(LAUNDRY 14
inl l Iq I °TUU
C� J
I NMS I �- Y/ L PBS
-{ -4-42I
I I Z 0 ,La.'«s-...timC
ti✓ I I O ix� --I •
{J{ PBS V
11 I
J �� • LOFT
BEDROOM BEDROOM
THREE FOUR
L,..0„, i--+y
( .,,
tii
6046 XO SLIM. 6046 XO SLDR. 2030 6030 PIC.
(EGRESS) (EGRESS) WO.
t 1-- (.1,rit.... t i
IL, i..,,
10107 lakes g.
..____Aiii,k 1.04
o, L. L-8
L.
PATO ..>
J�'�
It /{
..> �w/
___
I
11 1
.......—....1 DINING
ROOM GREAT
ROOM
POFFICE OCKET r==41
l II
\s, II
—
1 t v
I TYPICAL
STAIR I I I
r N'-1, ii DETAIL
I 11
i iI it i
I` I) KITCHEN 1 1111111 io••••""m
I y
i
i --F--- lil I I i
Iliisf
i 1 1III1
i in
L. v
40(p, TYPIC►
. ..
{� WALL
DETAIL
I 0 1"��"1
1 w.Lc. II i 1-1
GARAGE I
FOYER I
O
r
� 0 k •+--— 1
Is /'W
—
—=. DDENii 1
it
i I I 11
11 11
II
aiami J . I., /1V
ke.20tAt, 4 1
1./1*0 4-4
GREEN MOUNTS IN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-9
LATE RAL
SHEAR WALL DESIGN
Pdl f dl
I Wdl
p P:= wind
V:= seismic
h
R=Holdown
Force
Based on 2012 IBC Basic Load Combinations 1605.3.1
O
(--)0 w tr (Equation 16-11)
0.6 0 0,7 E (Equation 16-12)
Overturning Moment: Mot:= F h
L2
Resisting Moment: Mr:= 0.6 (Wdi + Wwaii�•(2 + 0.6•Pdi•L
Mot— Mr
Holdown Force R
L
GREEN MOUNTnIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB No: 17485 SHEET: L-1O
LATERAL
Left El evation Exterior Wal Is
Second Level
Wind Force P:= 2260•Ib P= 22601b
Length of wall L:= 5•ft+ 4•ft+ 19•ft L= 28ft
P
Shear v:= - v= 80.71pif A
5
Overturning Mot:= P.8•ft•— Mot= 3228.57lb-ft
Moment 28
(5.ft)2
Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf 8 ft)• 2 + 0.6•600•Ib,5•ft
Moment
Mr = 2625 Ib•ft
Mot- Mr
Holdown = 120.71 lb
Force 5ft
Main Level
Wind Force P:= 46601b P= 4660 lb
Length of wall L:= 14•ft+ 10•ft+ 8•ft L= 32ft
P
Shear v:= - v= 145.63plf
8
Overturning Mot:= •—32 Mot= 10485lb•ft
Moment
(84-02
Resisting Mr:= 0.6•(15•psf.2.ft+ 10•psf.17•ft)• 2 + 0.6 800 lb•8 ft
Moment
Mr = 7680lb•ft
Mot- Mr
Holdown = 350.63 lb
8•ft
Force
GREEN MOUNTFIIN PROJECT: Riverside - 2885
1411" structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-11
LATE RAL
Front Elevation Exterior Walls
Second Level
Wind Force P:= 2373.1b P= 2373 lb
Length of wall L:= 3.5•ft+ 3.ft+ 3.5.ft+ 3.5•ft L=13.5ft
P
Shear v:= — v-- 175.78plf B
L
3.5
Overturning Mot:= P•8•ft•— Mot= 4921.78 lb ft
Moment 13.5
(3.5•ft)2
Resisting Mr:= 0.6.(15•psf.4.ft+ 10 psf-8-ft). 2 + 0.6.600•Ib•3.5•ft
Moment
Mr = 1774.5lb•ft
Mot- Mr
Holdown = 899.22 lb
Force 3'S ft MSTC48B3
Main Level
Wind Force P:= 2988•Ib P= 2988lb
Length of wall L:= 2.25•ft+ 2.25•ft+ 1.5•ft + 1.5•ft L= 7.5ft
2.25.3.5 = 7.88
P
Shear Wind v:= — v= 398.4 plf D
L
2.25
Overturning Mot:= P•7.88•ft•— Mot= 7063.631b ft
Moment 7.5
(2.25•ft)2
