Loading...
Report M51 201°1- 009-16 1 q90`( Sw ec(t'o►r GT GREEN MOUNThIN structural engineering Memorandum October 3, 2019 To: Amilian Avgi, Riverside Homes From:Corina Muntean, P.E Re: Plan 2626 at Elderberry Lot 2, 3 and 11 It has been brought to my attention that the garage piers do not meet the 3.5:1 ratio noted on detail 11 on S2. I recommend that the garage piers be sheathed on both sides of the wall per shear wall type E. If you have any questions, don't hesitate to ask. wkt4 PRafiFs ‘4G �c' sin 4 49 78PE tr r. OREGON MV !EXPIRES IS• '51 •2.02.0 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd..Suite 260.Camas,WA 98607