Loading...
Specifications 14 o stJ Bewoic ct. M812ofq_op2 ( RECEIVED GREEN MOUNTIAIN JUN 132019 structural engineering CITY OFTIGARD BUILDING DIVISION STRUCTURAL CALCULATIONS Plan 2626 Elderberry Ridge, Lot 6 Tigard, Oregon Contractor: Riverside Homes w 49 78PE rt r , OREGON ,q e lfv. 12, �qq P ovA MU EXPIRES VZ• 31 Project Number: 17486 May 20, 2019 Index Structural Information Lateral Analysis L-1 thru L-15 greenmountainse.com- info@greenmountainse.com-4857 NW Lake Rd.,Suite 260.Camas.WA 98607 GREEN MOUNTVIIN structural engineering STRUCTURAL DESIGN INFORMATION GOVERNING CODE: 2015 International Residential Code(IRC) 2015 International Building Code(IBC) This engineering pertains to the design of the Lateral Force Resisting System and a review of the home designer's framing and foundation plans. The home designer is responsible for making any necessary changes as required by these calculations to their framing and foundation plans. 1. Dead Load: A. Roof 15 psf B. Floor ..10 psf C. Exterior walls 10 psf D. Exterior walls with veneer 50 psf E. Interior walls with gypboard each side 5 psf 2. Live load: A. Floor 40 psf B. Decks&Balconies 60 psf 3. Snow load: A. Uniformly distributed snow load on roof 25 psf 4. Wind load—based on ASCE 7-10 CH 27 MWFRS Directional Procedure: A. 3 Second Gust Wind Speed V=126 mph B. Exposure B C. Importance factor I=1.0 D. Topographical Factor Kzt=1.0 E. Wind Directional Factor Kd=0.85 F. Structure classified as enclosed 5. Seismic load—based on ASCE 7-10 Section 12.14: A. Mapped Spectral Acceleration for short periods Ss=1.0 B. Mapped Spectral Acceleration for 1 second period S1=0.34 C. Soil Site Class D D. Ductility coefficient R=6.5 E. Seismic Design Category D 6. Foundation Soil Properties: A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5 B. Maximum vertical bearing pressure 1500 psf 7. Retaining wall lateral loads: A. Walls free to displace laterally at top 40 pcf B. Walls restrained against lateral displacement at top 45 pcf 8. Concrete: A. 28 day design strength F'c 3000 psi B. Reinforcing bars ASTM A615,Grade 60 greenmountainse.com-info®greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607 GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 4111V structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-1 LATE RAL SEISMIC DESIGN BASED ON ASCE-7-10 1617.5 Simplified analysis procedure for seismic design of buildings SEISMIC BASE SHEAR U (EQ.12.14-11 with F=12) mapped spectral acceleration for SS := 1.00 short periods(Sec.11.4.1) from USGS web site mapped spectral acceleration for S := 0.34 1 second period(Sec.11.4.1) Fa Site coefficient(Table 11.4-1) Fa 1.1 Based on Soil F, Site coefficient(Table 11.4-2) F := 1.8 Site Class D SMs Fa•S5 SMS= 1.1 (Eq.11.4-1) 5M1:= F„•S1 SMi= 0.61 (Eq.11.4-2) 11.4.43 Design spectrum response acceleration parameters 2 SDs 3•SMs SDs = 0.73 > 0.50g SEISMIC 2 CATEGORY SDi:= 3•SMi SDI= 0.41 > 0.20g D per Table 11.6-1 WOOD SHEAR