Loading...
Permit (5) ,• CITY OF TIGARD BUILDING PERMIT I '` COMMUNITY DEVELOPMENT Permit#: BUP2019-00352 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/14/2020 TIC-A Ex.L3 g Parcel: 1S1260000300 Jurisdiction: Site address: 9348 SW WASHINGTON SQUARE RD W14A Project: Indochino Subdivision: None Lot: None Project Description: Converting one tenant space into two. The address of the new space will be 9344,Suite W14B. Demolishing and rebuilding storefront and constructing new dressing room for TI. Contractor: WESTERN CONSTRUCTION SERVICES INC Owner: PPR WASHINGTON SQUARE LLC 2300 E 3RD LOOP SUITE 110 PO BOX 847 VANCOUVER,WA 98661 CARLSBAD, CA 92018 PHONE: 360-699-5317 PHONE: 360-953-8517 FAX: 360-694-7818 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/14/2020 $1,407.95 Demolition Occupancy Grp: B Occupancy Load: 35 12%State Surcharge-Building 01/14/2020 $168.95 Dwelling Units: 0 Plan Review 12/31/2019 $915.17 Stories: 0 Height: 0 ft Address Fee-per lot/suite(up to first 20) 12/31/2019 $50.00 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 01/14/2020 $406.00 Value: $150,000 Plan Review-Fire Life Safety 01/14/2020 $563.18 Info Process/Archiving-Lg$2.00(over 01/14/2020 $20.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 01/14/2020 $9.00 11x17) Total Area: 0 Metro CET 01/14/2020 $180.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $3,720.25 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the r"es adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 9522/090. You may obt a copy the ''-s or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. e. Issued By: r" / /rfr Permittee Signature: �j // / t 1 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application _ . Commercial RECEN FOR OFFICE USE ONLY City of Tigard DEC 312019 ReceivedDate/By: 2/3 l !? '' ;', /2 c _ " 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review TIGA y: J�I Related Permit: Phone: 503-718-2439 Fax: 503-598-1960 cm(OF R lbate/B �' T �O / _ T I G A RD Inspection Line: 503-639-4175 C' DI I SI Mate Ready/By: ` ® See Page 2 for a Internet: www.tigard-or.gov BUILDING Notified/Method:��� l �� Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. EI1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 9348 SW Washington Square Rd New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carportarea: square feet Suite/bldg./apt.#: W14 Project name: Indochino Landlord Improvement Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Buildup new demising wall dividing one tenant space into two. Existing storefront will be Valuation: $150,000 demo'd, new storefront constructed.Sales floor flooring removed,new tile installed.New Existing building area:4,572 square feet ADA compliant dressing room will be constructed. New lighting installed.Minimal mechanical 1,117 Empty Sp to adjust any grilles and to separate the two new spaces. Existing RR to remain, no change New building area: 3.455 Indochinequare feet ® PROPERTY OWNER 0 TENANT Number of stories: 1 Name: Macerich-Charlene Sirokman Type of construction: II-B Address: 11411 N.Tatum Blvd. Occupancy groups: City/State/ZIP: Phoenix,AZ 85028 Existing: M Phone:( ) Fax:( ) New: M-No Change M APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Western Construction Services Structural plan review fee(or deposit): Contact name: Pam Deegan FLS plan review fee(if applicable): Address: 2300 E.3rd Loop,Ste. 110 City/State/ZIP: Vancouver,WA 98661 Total fees due upon application: Phone:(360 )953.8517 Fax::(360 ) 694.7818 Amount received: E-mail: pam@westernconstruction.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Western Construction Services Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 2300 E.3rd Loop, Ste. 110 Solar Installation Specialty Code checklist. City/State/ZIP: Vancouver,WA 98661 Permit fee(includes plan review $180.00 and administrative fees): Phone:(360 ) 953.8517 I /L -/2_,,iFax:(360 ) 694.7818 State surcharge(12%of permit fee): $21.60 CCB Lic.: 63717 Total fee due upon application: $201.60 Authorized signature: ILL, J �n This permit application expires if a permit is not obtained yl/ ¢�'� �� within 180 days after it has been accepted as complete. Print name: Pamela A. Deegan " Date:12.26 19 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PemritApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ASAccessibility: Barrier Removal Improvement Plan • Commercial & Multi-Family -Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard,Oregon 97223 • 503.718.2439• www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering. [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line[2] of Valuation Computation): $ I:\Building\Pemuts\BUP_COM_PemutApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439• www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name 0 phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix"for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COM PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 q Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 •503.718.2439 • www.tigard-or.gov Type of Submittal #of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval,the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP COM PermitApp.doc Rev.03/05/2019 City of Tigard 71 4 COMMUNITY DEVELOPMENT DEPARTMENT Ill T I G A R D Building Permit Review — Commercial - No Land U s e Building Permit #: -6U/✓02 ,.� Site Address: q b4e SVJAShhliov'1 k)Gt� Suite/Bldg#: v ) `4--A Project Name: l n.d oCk\ r\u `J (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T. t. 1 hew reml1 - v-)An-t- a(wd tp!i - -Kivrf-Space /vl4 2 fpc r Existing Business Activity: 12.-eti I Proposed Business Activity: t P;-f(U Il Verify site address/suite# exists and active in permit system.WACA►n+Spate 'IS'•c;i 344 Sw WA Vv X413 .a River Terrace Neighborhood: ❑ Yes lifL No Zoning: MU.C Permitted Use: Z Yes ❑ No 0 Spec Space Confirm no land use required. 1 Business License: Exists: 0. Yes 0 No,applicant was provided a business license application Notes: Approved by Planning: 02A--. Date: 12131 I )9 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: / /i� /. Site Plans: # 4 Building Plans: # Building Permit#: nter building permit#above. Workflow Routing: lanning Permit Coordinator uilding Workflow Sign off: ign-off for Planning(include notes from •lanning review) Route Application Documents: "Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: / / By Permit Technician: AC` / � '� Date: .2,..Z.4/4 L:\Building\Fonns\BldgPennitRvw_COMNoLandUse_1118 1 9.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: 2 SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes I,d'N/A Tigard Trans SDC: ❑ Yes 1fr/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: i(h ( Date: i/Lai9,0 I:\Building\Forms\B1dgPermitRvw COM NoLandUse 111819.docx