Loading...
PFI2019-00437 ,., CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT _ COMMUNITY DEVELOPMENT Permit#: PF12019-00437 T[G A R.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/11/2019 Parcel: SEG413 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2728386 Project Description: SEG413//7303 SW Spruce Street. OH to UG conversion wire pulling thru conduit. Class of Work: FEES Type 1 -Utilities(gas, electric,data) Description Date Amount Owner: Total REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.ticiard-or.qov to schedule inspections online. Contractor: PHONE: Applicant: LINDA OTT 10800 SW AVERY STREET PHONE: 5036126093 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: J kC APP U1. CA116 , n� (..012f^— Issued By: ,. Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00437 Type: Condition Name: Status: Severity: PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. RECEIVED City of Tigard DEC 10 2019 PFI#: ��� �`���`���" " "1 = ENGINEERING DEPARTMENT CIT" (-)., 1'.^,�,,,,,r- TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION PGE Job # M2728386 TYPE OF WORK Project name: 8 TYPE 1-Franchise Utility Work Brief description of project: performed by NWN,PG , or utility agency OH TO UG CONVERSION PULLING WIRE THRU CONDUIT 0 TYPE 2-ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and c I main line tap l Location (address if available): SCS ❑ TYPE 3-Full Scale Development Work 7303 SW SPRUCE ST performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE LINDA OTT • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 10800 SW Avery Street water service area City/state: Tualatin, OR Zip. 97062 0 TYPE 4-Small Cell Technology Phone: 503.612.6093 0 TYPE 5-Tigard Triangle Email: preregcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: JOSE MARQUEZ emailed to rowpermits@tigard-or.gov. Phone: 503.672.5452 Email: PREREQCOORD@PGN.COM CONTRACTOR INFORMATION 0 Same as applicant Name: Pacific Excavation CCB Number: 135018 Mailing address: 79 N Danebo Ave city/state: Eugene, OR Zip: 970402 Phone: 503-747-8445 Email: Bill@pacificexc.com ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Z z Ott- LINDA OTT FOR JOSE MARQUEZ 12.10.19 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: 191 /./.01q--001 34- Permit fee: S -' Received by: Date: 11-4,01q Approved by: %,n f£ • Date: ti-hl2419Notified by: cC. Date: 11-1 1-1 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4 9 SW- " -\ sI y Edge of Pavement l Streetlight 1 Ditch "'—ill' • 03.2' T"-'proposrd-Tewl-CFMr F-- 1 I I 1 `-■ I as "I 1 ' I • >" , • Existing House I dli I Existing �r • Driveway m131 01 ; ,^ L 1 a - I En. 2cI 1 I r 1 of • • cI ca` I m i� J1 I a 1 of ;: n g Sho � Powerpole i 1 a 1 I I o _.a.n . I 1--------groper ' ------I--- i • 0 • F� Hydrant(FH) I I • Scale: 'I"=30' I I I I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCII REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 pL464, SUBDIVISION LEGEND / INSTALL: ® ;00....,zorrAav BTX FOR NEW PGE FACILITIES TO BE INSTALLED A 0 25KVA CONDUIT x STREET LIGHT C 4/UAL-Tx 1-142 C/O F6T + (UNLESS OTHERWISE SPECIFIED) 7200V,120240 ,1 0,3W3.649FLKR 3,815A AFC M REMOVE FACILITIES INSTALL FACILITIES 25L • 8' a 'Al" 18,777# •� INSTALL ADDITIONAL FACILITIES • /MODIFY FACILITIES n,n G20 PRI 9.279# 7210�` 18640 NEUT 9,531# 7s`` 2NKVA INSTALL 4"POLE CONDUIT UNIT 6d4PGE D&INSTAL VAULT,CUST64332P-2125�GE TOP WITH 12"BRACKETS,3.142 C/O F65T j�`� �� PL-134 PROVIDED 81NSTALLED BY CUSTOMER B LIGHTNING ARRESTER LUG FEEDING OH� . T.,.• ® 3" SAGE VAULT,NIITH 57-T-2-332P-PGE TOP PGE OWNED POLE yl PROVIDED 8)STALLED BY CUSTOMER CONDUIT PGE TO INSTALL 3d WAY LATERAL TAPS PGE E PULL 45•-z TRANSFER EXISTING PRI,NEU 8 +SsO ` 0 FAULT INDICATOR STREET UGHT .-. TEMP TRANSFER COMM I 5) , 210 ti INSTALL SING ns NOTED __.. ❑PGE PULLED. ,e _. 0 TOPPED TO COMM(S) . INSTALL 1$"POLE CONDUIT UNIT �9° W/12"BRACKETS ,INSTALL 3-1/0 AL-EPR JKT PRIMARY IN 14'PVC CONDUIT -.... .... _ 1 �(pQj PROVIDED a INSTALLED BY CUSTOMER 12 VT 155 U N 10700 ,PROVIDEDLL 142 81A AL-EPR.EDTA RIMARCUSTYMERr PVC CONDUIT VT-140 yr,at 11 2 aeon ]D asa INSTALL 14350 AL-TX SECONDARY IN I-Y PVC CONDUIT 2005 Vf-B INSTALLED j EL_- -i1Y PROVIDED 81NSTALLED BY CUSTOMER ON 142728386 VT-19›. 13 H 40' 135 :: L-i PL iii 10 -INSTALL: 3 025$0173 3T.4 I "INSTALL LOU AL-TX OH ST LT SECONDARY _. L A090KVA 0700 PAD O BE Cl 1.36A 72000,,MT TO 1 O.3W1 -PD-135 i T TO POLE,.PRONGED-SPAN .INSTALL I-F2 AL-TX 014 SECONDARY 5 CUSTOMERS I SPLICE1AND KEEP EXISTING OH 1 LOAD:301(W I A SOKVA / POLES• POLE CLASS (1,2,3,4,H1.H2,S) 18 17 16 15 14 1. 10730 nzt HT-a 'OLE HEIGHT(FEET) 9 e T 6 5 ° 8 FRAMING PD-138 7116 TRANSMISSION 6 DISTRIBUTION(SEE CODES BELOW) B SOKVA PO-139 VT-151 `\ B SOKVA ``�; J.Ca�wn 1 /15 0121{—IR3APKH,tOT96GBL 0�E FlBERG 71ASSMVOLY 6VT 119 VL-150iV1\ / dFFeeev�1Vf-t52I\]T(/ V1,136 11_ _-1..- -__- VT-v 1 `. 07 151 ' NOTE TO ASBUILT:SERVICE • o11- 4 I� COMES FROM A 15 49519 canto82AL-TX / 50'! Feeders 1442 N 4 CU I F65T OPEN I =e4a1 CONSTRUCTION NOTES: RSDEv B6CUN` - SW3" n=S7 - F3-14 CV S1a2 Necu8256329 A96CM /PesT 519 -143 65 TM/ 1.CUSTOMERTOPROVIDEALL TRENCHING ANDBACKFILLING JOINTUSETRENCH r 4583 -- WITH OAS.TRENCH TO BE bb INCHES DEEP AND 301NCHE5 WIDE,MEASURED FROM 494 - _ FINAL GRADE. :" / 1877 I'�' 1 2.A POE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS ^" •' JUNCTION BOXES AND EWIPMENSFACILRIES INCLUDING CONNECTION OR INSTALLATION REMOVE TRANSFORMER..-_.__...- '.� of CONWffSnND PULL STRINGS.CALL SERVICE COORDINATION AT 5033238100 �Ix�64D A2580173 -� \\\ - TO SCHEDULER PGE STANDBY CREW. PGE OWNED POLE \ 3.ALL PGE CONDUCTORS TO BE)STALLED IN GRAY SCHEDULE 40,ELECTRICAL GRADE.PJC CONDUIT WITH NYLON PULL R OF Gb( 500 LBS.TESL). PGE TO PULL PGE TO DETERMINE THE SUE AND NUMBER OF CONDUITS REWIRED. 