Resisting Mr:= 0.6•(15•psf4•ft+ 10•psf•8•ft)• 2 + 0.6.800 11).2.25 ft
Moment
M
Holdown of - 2564.89 lb
Mr= 1292.63 lb•ft
Force 2.25.ft
HITS
II
GREEN MOUNTVIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-12
LATE RAL
Right Elevation Exterior Wal Is
Second Level
Wind Force P:= 2260-lb P= 2260 lb
Length of wall L:= 8•ft+ 5•ft+ 4•ft L= 17ft
P
Shear v:= - v= 132.94pIf A
4
Overturning Mot:= P•8•ft•— Mot= 4254.121b.ft
Moment 17
(4.ft•)2
Resisting Mr:= 0.6-(15.psf•2•ft+ 10•psf•8•ft)• 2 + 0.6.600-Ib.4-ft
Moment
Mr = 1968 lb•ft
Mot- Mr
Holdown = 571.53 lb
Force Oft
Main Level
Wind Force P:= 4660-Ib P= 46601b
Length of wall L:= 15•ft+ 8•ft+ 3•ft L= 26ft
P
Shear v:= - v= 179.23pIf
8
Overturning Mot:= P•9•ft•26 Mot= 12904.62lb-ft
Moment
(8.ft)2
Resisting Mr := 0.6•(15-psf•2•ft+ 10-psf•17•ft) 2 + 0.6.800•1b-8-ft
Moment
Mr = 7680lb-ft
Mot- Mr
Holdown = 653.08 lb
8•ft
Force
GREEN MOUNTnIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB No: 17485 SHEET: L-13
LATERAL
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 2373•lb P= 2373 lb
Length of wall L:= 7.5•ft+ 11•ft+ 4•ft L= 22.5ft
P
Shear v:_ - v= 105.47 plf A
7.5
Overturning Mit:= P 8 ft.— Mat= 63281b•ft
Moment 22.5
(7.5•ft)2
Resisting Mr := 0.6.(18psf•2•ft+ 10•psf•12-ft)• 2 + 0.6.600•Ib-7.5 ft
Moment
Mr = 5231.25lbft
Mit - Mr
Holdown = 146.23 lb
Force 7.5•ft
Main Level
Wind Force P:= 3813•Ib P= 38131b
Length of wall L:= 6•ft+ 7•ft+4•ft L=17ft
P
Shear Wind v:_ - v= 224.29 plf S
4
Overturning Mot:= P.9•ft•17 Mot= 8074.59lb•ft
Moment
(4•ft)2
Resisting Mr:= 0.6•(15•psf.4•ft+ 10.psf•8.ft)• 2 + 0.6.800•Ib•4-ft
Moment
Mot- Mr Mr= 2592lb•ft
Holdown = 1370.65 lb
Force 4 ft
HITS
GREEN MOUNTPIIN PROJECT: Riverside - 2885
IOW structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-14
LATERAL
Interior Shear Walls at back of Garage
Main Level
Wind Force P:= 4069•I b P= 40691b
Length of wall L:= 18•ft L= 18ft
P
Shear Wind v:= — v= 226.06plf B
Overturning Mot:= P•9•ft Mot= 36621lb•ft
Moment
(18•ft)2
Resisting Mr:= 0.6•(10•psf•12.ft+ 10 psf•9•ft)• 2 + 0.61200 Ib-18-ft
Moment
Ma- Mr Mr = 333721b•ft
Holdown = 180.5Ib
Force 18ft
II
GREEN MOUNTVIIN PROJECT: Riverside - 2885
structural engineering DATE: 12/4/2017 BY: CM
JOB NO: 17485 SHEET: L-15
LATERAL
WIND ON PORCH ROOF
126 MPH,EXP B w:= 6•ft•(4.43•psf+ 8.86.psf) w= 79.7 pit
D
II II
w II II
II
II T C II
—u
l .— ._____ ■1 _--_._111 / I
DESIGN ROOF TO CANTILEVER FROM HOUSE L := 10•ft D 11-ft
wL
M:= 2 M= 3987lbft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= — C= 398.7 Ib 12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w•L Nail top and bottom chord of first truss to wall with
v:= p v= 72.49 plf (2)16d nails at 16"o.c.(web to studs)
11