Loading...
Specifications /12S 2o/9-av306. ///9ef Sw //LI,* Pi- MICHAEL K. BROWN, S.E. 17 " 5346 E. Branchwood Dr., Boise, ID 83716 208-850-7542, mike.brown@core-engineering.net JUL 2 . 20'9 E` U ' LATERAL STRUCTURAL DESIGN CALCULATIONS FOR LOT 8, BRIGHTWOOD TIGARD, OR ENGR. JOB # DM19-138 .. 77 idie -,f a r#y ;;'r , A - 12-31-2019' Prepared for: StoneBridge Homes, NW, LLC Plan #: 308C OTE: 2762 Date: 07-23-2019 The following calculations are for lateral wind and seismic engineering only. Gravity loading and the design of foundations are outside the scope of this design. The design is based on information provided by the client who is solely responsible for its accuracy. The engineering represents the finished product. Discrepancies from information provided by the client invalidate this design. Michael K.Brown,S.E.shall have no liability(expressed,or implied),with respect to the means and methods of construction workmanship or materials. Michael K. Brown, S.E.shall have no obligation of liability,whether arising in contract(including warranty),Tort(including active, passive, or imputed negligence) or otherwise, for loss or use, revenue or profit, or for any other incidental or consequential damage. Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mike.brown@core-engineering.net Job Name: Lot 8, Brightwood By: MKB Core Job Number: DM19-138 Date: July, 2019 Code Basis of Design: Latest Adopted Version of O.S.S.C. and O.R.S.C. Wind Loading: Either ASCE 7 or O.S.S.0 projected area method allowed. ASCE 7 used. Wind: 120 MPH ultimate wind speed, Exposure B, 8:12 Pitch roof Side to Side and 4:12 Pitch Front to Back. Per ASCE 7 Figure 28.6-1: Front to Back: Zone A: 31.6 PSF Zone B: 0 Zone C: 21.1 Zone D: 0 For Zones A and B, a=10% of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'. Least horizontal dimension = 40 feet Therefore, use a = 4 feet Side to Side Zone A: 25.7 PSF Zone B: 17.6 Zone C: 20.4 Zone D: 14 For Zones A and B, a=10% of least horizontal dimension or 0.4h (h=mean roof height), but not less than 3'. Least horizontal dimension = 46 feet Therefore, use a = 4.6 feet Upper Floor: Front to Back: Average force on projected wall = (total force at zone A + total force at zone C)/overall length: 23.2 PSF Average force on projected roof= (total force at zone B + total force at zone D)overall length: 0 PSF Wall Plate Height = 8 feet Projected Average Roof Height = 12 feet Total Wind Force at Upper Level = 3712 #, or 93 PLF Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mike.brown@core-engineering.net Job Name: Lot 8, Brightwood By: MKB Core Job Number: DM19-138 Date: July, 2019 Side to Side: Horizontal Dimension = 46 Feet Average force on projected wall = 21.5 PSF Average force on projected roof= 14.72 PSF Projected Average Roof height = 6 Feet Total Wind Force at Upper Level = 8011 #, or 174 PLF Mail Level: Plate height = 9 Feet Front to Back: Average force on projected wall = 23.2 PSF Projected Length = 40 Feet Total Wind