Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2019-00438
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT ;111111COMMUNITY DEVELOPMENT Permit#: PF12019 00438 13125 SW Hall Blvd.,Ti Date Issued: 12/11/2019 T[G,1R.T� and OR 97223 503.718.2421 9 Parcel: SEG301 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: 300005-Oak Street Apartments Project Description: SEG301//9010 SW Oak street.To hang 7,764'of new 1/4"strand with a 144ct fiber optic cable. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric, data) PFI Permit Fee 12/11/2019 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: ROBERT VITRO 669 GLATT CIRCLE PHONE: 9712814231 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00438 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice mow 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard DEC 10 2019 PFI#: 19 Elle 1 al3g ~ ENGINEERING DEPARTMENT CITY OF TIGARD TIGARD Public Facilities Evn c1 ' went (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 300005 - Oak St. Apartments J �I TYPE 1—Franchise Utility Work Brief description of project: To hang 7,764' of new 1/4" strand performed by NWN,PGE, or utility agency with a 144ct fiber optic cable. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and '7 ;, main line to Location (address if available):9010 SW Oak St. ; L- 5 u P ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: Wave Broadband • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 669 Glatt Cir water service area City/State:Woodburn OR Zip: 97044 ❑ TYPE 4—Small Cell Technology Phone: N/A 0 TYPE 5-Tigard Triangle Email: N/A Phone: N/A NOTE: Type 1 and 2 applications may be emailed to rowpermits(li tigard-or.gov. Contact name: Robert Vitro Phone: 971-281-4231 Email: robert.vitroCa�wavebroadband.com CONTRACTOR INFORMATION 'E'Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Robert Vitro Mailing address: 18489 S. Ferguson Rd. City/State: Oregon City, OR Zip: 97045 Phone: 971-281-4231 Email: robert.vitro@wavebroadband.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ 15,000 (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as "Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. , ...,-: Robert Vitro 12/10/2019 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: f Pilo i -ooti N Permit fee: j t Received by: SC Date: 1 LI 0-1 q Approved by: 77-e-fr'/.6• Date: /2/1//201.5 Notified by: S C Date: I/.--I I-11 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name ❑ Site Address How many install sites are proposed as part of this permit application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way 0 Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities El Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 3 of 4 9 \Vy '• .c; 1 Edge of Pavement -"411--- Ditch 0 Streetlight/ tre111etlight —•—•—•—•—•—•,-r—•— ~• 1.1 r Rain Drain ;. .i . 