Loading...
Report . LOCATION DESCRIPTION NOTES A5.11 Revision Crawlspace replaced with slab on grade. Floor tag revised. A6.04 Deletion Horizontal shaft assembly removed. Revision Crawlspace replaced with slab on grade. Floor tag revised. A8.11 Deletion Footing at crawlspace detail removed. Revision Floor assembly revised in Base of Wall at Planter detail. A8.42 Revision Floor assembly revised to slab on grade. A8.61 Deletion Demising Wall—Slab/Crawlspace detail removed. Demising Wall—Crawlspace detail removed. A9.01 Deletion Door 002B removed. S1.01 Revision Typ Concrete Slab Holdown Anchorage— Field detail revised for Slab on Grade. Interior Rod Anchorage Near Perimeter detail revised. S2.01 Revision Concrete Footing Schedule revised for slab on grade. Notes revised for slab on grade. Basement Level Foundation Plan revised from crawlspace to slab on grade. S2.02 Revision Notes revised for slab on grade. Level 1 Foundation and Framing Plan revised from crawlspace to slab on grade. Details revised. Beam revised. S2.03 Revision Details revised. S3.01 Revision Details revised per slab on grade. S3.02 Deletion Section at Column detail removed. Crawlspace Beam/Col Connection detail removed. Beam/Col Connection detail removed. Revision Exterior Retaining Wall details revised per slab on grade. WF to WF Connection revised per slab on grade. S3.04 Revision Details revised per slab on grade. Deck Tie at Ledger details revised from precast concrete deck panels to composite decking. S4.03 Revision Top Stringer Connection detail revised from precast concrete deck panels to composite decking. Cantilevered Deck Section detail revised from precast concrete deck panels to composite decking. Deck Section Parallel with Joists detail revised from precast concrete deck panels to composite decking. FOR OFFICE USE ONLY–SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1114 Transmittal Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Tom Hochstatter DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED lt"ay nioNOV` 7 c0i9 FROM: CET r' BUILDING DIVISION COMPANY: Carleton Hart Architecture PHONE: 503-206- 50ZI By. 41 RE: 11090 SW 68th Parkway BUP2019-00081 (Site Address) - (Permit Number) Red Rock Creek Commons (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: # `Description:" Additional set(s) of plaict 3 Revisions: Foundation revised, see attached list 411 Cross section(s) and deta �I Wall bracing and/or lateral analysis. Floor/roof framing. )11/ Basement and retaining walls. Beam calculations. \ Engineer's calculations. Other(explain): REMARKS: See attached transmittal letter for a summary of changes. / FOR OFFICE USE ONLY Routed to Permit Te hi ician: Date: I )— i3. }q Initials. Fees Dui. OJ Yis No Fee Description: Amount D e: H $ q0--�� $ $ Special Instructions: Reprint Permit (per PE): ❑ Yes No ❑ Done Applicant Notified: ` Date: // /1 'f//1 Initials: I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012