PANELS 1.2 SDs R:= 6.5 Table 9.52.2 V:_ •W 1.2.0.73 V:= •W V:= 0.135•W 6.5 12.4 Seismic Load Combinations E:= 1.3•V (Eq 12.4-3 with redundancy factor=13 per 12.3.42) WSD:= 0.7•E 0.71.30.135.W 0.123•W WOOD SHEAR PANELS II GREEN MOUNThIN PROJECT: Riverside - Plan 2626 11110 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-2 LATERAL SIMPLIFIED WIND AND SEISMIC COMPARISON WIND 11 - Y.4 psf psf --, Wind Base Shear Length L:= 50•ft Height Ht:= 24•ft WIND:= L•Ht•(11•psf+ 7.4•psf) SEISMIC WIND= 2208016 Fr Wroaf F2 - — Wfloor Seismic Wwal I Base Shear Aroof:= 50•ft•46•ft Aroof= 2300 ft2 Afloor 42•ft•34•ft Afloor= 1428ft2 Wwaiis 4.50•ft•20 ft Wwalls =4000ft2 SEISMIC:= (Aroof 15 psf + P+floor 15 psf + Wwalls°10•psf)•0.123 SEISMIC= 11798.1616 WIND GOVERNS DESIGN GREEN MOUNTS IN PROJECT: Riverside - Plan 2626 tie structural engineering DATE: Dec. 2017 BY: CM Joe NO: 17486 SHEET: L-3 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE VELOCITY PRESSURE qz:= .00256•Kz•KZt Kd•V`•I (Eq.6-15) EXPOSURE WIND SPEED(3 second gust) Vas:= 126 mph IMPORTANCE FACTOR I:= 1.0 TOPOGRAPHICAL FACTOR Kzt:= 1.0 WIND DIRECTIONAL FACTOR Kd:= 0.85 (Table 6-4) EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:_ .00256•KZ•KZt•Kd•V3s2•I qZ=19.69 (varies/height) 15' 20' KZ:= 0.62 qz:= .00256•KZ•KZt•Kd•V3,2•I qZ= 21.42 20'-25' KZ:= 0.66 qz:= .00256•KZ•KZt•Kd•V3s2.1 qz= 22.8 25' 30' KZ:= 0.70 qz:= .00256•KZ•KZt•Kd•V3s2•I qz= 24.18 II GREEN MOUMTnIN PROJECT: Riverside - Plan 2626 10111, structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-4 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. WIND PRESSURE P:= qZ•G•CP G:= 0.85 Gust factor C, pressure coefficient AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1 0'-15' WINDWARD PW:= 12.4•psf•0.85.0.8 PW= 8.43 psf LEEWARD PL:= 12.4.psf.0.85-0.5 PL= 5.27 psf 15-20' WINDWARD PW:= 13.49.psf•0.85.0.8 PW= 9.17 psf LEEWARD PL:= 13.49•psf•0.85.0.5 PL = 5.73 psf 20'-25' WINDWARD P�,. 14.36.psf•0.85.0.8 PW= 9.76 psf LEEWARD PL := 14.36•psf•0.85.0.5 PL = 6.1 psf AT ROOF 0'-15' WINDWARD PW:= 12.4•psf•0.85.0.3 P„,= 3.16 psf LEEWARD PL := 12.4.psf•0.85.0.6 PL = 6.32 psf 15-20' WINDWARD PW:= 13.49•psf•0.85.0.3 PW= 3.44 psf LEEWARD PL := 13.49•psf•0.85.0.6 PL = 6.88psf 20'-25' WINDWARD PW:= 14.36.psf•0.85.0.3 PW= 3.66 psf LEEWARD Pi := 14.36.psf•0.85.0.6 PL = 7.32 psf 25-30' WINDWARD PW:= 15.23•psf•0.85 0.3 PW= 3.88 psf LEEWARD PL := 15.23.psf•0.85.0.6 PL = 7.77 psf GREEN MOUNThIIN PROJECT: Riverside - Plan 2626 *kV structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-5 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. Assume 668 cp-o. psf psf ; .hh cp--0.6 8.5 ft 9.1r I psf 6.1 psf 9fz Mean Roof Height 18+ 25 = 21.5 2 Loads at Roof roof- max roof ave Windward 3.44-psf•8.5•ft= 29.24 plf 3.44•psf•5ft= 17.2plf Leeward 6.88.psf•8.5•ft= 58.48 plf 6.88 psf•5•ft= 34.4 plf Wall loads at upper level at main level Windward 8.43psf•4•ft= 33.72pIf 8.43•psf.8.5oft= 71.66pIf Leeward 5.73•psf•4•ft= 22.92 plf 5.73•psf•8.5•ft= 48.71 plf II GREEN MOUNTVIIN PROJECT: Riverside - Plan 2626 *kW structural engineering DATE: Dec . 