force at Main Level = 8816 #, or 220 PLF Total Wind force Upper and Main = 12528 # Side to Side: Averag force on projected wall = 21.5 PSF Projected Length = 46 Feet Total Wind force at Main Level = 9378 #, or 204 PLF Total overall side to side wind force = 17389 Pounds Seismic Loading: D1 seismic design category per O.R.S.C. SDS= .83, R = 6.5, W = weight of structure V = [1.2 Sps/(R )] W V = .153W Roof Dead Load = 17 psf Floor Dead Load = 10 psf Int. wall Dead Load = 6 psf Ext. wall Dead Load 12 psf Seismic Front to Back: Tributary Roof Length = 46 Feet Tributary Floor Length = 46 Feet Equiv. Trib Int wall Length = 40 Feet Trib. Ext upper wall Height = 4 Feet Trib. Ext lower wall Height = 4.5 Feet Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise, ID 83716 208-850-7542 mike.brown@core-engineering.net Job Name: Lot 8, Brightwood By: MKB Core Job Number: DM19-138 Date: July, 2019 Wroof= 145.35 plf > 93 plf, therefore Seismic Gov. Wfloor = 125.001 plf < 220 plf, therefore Wind Gov. Total Seismic Load = 10814.04 Pounds < 12528 Therefore Wind Gov. overall Seismic Side to Side: Tributary Roof Length = 40 Feet Tributary Floor Length = 40 Feet Equiv. Trib Int wall Length = 20 Feet Trib. Ext upper wall Height = 4 Feet Trib. Ext lower wall Height = 4.5 Feet Wroof= 155.448 plf < 174 plf, therefore wind gov. Wfloor = 129.132 plf < 204 plf, therefore wind gov. Total Seismic Force = 13090.68 Pounds, < 17389 Pounds, therefore wind gov. overall Redundancy factor = 1.0 per ASCE 7, section 12.3.4.2 Roof Level Wall Lines: Line A: P = 145 * 20 ft = 2907 # Total Shear Wall Length = 16 Feet V=P/L = 182 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 2 Feet Shortest Wall Length 16 Feet Trib Floor Area = 0 Feet Mot = 16279 LB FT Factored Dead Load 78 PLF Mr = 9984 LB FT T = 393 LB No Uplift Line B: P = 145 * 20 ft = 2907 # Total Shear Wall Length = 23 Feet V=P/L = 126 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 2 Feet Shortest Wall Length 6 Feet Trib Floor Area = 0 Feet Mot = 4247 LB FT Factored Dead Load 78 PLF Mr = 1404 LB FT T = 474 LB No Uplift Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise, ID 83716 208-850-7542 mike.brown@core-engineering.net Job Name: Lot 8, Brightwood By: MKB Core Job Number: DM19-138 Date: July, 2019 Line 1: P = 174 * 23 ft = 4006 # Total Shear Wall Length = 21 Feet V=P/L = 191 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 23 Feet Shortest Wall Length 4 Feet Trib Floor Area = 0 Feet Mot = 4273 LB FT Factored Dead Load 292 PLF Mr = 2338 LB FT T = 484 LB No Uplift Line 2: P = 174 * 23 ft = 4006 # Total Shear Wall Length = 19 Feet V=P/L = 211 PLF Use A wall Wall Height = 8 Feet Trib Roof Area = 22 Shortest Wall Length 2.5 Feet Trib Floor Area = 0 Mot = 2952 LB FT Factored Dead Load 282 PLF Mr = 881 LB FT T = 828 LB Perp Wall & HDR to resist 2nd Floor / Low Roof Wall Line: Front to Back: Line A: P = 220 * 20 ft + 1856 = 6264 # Total Shear Wall Length = 28 Feet V=P/L = 224 PLF Use A wall Wall Height = 9 