Loading...
Specifications 915q SW wilipsWeer FL MT200- 00%, HERMAN 3151 NE SANDY BLVD.,SUiTE 100 ENGINEERING PoRmu,OR 97232 INC fl PHONE (503) 230-8876 1 -1.1—FL SHERMANENG1NEERS,Com Structural Calculations RECEIVED August 26, 2019 SEP 5 2019 CITY OF TIGARD Moreland Plan feD PROfesj, BUILDING DIVISION Lot 4, Canyon Court c Tigard, OR T, A oRE Prepared For: QA SH Suntel Design, Inc. 16865 Boones Ferry Rd. EXPIRES: 6/30/ Lake Oswego, OR 97035 Subject Sheet No. Lateral: Loading LL1-LL3 Shearwalls LL4 Overturning LL5 • r I MORELAND PLAN I Lateral Load LL 1 7/24/19 1. Loading • - 2014 OS5C 1.I Wind:. Per ASCE 7-10 Basic Wind Speed= 120 Kzt = I.00 Exposure Category= B A = I.00 Building Height= 18.5 1 = I.00 Roof Slope= 4 :12 = 18.4' Zone Pressure A5D LC A5D Pressure A 30.7 0.6 = 18.4 B -8.7 0.6 = -5.2 Use 5 psf at roof for MWFRS C 20.5 0.6 = 12.3 D -4.9 0.6 = -2.9 Use 5 psf at roof for MWFRS •End Zone Distance; Eave lit(ft) 18.5 x 40% = 7.4 ft Bldg Width(ft) 28 x 10% = 2.8 ft Width x4%= I.I ft Bldg Length(ft) 40 x 10% = 4.0 ft Length-x4%= 1.6 ft Minimum= 2.8 ft Edge Strip= 3.0 ft (End Zone=2x Edge Strip) End Zone= 16.0 ft I 1.2 Seismic Per 2014 O55C Use Group= I . • Number of Stories= 2 <3 Simplified analysis per ASCE 7-10 Sds = 0.7 R= 6.5 V = 1.3 5d5 W = 0.140 W R Roof W= 15.0 1 100 = 16.5 Walls = 8 8.0 ft I/2 136 = 4.4 Partitions = 6 8.0 ft 1/2 58 = 2.1 /' 23.0 x 18 = 413 Floor W= 15 1008 = 15.1 Walls = 8 9.0 ft 1/2 128 + 4.4 = 9.0 Partitions = 6 9.0 ft 1/2 40 + 2.I = 3.2 10 27.3 x 10 = 273 50.2 686 X 0.140 7.0 = Base Shear Distribution: OW = 7.0 X 413 = 4.2 = 3.0 686 1.4 • Oro- = 7.0 X 273 = 2.8 = 2.0 686 1.4 LL-Moreland-Canyou Courtais SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd Suite 100 • Portland, OR 97232 WIND LOAD 2014 IBC/OSSC JOB: MORELAND PLAN Loading: SIDE/SIDE V1 V2 V3 V4 Roof Wall End Zone = 5 psf 18.4 psf Interior= 5 psf 12.3 psf End Zone y Interior ♦ End Zone • End Zone Length = 6 ft Roof Ht. 6 ft • Diaph 1 width 40 ft Wall Ht. 8 ft Qn Qn Qn Diaph 2 width 40 ft Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q ROOF width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 5 6 6 40 5 34 6 40 0.6 X Inter 5 6 0 40 5 0 6 40 5 34 0 40 5 6 0 40 0.0 2 End Right 5 34 6 40 5 6 6 40 0.6 Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load, trib trib total load trib trib total load trib trib total Q UPR FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 18.4 6 4 40 12.3 34 4 40 1.1 X Inter 18.4 6 0 40 12.3 34 0 40 12,3 34 0 40 18.4 6 0 40 0.0 2 End Right 12.3 34 4 40 18.4 6 4 40 1.1 TOTAL UPPER FLOOR LOAD LINE ROOF UPR FLR TOTAL 1 0.6 1.1 1.7 X 0.0 0.0 0.0 2 0.6 1.1 1.7 3.4 17-\---1 ik— • N SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd Suite 100 Portland, OR 97232 MAIN FLR Roof Wall End Zone= 5 psf 18.4 psf • Interior= 5 psf 12.3 psf Wall Ht. 9 ft Diaph 1 width 36 ft Diaph 2 width 36 ft Shear VI V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total 0 MAIN FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 18.4 6 9 36 12.3 30 9 36 2.3 X Inter 18.4 6 0 36 12.3 30 0 36 12.3 30 0 36 18.4 6 0 36 0.0 2 End Right 12.3 30 9 36 18.4 6 9 36 2.3 4.6 V, E,Ah1U 'Ft-M L� foo= 01,2 ; 1 • 0 C 1/d P LV-7 - titt9 if; 110&4-06?) I =Loo01 A'O0 ; 0 • ,L S'' 252s1 _ 2 = 4-lO S - - - �� ) A r OVERTURNING - FRONT BACK MORELAND PLAN LL 8/26/2019 GRID SMEAR DEAD DEAD DEAD LOAD LOAD NET LINE LEVEL LENGTH SHEAR/FT HEIGHT TRIG LOAD M,resist REDUCTION M,ot ABOVE UPLIFT LINE 2 V-2 3 0.179 8 4 15 0.56 WIND 4.3 0.00 I .32 Use MSTA36 V-1 2.5 0.755 6.25 7 15 0.48 WIND 11.8 0.00 4.60 Use HDUB LINE 2 V-2 3 0.158 8 4 15 0.56 SEISMIC 3.8 0.00 I . 1 5 Use MSTA36 V-1 2.5 0.472 6.25 7 15 0.48 SEISMIC 7.4 0.00 2.83 Use STHD 14 C0 T5 rS 0-8 ,15 OT-Moreland-Canyon Court.xls