2017 BY: CM JOB HO: 17486 SHEET: L-6 LATERAL jhrltari V042.> R r Tiii ODf Woe) ii ii ii ii II II 1 IC'd II II ei Al vitt Vor, II II 1:0rIri____371 r114_ ❑II II • ❑ 1:r tilll : 9:11: ..4. o I I ® ❑ to \ CA r ...... I I I I 11 1/ ❑❑ ❑ E Ae al 1 MA 'lir !4 r • ILS UI ` ❑ ea / iteoVe 1II (I ,... tom^ . &Tit. A GREEN M O U N TSI I N PROJECT: Riverside - Plan 2626 14110P structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-7 LATERAL 14cW,z 1t it- csvo !Pt II II ill .10.2 ii 10 I ", �,' e • II 71 r IV aII � 1111 1p . 4 = 1 1 ^^eM 1 l IM hi =.1 1 1 PI IN LOFT 1...1 MM 10 BO 10is imosoom III w , Ii si 1 u u 7.t3c 1 1i. 1 L_J tPARTIAL ELEVATION MR'8 a c• r t ft% t t 13/45r t Re A GREEN M O O N TSI I N PROJECT: Riverside - Plan 2626 11110 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-8 LATERAL 'whirs t-okr: pi LF CMS tifAtp, › --ia30e ,--, Duo ,„„„„„„...„„„„,, voirbi6 :-ii, II - 11 NGGK GREAT ,. I. A :' I ` 1 1 1. Ng IIn rr r ' c� i I ll 8 I V I I I WRING1 O Mau II .5.3M L I _,I Z-IqW I N t 1, j GARAGE D— ._-- la Ir ,.. . t .''' 1 mil IPwriTh- 1,1" L L .42,44 14. ti lel°r„.. - i flit`- 1iiS` PI GREEN MOUNThIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-9 LATERAL SHEAR WALL DESIGN Pd Pd 4 Wdl I h L R=Holdown Force Based on IBC Basic Load Combinations y,,; (Equation 16-11) 0.6•D+ 0.7•E (Equation 16-12) Overturning Moment: Mot:= P•h (L2 Resisting Moment: Mr:= 0.6•(Wdi + WWaii�• 2 + 0.6•Pd1•L Mot- Mr Holdown Force R L GREEN M O U N TM I N PROJECT: Riverside - Plan 2626 ItlY structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-10 LATE RAL Left Elevation Exterior Walls Second Level . Wind Force P:= 1700•lb P= 1700 lb Length of wall L:= 3.5•ft+ 6•ft+ 11•ft L= 20.5ft P Shear v:= — v= 82.93pIf A L 3.5 Overturning Mat:= P•8•ft Mot= 2321.95lb•ft Moment 20.5 (3.5•ft)2 Resisting Mr:= O.6•(15•psf•17•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft Moment Mr = 2491.13 lb•ft Mot- Mr Holdown = -48.34 lb Force 3.5•ft Main Level Wind Force P:= 4400•Ib F'= 4400 lb Length of wall L:= 4•ft+4•ft+ 6•ft+ 13•ft L= 27ft P Shear v:= — v= 162.96 plf S 4 Overturning Mot:= P•9 ft — Mot= 5866.67lb.ft Moment 27 (4•ft)2 Resisting Mr := 0.6.(15•psf17 ft + 10-psf•17•ft)• 2 + 0.6.800•Ib4•ft Moment Mr= 3960 lb ft Mot - K Holdown = 476.67 lb Oft Force II GREEN MOUNTIVIN PROJECT: Riverside - Plan 2626 %kV structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-1 LATERAL Front Elevation Exterior Walls Second Level-ElevA Gov design Wind Force P:= 2859-lb P= 28591b Length of wall L:= 5•ft•2+ 3.5-ft-2 L= 17ft P Shear v:= — v= 168.18plf B 35 Overturning Mot:= P 8 ft — Mot= 4708.94Ib•ft Moment 17 (3.5•ft)2 Resisting Mr:= 0.6.(15•psf.4.ft+ 10.psf•8 ft). 