Feet Trib Roof Area = 2 Feet Shortest Wall Length 28 Feet Trib Floor Area = 2 Feet Mot = 33826 LB FT Factored Dead Load 97 PLF Mr = 38102 LB FT T = -153 LB No Uplift LineB: P = 220 * 20 ft + 1856 = 6264 # Total Shear Wall Length = 26 Feet V=P/L = 241 PLF Use A wall Michael K. Brown,S.E. 5346 E. Branchwood Dr. Boise,ID 83716 208-850-7542 mike.brown@core-engineering.net Job Name: Lot 8, Brightwood By: MKB Core Job Number: DM19-138 Date: July, 2019 Wall Height = 9 Feet Trib Roof Area = 2 Feet Shortest Wall Length 26 Feet Trib Floor Area = 2 Feet Mot = 33826 LB FT Factored Dead Load 97 PLF Mr = 32854 LB FT T = 37 LB No Uplift Side to Side: Line 1: P = 204 * 23 ft + 4006 = 8695 # Total Shear Wall Length = 14 Feet V=P/L = 621 PLF Use C wall Wall Height = 9 Feet Trib Roof Area = 23 Feet Shortest Wall Length 14 Feet Trib Floor Area = 8 Feet Mot = 46951 LB FT Factored Dead Load 347 PLF Mr = 34045 LB FT T = 922 LB Use type 1 HD Line 2: P = 204 * 23 ft + 4006 = 8695 # Total Shear Wall Length = 12 Feet V=P/L = 725 PLF Use D wall Wall Height = 9 Feet Trib Roof Area = 23 Feet Shortest Wall Length 2.5 Feet Trib Floor Area = 4.5 Feet Mot = 9782 LB FT Factored Dead Load 326 PLF Mr = 1020 LB FT T = 3505 LB Use Type 2 HD • N , • ••••. • • , • • • • • • -• • • . ' ' ' • WirMINAOSS • r-- MAIN FLOOR PLAN UPPER FLOORPLAN SCA.E:1/6'=PSCALE:1/8"-- NOLLVA3-131J31 rF j . .. �s u«ns�w�meNB .�.....,,�._. .:__..._ _......____'.. ........._ .............. _.....,. ) WNW mom. rwrw MOM IWWWW mom atom NWWW,WI WWWWWWW wwwwwwww dwY ID - uoox uvw rot 0� �1tll '� l 7{5idfi 111iI1IMiM1 r -•-•,,,,.,.._._....„..,...,...... U UMIN IUI M r 1luuIII1111IIIl A 1101A'H "-:,. I1IAI�III1I�11A I1[ii[III[ IA1llIIlIIl 110111q1Mi1A1 i �IAAIA� ! aol'w U iIrUN UUNIM) I M 011111110101111111 i � �U 1MkIU 1 IVI UMOUll Ir• ' ISI 111111 11 Irl WWI , rnmatA1I1nAAI t1iHum I NOLLVA313 1NOdj ' 00 3 E3 0 _ ........ ,_._. "_- ___.. .._ BULL R I�sl�w.lL (tel 1 �:.... :. uw�ioi1s • it • ..,,,•,.....,..,.„„z, { .1....100%t.* .._ j_ _. ../. +13 7411*"..A71. t11 i111e . ..................--______,-.1.74.!()' VA g NM ME I ri.,..... ..„„„„„.1 .....,„._ ...... • 1 , : . 111111 MI 1 DOM WNW Pi 011111011114 ION nedt"........ .....0111411111011100Il II i .. ! I I " __._. .__ ... .1r •.t�i1H Imiy1ANlno i �1111 I ;euAAnts i l ne A uNmI 4 I r3r11 ... 111111111 AC mi _ r zi tater o 1IfA10101A1I1'11,001 1, 111) _3. ISI, ; i le IAS M. _ U ..i. SHEARWALL SCHEDULE (a m) MARK REF NOTES: (a,i) Note: (b) EDGE NAILING FEILD NAILING SILL TO CONCRETE SILL TO WOOD SHEAR TRNASFER Lbs NUMBER SHEATHING NAIL SIZE SPACING SPACING CONNECTION. Note: (c) CONNECTION. Note (g) CLIPS (h) CAPACITY A16" OSB (1) SIDE 8d 6" 12" 2" Dia. A.B. @48" o/c 16d@6" o/c A35@18" o/c 384 B16" OSB (1) SIDE (f) 8d 4" 12" 2" Dia. A.B. @ 24" o/c 16d @ 4" o/c A35 @ 14" o/c 560 C16" OSB (1) SIDE (e,f) 8d 3" 12" 2" Dia. A.B. @ 18" o/c (m) 16d @ 3" o/c A35 @ 11" o/c 720 D16" OSB (1) SIDE (e,f) 8d 2" 12" 2" Dia. A.B. @ 16" o/c (m) 16d @ 2" o/c A35 @ 8" o/c 936 E 