Report (3) Nat N A$R(E-LSr (tST20fq-003f1
PERMIT NO.
C1eanWater Services
Our is clear. LOT
EROSION CONTROL INSPECTION REPORT
DATE INSPECTOR t, �; cA SUBDIVISION
OWNER/PERMITEEr 7
SITE ADDRESS c i
APPROVED
FINAL INSPECTION
THIS SITE MEETS THE POST-CONSTRUCTION
EROSION CONTROL REQUIREMENTS SET
FORTH IN CLEAN WATER SERVICES
RESOLUTION AND ORDER
NOTE: IF POST-CONSTRUCTION EROSION CONTROL MEASURES ARE STILL BEING
EMPLOYED ON THIS SITE TO MEET CRITERIA FOR AN APPROVED FINAL INSPECTION,
THE MEASURE(S) MUST REMAIN IN PLACE UNTIL LANDSCAPING IS COMPLETE
OR PERMANENT GROUND COVER IS ESTABLISHED.
A COPY OF THE FINAL EROSION CONTROL INSPECTION REPORT MUST BE
FORWARDED TO THE NEW OWNER, AT WHICH TIME NEW OWNER ASSUMES
THE RESPONSIBILITY FOR MAINTENANCE, REPAIR AND REMOVAL.
OTHER
THANK YOU FOR YOUR COOPERATION!
INSPECTOR PHONE