0 1 I I It. I 1 , i4 fil 1 Existing House 1 e„r 1 Existing �I Q; 31 • Driveway CO 21 WI ! v-1 R. ,`ter A j of °�v 1 t e1 cc 6 i0 0 I Existing Shop j Powerpole I I = I a\ 1 0 • 0 �.r) ID- 95' I I .5------- l aper 'Line—-—-—-—-—- N 1 o 1 Fire Hydrant(FH) I I • Scale: 'I"=30' I I I I I I I TYPE 1 ANI) TV PE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility& street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 30025 - Oak St. Apartments astound 9010 SW Oak St. by wove WAVELIVIS,.HOLDINGS LLC sof KANDWA 98033 CE SUITE 500 KIRKUND WA 980J3 Tigard OR, 97223 0 == wifammimimminis maismomies General Location Scope of Work Beaverton y 41 Y N O' < S New Aerial 1-Place 7,769'of new 1/4"strand with a new 144ct fiber optic cable. c s,-0.1(‘ ,-Q r' Strand Only Footage-1,754' z `°PExisting Conduit- • _ New Anchors-14 z 0 4,4, New DG-15 •Y 10 Risers-1 9 ECM CONSTRUCTION COORDINATOR CoyN,....era Rt IUB JMCCONVILLE@WAVEBROADBAND.COM �' 503-318-9804 811US8,„. a PERMIT TECHNICIAN ROBERT VITRO 2 L•rke ROBERT,VI TRO@ WA VEBROADBAND.COM C 971-291-4231 AS Vicinity MaprPacket Descri•tion N ,1A " '- .,•.,ry i ._ ^t iii . i ' , '' Sheets t:.E. 4 r �' ��,.„ -� i i Title Page ,' a Y,` ',' 2.1 Route Design I I I I I t - i9C�.. •�., . r,. l . 0' 15' 30' • ,4 �-�* } 1 �� }u ,,i1',,,,,,,..: .cS SCALE r=3o Z. a• i 4 ' ` Atit is 00 . • c.-7::,'f.'. 30005:Oak St.Apartments M• • r } • �itc 7l41 -;„ ,rger0 .„g1.3,1. I TOWNSHIP IP,sws.a..Js awl 36 p TITLE PAGE 2 2 to F '" fi ' K ' c } Y.➢+t t.._ r'Gil4, � T(I .ka. .:1� '1�'- �, `� P307 DATE 11.,0/2019 SHEET 1.1 1OAa9e? astounc. ., by wane WAVEDIVISION HOLDINGS LLC ' 401 KIRKLAND PGE#5802 KIRKLAND.WA 90033 SUITE SOO HOA-26'4" N- r 12"FGA ON EAST SIDE. R ORIGINAL ISSUE Tp 1140,9 RV Construction Notes N Q e PGE#4562 HOA-26'11" ' Ci) STRAIGHT THROUGH O PGE#5953 MAKE READY N HOA-23'9" LOWER CL 25'11" END SLACK TAKE CL POSITION ANCHOR 15'SOUTH WITH A 3'OFFSET FROM EXISTING PGE ANCHOR v PGE#5956 °�9 HOA-24'6" N. 18"FGA DOWNWARD position 93' \po, QaoANCHOR 6'WestSS1LOWER CTL 23.09 TAKE OPEN POSITION AT 24.06 RETENTION PGE SECONDARY SOUTH 'TO PGE#1367 N HOA-26'4" 163'SlackPGE#1366 FIELDSIDE HOA-27'6" T-LEAD DEAD END SW STRAND ONLY NORTHEST TO PGE POLE 1366 TO ANCHOR NEW DG W/A 10'LEAD NE SLACK FOC NORTH TO PGE POLE 5953 ANCHOR 17'NE o PGE#1368 (t 0' S' 0' /5' 60' HOA-24'11" rSCALE 1.41S -- STRAIGHT THROUGH SOUTH SIDE 30005:Oak St.Apartments PGE#16 HOA-29'6" ",�, ,- PLACE DEAD END NE '77'77sawn"IWS.7'77'° NEW DG WITH A 10'LEAD SE 2`L� NEW ANCHOR 15'SE OF POLE PGE#1369 HOA-30'11" ROUTE DESIGN OVERLASH ATTACH TO EXISTING DE AND BUILD NEW STRAND/144CT FIBER NORTHEAST ON TOP �J POSITION. PLOT GATE. rvlDnms 1SHEEr.- 2.7 ,. astound ,,, ..„,, by wave .,,.... WAVEDIVISION HOLDINGS LSE 401 NIRKLANO PARKPUDE SUITE 500 KIRKUNO.WA 98033 Prct cRIGIrvnLIDP ERIP ION TA 92 o-I9 82 { ROV11 ` 5 Construction Notes j: r ; te, PGE#4510 OW HOA-25'1" STRAIGHT THROUGH ON EAST SIDE OF POLE PLACE CROSS CLAMP 1'NORTH OF POLE ON NORTHEAST SIDE OF POLE STRAND ONLY NORTH AND EAST TO ANCHOR LEADS SOUTH AND WEST TAKE FOC WEST FROM CROSS CLAMP PGE#5002 PGE#28 i HOA-24 10" HOA-26'1" 0 DEAD END WEST DEAD END SOUTH • NEW DG W/A 10'LEAD EAST NEW DG W/A 10'LEAD NORTH NEW ANCHOR 16'EAST NEW ANCHOR 16'NORTH , N N PGE#4509 Q PGE#4511 PGE#5181 y HOA-25'10" y HOA-25'2" > STRAIGHT THROUGH NORTH HOA-26 1" Q SIDE r SIDE IGHT THROUGH NORTH STRAIGHT THROUGH NORTH L ` _ SIDE �, IIS, 3I, 5' 60, SCALE 1,IS m 30005:Oak St.Apartments 2 / b Page rs 0 .. 