16" OSB (2) SIDE (d,e,f) 8d 6" 12" 2" Dia. A.B. @ 18" o/c (m) 16d @ 3" o/c A35 @ 10" o/c 768 F 16" OSB (2) SIDE (d,e,f) 8d 4" Staggered 12" 2" Dia. A.B. @ 12" o/c (m) 16d @ 2" o/c A35 @ 7" o/c 1120 G 16, OSB (2) SIDE (d,e,f) 8d 3" Staggered 12" 2"Dia. A.B. @ 10"o/c (m) 16d @ 3" o/c(2)rows staggered A35 @ 5" o/c 1440 H16" OSB (2) SIDE (d,e,f) 8d 2" Staggered 12" 2"Dia. A.B. @ 8" o/c (m) 16d @ 2" o/c(2)rows staggered HGA10KT @ 7" o/c 1872 Notes: a) Wood structural panels shall conform to the requireents for its type in DOC PS 1 or PS 2. All wall construction to conform to AF&PA SDPWS per IBC 2306.3. b) Use Common Wire Nails for all wood sheathing and cooler nails for gypboard sheathing. c) A.B. minimum 7" embed into concrete. 3"x3"x%" plate washers req'd at all shear wall A.B. Locate edge of Washer no greater than 2" from sheathed edge of sill plate. d) Panel joints shall be offset to fall on different framing members or framing shall be 3x or thicker and nails on each side shall be staggered. e) 3x or Dbl 2x framing at all panel edges and nails shall be staggered. f) All edges blocked. g) Common Wire Nails. h) Clip to be attached from continuous blocking to top of continuous top plates. Clips are not required at Gyp Bd walls but blocking is attached per the toenailing schedule. i) See attached typical shearwall details. j) Sheathing to be Structrual I Sheathing. k) Values are for framing of H-F. m) See plan for walls where seismic design shear is greater than 560 plf. 3x or 2x flat blkg at panel edges, Stagger nails. Where indicated on the plans 3x sills are required with A.B. spacing as per plan and schedule. See note C for plate washers req'd at A.B. For walls with the larger sills, Anchor Bolt spacing may be increased by a factor of 1.25 from the table above due to thicker sills. HOLDOWN SCHEDULE MARK Boundary Tension of DF Tension of HF Anchor Anchor NUMBER HOLDOWN Studs Allowable Lbs Allowable Lbs Mono Pour Two Pour 1 HDU2-SDS2.5 OR PHD2-SDS3 (2)2x 3075 2215 SSTB14 SSTB2OL 2 HDU4-SDS2.5 OR PHD5-SDS3 (2)2x 4545 3270 SSTB16L SSTB2OL 3 HDU8-SDS2.5 (3)2x 7870 5665 SSTB28L7/8"DIA.x24"MIN EMBED INTO CONC. A36 THREADED ROD w/HEAVY SQ. NUT AND BP7/8-2 BEARING PLATE WASHER @ BOTT. 4 HDU11 -SDS2.5 (1)6x 9535 6865 1°DIA.x42°A36 1"DIA.x42"A36 THREADED ROD w/ THREADED ROD w/ 8 HHDQ14-SDS2.5 (1)6x 13710 10745 HEAVY SQ. NUT ANDHEAVY SQ. NUT AND WASHER @ BOT. WASHER @ BOT. PROVIDE 24"EMBED PROVIDE 24"EMBED INTO CONT FTG. INTO CONT FTG. 5 MSTC28 (2)2x 3000 2590 N/A N/A 6 MSTC40 (2)2x 4335 3745 N/A N/A 7 MSTC66 (2)2x 5660 5660 N/A N/A Notes: 1 . Install all holdowns per manufactureer specificaiton per latest Simpson Strong Tie catalog. 2. Match studs on schedule for walls below on all wall to wall holdowns. 3. (Multiple)2x studs nailed together with (2) rows of 16d @ 3" o.c. staggered. 4. Refer to shearwall schedule and typical shearwall details for wall locations and configurations. 5. Refer to Simpson catalog for minimum embed of anchors into concrete.