2 + 0.6,600-lb-3.5-ft Moment Mr = 1774.5lb•ft Mot- Mr Holdown - 838.41 lb Force 3.5ft Main Level -not considering the 3rd car garage Wind Force P:= 3680•lb P= 36801b Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25-ft L= 6.75ft 2.25.3.5= 7.88 P Shear Wind v:= — v= 545.19plf E 2.25 Overturning Mot:= P•7.88°ftMot= 9666.131b•ft Moment 6.75 (2.25•ft)2 Resisting Mr:= 0.6•(15psf•4-ft + 10 psf'8-ft) 2 + 0.6.800-lb•2.25•ft Moment Mot- Mr Mr=1292.631b•ft Holdown = 3721.56lb Force 2.25-ft HTT5 II GREEN MOUNTIVIN PROJECT: Riverside - Plan 2626 lith" structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-12 LATERAL Right Elevation Exterior Walls Second Level Wind Force P:= 1700•Ib P= 17001b Length of wall L:= 3•ft+ 6•ft+ 10•ft L = 19ft P Shear v:= - v= 89.47 plf A 6 Overturning Mot:= P•8•ft•— Mot= 4294.74lb•ft Moment 19 (6•ft)2 Resisting Mr:= 0.6.(15•psf•17 ft+ 10•psf•8•ft)• 2 + 0.6.600-1b-6-ft Moment Mr = 5778lb-ft Mot- Mr Holdown = -247.21 lb Force 6•ft Main Level Wind Force P:= 4400•lb P= 4400 lb Length of wall L:= 15•ft+ 7•ft+ 4•ft L= 26ft P Shear - v= 169.23 plf B 4 Overturning Mot:= P•9•ft•26 Mot= 6092.311b•ft Moment (7•ft)2 Resisting Mr:= 0.6 (15psf17ft+ 10psf17ft)• 2 + 0.6800•Ib4ft Moment Mr = 8167.5lb•ft Mot- Mr Holdown = -518.8 lb Oft Force II GREEN MOUNThIN PROJECT: Riverside - Plan 2626 iihr structural engineering DATE: Dec. 2017 By: cm JOB NO: 17486 SHEET: L-13 LATE RAL Rear Elevation Exterior Walls Second Level Wind Force P:= 3043•Ib P= 30431b Length of wall L:= 8•ft+ 7•ft L=15ft P Shear v:= - v= 202.87 plf S 7 Overturning M°t:= P•8•ft•— Mot= 11360.53 lb ft Moment 15 (7.ft)` Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf-12.ft)• 2 + 0.6.600-Ib•7•ft Moment Mr = 4725 lb•ft Mot- Mr Holdown = 947.93 lb MS-1040Fome 7ft Main Level Wind Force P:= 4303•Ib P= 4306 lb Length of wall L:= 3•ft+4•ft+ 3.5.ft L== 10.5ft P Shear Wind v:_ - v= 409.81 plf D 3 Overturning M0 := P•9•ft•— Mot= 11064.86 lb•ft Moment 10.5 (3•ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.800.1b•3,ft Moment MOt- Mr M = 1818lb•ft Holdown = 3082.29 lb Force aft HTTS II GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM J0B NO: 17486 SHEET: L-14 LATE RAL Interior Shear Walls at Garage Main Level Wind Force P:= 3797 lb P= 3797 Ib Length of wall L:= 12•ft L=12ft P Shear Wind v:= — v= 316.42 p1f C Overturning Mot:= P•9•ft Mot= 34173Ib•ft Moment (124-02 Resisting Mr:= 0.6 (10•psf 12•ft+ 10•psf•9-ft) 2 + 0.61200.1612 ft Moment M Holdown of = 1371.75 lb Mr = 17712lb-ft Force 12'ft HITS II GREEN MOUNTnIN PROJECT: Riverside - Plan 2626 1110 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-15 LATERAL WIND ON PORCH ROOF 126 MPH,EXP 5 w:= 6•ft•(4.43•psf + 8.86•psf) w= 79.7 plf t D f n II w 11 M II L Itr c II ll V ■_ ___—__ In / I DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 12•ft i1 M= 3987Ibft r support beam on post in wall at house with M Simpson HUCQ-SDS C:= T:= C C= 398.716 12 SDS 1/4x21/4 screws(min)x172 lbs=2064 in combined withdraw w•L Nail top and bottom chord of first truss to wall with v:= p v= 66.45 plf (2)16d nails at 16"o.c. (web to studs) II