64' / 6/// TD,NSI«PIS ,WS",.55,,055 J SW Pine St. ROUTE DESIGN 249' 4.11450' 189' 248' .6.- 171' 171' To Page 2.1 P10TDATE 100/219 SHE'. 2.2 OAa9e astound 2y by wave WAVE:111510N HOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND.WA 96033 REV DESCRIPTION OATF BY ORIGINAL ISSUE Ii1,19 RV M Construction Notes PGE#4643 HOA-242" STRAIGHT THROUGH ATTACH EAST SIDE in 0) PGE#4642 HOA-2211" STRAIGHT THROUGH ATTACH eZ� EAST SIDE QaO� -(O PGE#12242 HOA-24'0" SW Pine St. STRAIGHT THROUGH ATTACH EAST SIDE PGE#5961 HOA-22'6" DEAD END EAST dp PGE#4509 ANCHOR 13'WEST CO PLACE XCLAMP 8'EAST OF POLE N STRAND ONLY SOUTH FROM XCLAMP TO ANCHOR TAKE FOC NORTH FROM XCLAMP PGE#4641 HOA-24'10" STRAIGHT THROUGH 0' S' 0' 45' 70 SL BONDED j SCALE:1,15' e N 30005:Oak St.Apartments PGE#4640 y CI,Trqsrel HOA-24'2" IW«�T5 APO 3e WNs1xP rs Rev, DEAD END NORTH NEW DG W/A 10'LEAD SOUTH NEW ANCHOR 16'SOUTH A ROUTE DESIGN PLOT DATE SHEET 111012019 2.3 To Page 2.5 astound by wave W VEDNISION HOLDINGS LLC 461 KIRKLAND PARKPLADE SUITE 560 KIRKLAND,WA 98033 IRFV PTKM A ORIGINAL ISSUE DATE111,19 RV 5 (§� Construction Notes HOA#4644 HOA-25'0" -STRAIGHT THROUGH EAST SIDE -SL IS BONDED O M CV� N SW Oak St. d I I I I I PGE#4616 Q HOA-23'3" SCALE N/A -18"FGA EAST SIDE Cs130005:Oak St.Apartments -SL IS BONDED r � To Page 2.3r 49%55,59b TDA„SH,P'SRA,.,VSAWA,35Me36 ROUTE DESIGN PGE#4643 RIOT DATE. SWF! 11/16/2010 2.4 etiastound by wave WAVEDMSION HOLDINGS LLC 101 KNIRKLAND PARKPLACE SUITE 500 19, DESCRIPTION GASP RV ., ORIGINAL ISSUE 1,1049 RV HORING KIRKLAND,WA 98033 PGE#4618 Construction Notes HOA-21'10" -DEAD END SOUTH -ANCHOR 17'NORTH -NEW DG W/A 10'LEAD NORTH PGE#3997 HOA-22'6" -Deadend West Side with -DG East to new Wave anchor 16' I PGE#3998 HOA-20'0" -36"FGA ON NORTH SIDE OF POLE 6 CROSS CLAMP FOR ANC-PLACE CROSS CLAMP 3'NORTH EAST OF POLE -TAKE STRAND ONLY NORTH AND EAST FROM e Qa -TAKE FOC FROM CROSS CLAMP/FGA WEST ,so i JJ SW Mapleleaf St. _ \ a 189' 138' 158' 014115' N \ I PGE#4000 HOA-23'0" 0' ' -STRAIGHT THROUGH NORTH SIDE SCALE:NSA Mai 30005:Oak St.Apartments PGE#4680 PGE#3999 Q HOA-21'7" -o HOTRAIGHT THROUGH NORTH SIDE STRAIGHT THROUGH NORTH SIDE csir•-• CIDI Spero IS9No" COM O,N.Iw Swan 3$*SF N ROUTE DESIGN - To Page 2.5 PLOT DATE SHEET - 11/10/2019 2.5 by wave VISION HOLDINGS LLC 40?KIR 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND.WA 99033 REV OESCRMTpN ORIGINAL ISSUE 11 10.18 RV 5 Construction Notes PGE#4678 HOA-21'1" 'AR-Power needs to raise a minimum of 12 inches and tape and shape the drip loops. -The secondary midspan heading east is at the same height as the current comms midspan. -Please raise and or have power set a new guy CL pole PGE#5985 wire to raise the secondary. HOA-22'8" -The pole itself has at least 10 feet above them of et,' / STRAIGHT THROUGH NORTH SIDE empty pole space Attach to the north side of the pole. ,..o "S° SW Mapleleaf St. 132' _ 129' _w,_ 181' c 197' :• 154'1 / ai Q PGE#4680 N L in r I I I I I PGE#5986 SCALES WA HOA-18'11" -STRAIGHT THROUGH NORTH SIDE 30005:Oak St.Apartments PGE#4679 HOA-22'8" -Pole transfer in progress,century link has CITY 0/REP S �:ntransfered but COUNTY o ,W 35 end 36 -Comcast still needs to transfer over for at least 3 years ago. -Attach to the north side of the pole. ROUTE DESIGN PLOTDATE: I SNEFT. 