10820 TEMP TRANSFER COMM(S) NOTE TO ASBUILT:THERE IS G1ASNTANOOTNU7a T1 ERE911K040 OURS O(SODA SKwLENio BEETR NCB„RADIs. ❑PGE PULLED. ONLY B PHASE ON THIS SPAN. ALL BENDS MUSTS FACTORY M.E.ALL ELBOWS URGER MN 4 INCH TO BE 0 O INCH RADIUS EEL OR PGE APPROVED FIBERGLASS BENDS ARE REWIRED TOPPED TO COMM(S) ONLY 1-143 657 EXISTING FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN ,FUSE 1W FEET OR LESS.THE MAXISMUM ON.BENDS N�CONDUIT RUN IS 270UDEGREES 4.CUSTOMER RESPONSBLE FOR ROAD CROSSINGS.ALLCROSSINGS OIUSTEXTEM) FROMPROPERTY UNETO PROP CpOciCFE.USEONLYerCTS&HEDULE40 CUSTOMER TO CALL PGE SERVICE DESK• Ix-4563 ELECTRIAL GRADE.PVC CONDUIT.CROSSINGS TO BEbINCHES DEEP,MSiKSUREO 503-323-6700,TO SCHEDULE CREW STAND BY FROM FINAL GRADE. WHILE PLUMBING INTO VAULT 1' ®� 5.DIRECTIONAL BORING REQUIREMENTS:BUCK ROPE I NIGH DENSITY POLVETNYLENp DUCT 12 CONDUIT R SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LME MECH.., _ CONNECTION PRODUCT AS AN ALTERNATIVE TO HOPE DUCT.HDPE SHALL MEET THE _ REQUIREMENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT MANAGE FOR SAFETY REASONS TNE DUCT SHALE BUCK WITH TXREE EWALLV$PACE EXINUDE{0p RED STRIPES(( CMM IS A SPECIN;ATON REQUIREMEry}� MANDREL TEST OF ? GOING O S S d U', j .7>.k4 1rov+o Ir 75,8b0# �8 NOPE PIPE IS REQUIRED AR ER STALUTION WITH PGE INSPECTOR PRESENT. G (POS.-LBS.) ' C) m O C , O c..- *" .............°-'°"'- MEM PRI 11,478# 8.CUSTOMER TO PROWDE ANDINSTALL 6U4-PGE VAULT WIIN 8843320.2125 COVER, ANCHORS x B m n m j QpC I-..•. U L VAULT MOpEL OREWNA ENT FOR PGE PAD MOUNT TRANSFORMERS. �wr i �C Wq a K��,FK��F�rP II���1 j r„-, NEUT 4,386# PApFFTOBEbETATFINALGRADE(SEE DETAILONSKElG10. m -' m Iy E I GUY mOmii6'i f4lYfiMiiii 6' M0.-•• INSTALL 4"PO LE CONDUIT UNIT 7.ALL PGE TRANSFORMERS TO SE INSTALLEDBFEET(MILS FROM 0$OC COMBUSTRLE (LEAD) , n1Im� BUILDING WALLOROVERNANGAN04FEET MI FROMA TRE Z...-T A (LBS) E F g b g, 2 GUYS ■ o WITH IY BRACKETS, C/O F65T POE TRANSFORMERS MUST BE WITHIN I5 FE.. ADRIVEABLE AREA ©©���� —I "�� BLIGNTNING ARRESTER ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS, ANCHOR CODE 1311211=11311211=1mOml�'6�'I� 3GUY5 E ,c ,P 1°' :•,•°?"" "" REMOVE FRAMING TO THE NORTH B SZEVEELNICRL9ER POSTS ARE REQUIRED AROUND TRANSFORMERS THATE EXPOSED „„z,,. „,e. ,.,, I""-"-"-r"'' NEED TREE TRIMMING 9.CONWRCOpi,:r EMERTHEVAULTGE�LOWIYRKNOCKwrS(TBASET-OucTS). `CONTACT SERVICE COORDINATOR 577-PGE SWITCH VAULT (SEE DEfAILONSKETCHI FOR T ARO CO MT PETTKM PRIOR -_ 1p.1pitraIrIVRE!