Loading...
Report (3) Nat N A$R(E-LSr (tST20fq-003f1 PERMIT NO. C1eanWater Services Our is clear. LOT EROSION CONTROL INSPECTION REPORT DATE INSPECTOR t, �; cA SUBDIVISION OWNER/PERMITEEr 7 SITE ADDRESS c i APPROVED FINAL INSPECTION THIS SITE MEETS THE POST-CONSTRUCTION EROSION CONTROL REQUIREMENTS SET FORTH IN CLEAN WATER SERVICES RESOLUTION AND ORDER NOTE: IF POST-CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION, THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE OR PERMANENT GROUND COVER IS ESTABLISHED. A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL. OTHER THANK YOU FOR YOUR COOPERATION! INSPECTOR PHONE