11/10/2019 2.6 astound by wave WAVEDIVISION MOLDINGS LLC 401 KIRKLAND PARKPLACE SUITE 500 KIRKLAND,WA 98033 °RUIN.ISSUE 1-10-10 RV Construction Notes PGE#377t... m HOA-22'3" co Q -STRAIGHT THROUGH NORTH SIDE L 0 0 rn CO m a o cn I— • J SW Mapleleaf St. 168' 202' 136' 148' � N 0 Co (D N • O) • • SCALE N/A PGE#3984 PGE#4555 30005:Oak St.Apartments HOA-21'11" HOA-21'5" -STRAIGHT THROUGH NORTH SIDE -STRAIGHT THROUGH NORTH SIDE • • • COUNTY PGE#4501 PGE#6601 ro,.n:Ioo,sRr„�.-1WURINE IS sol HOA-23'6" HOA-23'9" -STRAIGHT THROUGH NORTH SIDE -STRAIGHT THROUGH NORTH SIDE ROUTE DESIGN PLOT DATE- a 15,5°,2019 2.7 N- CV a) ii by wave WAVEDIVISION HOLDINGS LLC 0 401 KIRKLAND PARKPLACE SUITE S. F KIRKLAND,WA 98053 RFV rSCRmrroN t_JHOILDLSIIOSI:onszctton SW Mapleleaf St.105' 245' 165' 117 Notes PGE#3983 HOA-22'1" -STRAIGHT THROUGH NORTH SIDE in t0 a-- PGE#3982 PGE#3990 HOA-22'11"- 23'05" HOA-23'8" -Attach to the east side of the pole and -STRAIGHT THROUGH NORTH SIDE the south side of the pole. -Double dead end and set a new anchor 10 ft north and 10ft west. PGE#4647 HOA-2T 5" -STRAIGHT THROUGH NORTH SIDE PGE#6230 HOA-23'9" STRAIGHT THROUGH EAST SIDE O LO NPGE#382 N ai HOA-24'2"-24'8' > -MR-Power service drop and secondary are delashed and v hanging please request power to tape and shape and re-attach rn c back up to the quv wire and pole,raise a minimum of 10 N N co inches. h. a -Double dead end place and anchor 17 ft south and 10 ft east. c i oN -Attach north and west. m I— a O SCALE:N/A • F / ` :::::ments ntsSW Oak St. 205' ROUTE DESIGN PLOT DATE I SHEET 11/10/20192.8 astounc by wave WAVCN HOLDINGS LLL 101 KIRCLANRKLAND PARKPLACE SUITE SW KIRKIAND.WA 98033 ORIGINAL ISSUE I I-10-19 RV Construction Notes PGE#39183 HOA-25'7" / -Set a new anchor west 15 ft add a new riser on wave bracket. -Attach on the east side of pole. PGE#385 HOA-23'10" -MR Request to lower ELI 4 inches. -Attach to the north side of the pole. co N N N 03 RS f0 o_ a 0 H \ H SW Oak St. 110' 215' 225' I I I I I t PGE#384 SCALE.10 HOA-24'4" co -MR Request power to bond street 30005:Oak St.Apartments -Attach to the north side of the pole. (I) CITY TWOcOur..W„n.W MM.,IS.",1W Amnon 3s..3e PGE#383 HOA-2T 10" -MR Bond street light mast. ROUTE DESIGN -Attach to the north side of the pole. PLOT DATE- WET.' 11,10,0,9 2.9 astound. by wave WAVEDIVISION HOLDINGS LLC 901 KIRKLAND PARKPLACE SUITE 500 KIRKLAND.WA 98033 RFV DESCRIPTION DATE Sv 3 oRDINAu55uE 11-10-19 RV 5 Construction Notes 0 Riser down into existing UG 0 Existing Vaufl to t > to Cn N © co O o_276' co N SW Oak St. N lU 200 rte. 6201 h I I I I I SCALE:WA m 30005:Oak St.Apartments $ x ro�SHr:55 Rwp.'IW Adbn.A5 T4 M ROUTE DESIGN Pt 02 DATE 2"339 1111012019o201O 2 ID astound by wave WAVEDMSI DN MOLDINGS LLC 401 NIRKLAND PARNPLACE SUITE 500 KIRKLAND.WA D8033 RFV DESCRIPTION DATE BY 0 ORIGINAL ISSUE I 1-1,19 RV • Construction Notes 1O Existing Vault 4° 120' 620'to vault SW Oak St. N • t i 9010 SW Oak St. Oak St.Apartments. I I I I I 170' SCALE NIA I I 30005:Oak St.Apartments CI,TM ion ROUTE DESIGN PLOT DATE SH(,. ,,,azole 2.71