£RRE,LRY EASEMENT(P.U.E)TO BE 8 FEET(MIR, O _PPP _ 5076: UN. MEM TO H 11.ESTIMTED 00 AMPS MOTOR STARTING CURRENT FOR FUCKER CALCUUTIONS SERVICE OR 803-A246 1YMATLOC$7IN TRANSFORMERLOADINGANDVOLTAGE DROPCALCUUTKMISBASEDONS NW T 503-323-8700 OR 8005424818 -' -' _____- APPROVED 6Y FOE RIGHT-OF-WAY PERMIT NOTICE: ER RESIDENCE. Y AAPPER6MIT FROM THE LOCAL JURISDICTION IS 6E0M660 BEFORE 025 12,CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MN POWER BE SR OF FINAL KIN THE S 000 CF-WAV MAYBE PERFORMID.ONLY PGE APPROVED TRENCHING FOR A R.POE. ION CONFERENCE.INCLUDED IN.15 CONFERENCE IBM VAULT TTERM-0UCTS / .—It CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTTER SPECIAL WILL BE EXCAVATOR,PGE,TELCO.CATV,AND GAS. YTO f�( -P■e`I - > APPROVED Wim' AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER POE'S PERMIT. 13.DESIGN IS BASED ON STANDARD UNDERGROUNDEWIPMEM.NONSTANDARD ' .P mevx PD135 r 8DDO .4 E CONTRACTOR MUST NOTIFY TILE LOCAL JURISDICTION 48 HOURS UNefooUNDEWI Lev IM oamsPTIONAT AN ADDITIONALCOST ` wrMwmH,vaE7A sv7cexmart ee[ EN YNA6_ EFORE KIS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE TO THE CUSTOMER. 4. PGE CONSTRUCTION DRAWING Iii � 4-TO 4RRTALL S'WM OATS: SCALE: ACCOUNT: AWG: JOB NO. \O 6 PL-4601 �� SIN x nno2o19 Nrs I 1070001 1000004545 I Mnze3es 4. TI E ��' THINR a Vi'-136 ANY DEVIATION FROM THIS DESIGN MUST Levi Leavasa / BE APPROVED BY PGE PROJECT MANAGER CIRCUIT SIZE o r• '�/� SAFETY ^ 7 /` WEST PORTLAND-NORTMI WEST PORTLAND-72ND AVE 17x22 G1 FIRST! ATTENnDN: CALL 611 BEFORE YOU DIG PGE LOCATION 88 ^AHIMJs 4.-6.- 7303 SW Spruce St,Tigard.OR 97224 FF d-TO OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 'o D da D EP�(7-np 10. PLAINS BY THE OREGON UTILITY NOTIFICATION CENTER ` DESCRIPTION " `` THOSE RULES ARE SET FORTH N OAR 952-001.0010 . OH TO UG CONVERSION-RELATED M2714875 Ir 6111. v THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY CTION I0 WORK WITH SHEET P�°"x'5O"°� " S E m" -^e`o ye a"`" PRE-CONSTRUCTION MEETING/TRENCH AND CONDUIT INSPECTION THE RULES BY CALLING THE OREGON UTILITY 9 BEAVEROW WASHINGTON�CI146W 1 OF 1 NOTIFICATION CENTER ADMINISTRATION C(503-232-198'0 SIGN BY PHONE Iw3 DRAWN BY YOUR PROJECT REQUIRES AIA STRUCTION MEETING.CONTACT YOUR SERVICE 8 DESIGN LINE CREW CENTER PROJECT MANAGER 7 TO 10 WORKING DAYS PRIOR TO1EXCAVATION TO COORDINATE THE TO REQUEST UTILITY LOCATES CALL THE OREGON knee when below. JOSE MARQUEZ 672.5452 PENIA TANTILOVA w.,x0eer smme.an nxn PRE-CON.PGE'S FIELD CONSTRUAND CONDUIT COORDINATOR IONS WILL PROVIDE YOUR TRENCH UT63TY NOTIFICATION CENTER,811 AT LEAST Call bolos.130041. BEAVERTON. 2 BUSINESS DAYS PRIOR TO EXCAVATION. 9 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer" Speed A B C Space E2 P, 20 50 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 (00.4 NE UNE 0A0 BE OAflHE10 ROAD PREPARED WORK TO STOP HEAD A B B C Buffer :L I* I* I* ♦ 1%i• —► K 4 11 � .H 100 R.MaC B B AlAI ROAD BE • T WORK PREPARED • AHEAD TO STOP® • 100 R.M. ONE LANE ROAD • . AHEAD 1 loPaoDafl A w ii>B BE V PREPARED TO STOP B (OpdoOR •4P ONE UNE ROAD 1 tAHEAD C ROAD V—.-- —. WORK AHEAD September 2016 Chapter 5