Permit (3) CITY OF TIGARD BUILDING PERMIT
:1111
COMMUNITY DEVELOPMENT Permit#: BUP2019-00323
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/27/2019
Parcel: 2S102DA00200
Jurisdiction: Tigard
Site address: 8720 SW BURNHAM ST
Project: City of Tigard-Niche Subdivision: None Lot: None
Project Description: (3)new windows at the Niche building.
Contractor: OWNER Owner: TIGARD, CITY OF
13125 SW HALL BLVD 13125 SW HALL BLVD
TIGARD, OR 97223 TIGARD, OR 97223
PHONE: 971-808-8897 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: DC Provision Review,COM TI-Ping 11/27/2019 $102.00
Occupancy Grp: Occupancy Load: Permit Fee-Additions,Alterations, 11/27/2019 $149.75
Demolition
Dwelling Units: 0 12%State Surcharge-Building 11/27/2019 $17.97
Stories: 0 Height: 0 ft Plan Review 11/27/2019 $97.34
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 11/27/2019 $0.50
Value: $5,000 11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $367.56
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature: *GE/P.
�N
03.639.4175 by 7:00 a.m.for the next available inspection d. •.
This permit card shall be kept in a conspicuous place on the job site until corn.retion of the project.
Approved plans are required on the job site at the time of each inspection.
.i Building Permit Application
Commercial FOR OFFICE l SI:O\I.l
City of Tigard Received
M/� Permit No.: I, .:,- é ._0..7` 11.r 13125 SW Hall Blvd.,Tigard,OR 9"n31:... t—t V1--4-- PPlatn Review
C Phone: 503-718-2439 Fax: 503-598-1960 7 Date/B : Related Permit:
T I G A R D Inspection Line: 503-639-4175NOV 2 2019 Date Ready/By: 0 See Page 2 for
Internet: www.tigard-or.gov Notified/Method: VIMI Supplemental Information
CITY OF T!GARD
TYPE OF i! iliZINO DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction 0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
18 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling VI,Commercial/industrial
Valuation: $
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: "g7"Z 0 (r3 s,.inn L New dwelling area: square feet
City/State/ZIP: 'T;U C,g- Cn 22-3 Garage/carport area: square feet
Suite/bldg./apt.#: Project name: a, (i),,t a®t✓S Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ COO 0
Existing building area: square feet
Ilt,,J' , i 'i)C'...+:4 ,J 1 11 vto'f` 1� Ri cj'
t New building area: square feet
01 PROPERTY OWNER 0 TENANT Number of stories:
Name: (;}-7 0 F I tl c ri) Type of construction: re,,d2,
Address: Occupancy groups:
City/State/ZIP: Existing:
Phone:( ) Fax:( ) New:
I] APPLICANT RI CONTACT PERSON BUILDING PERMIT FEES*
Business name: / '� (Please refer to fee schedule)
`-, z{ / ....-77 Structural plan review fee(or deposit):
Contact name: v'�6,--‘ 3 a - s.
— --- FLS plan review fee(if applicable):
Address: �-
City/State/ZIP: Total fees due upon application: .76, ,, 51,,
Amount received:
Phone:(9)1 ) SA_vg 1-? Fax::( )
E-mail: Jc Shr<j '� y aT�.-L�(. 5r1�1 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
V J Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System.
Business name: ,. Submit two(2)sets of roof plan with connection details
' and fire department access,along with the 2010 Oregon
Address: Solar Installation Specialty Code checklist.
City/State/ZIP: Permit fee(includes plan review $180.00
and administrative fees):
Phone:( ) Fax:( ) �� State surcharge(12%of permit fee): $21.60
CCB Lic.: Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: f Date: /1-2.7- l * Fee methodology set by Tri-County Building Industry
h"� ``^^'�S Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(1) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:ABuilding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
I:ABuilding\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1;' Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:A Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard
.114 COMMUNITY DEVELOPMENT DEPARTMENT
T I G A R D Building Permit Review — Commercial - No Land U s e
ma., imam.
Building Permit #: 844// j`Y -003)3
Site Address: 33-LO SW gurr\t,(k ., Suite/Bldg#:
Project Name: kfAQ
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: IA4\-)1t 3 NA./ L,,,;44,4 ti} ZT Art n-1' S\'ra� .
Existing Business Activity: (gnle
Proposed Business Activity: O1-Q,
LW:
site address/suite#exists and active in permit system.
LLf River Terrace Neighborhood:f� CI Yes L�%J" No
CVZoning: h li�-�_, r�
al/Permitted Use: L� Yes ❑ No ❑ Spec Space
D'fonfirm no land use required.
`.Business License:
Exists: ❑ (
`Yes CI No,applicant was provided a business license application i
Notes: V144., (ih4Nltj (9at.\ ev,,,-d"rtC L'- art 4C.t�r � DOI& ,r2vMw, S� #4'11441(Irv\ (DC U 4. Ei S0,07-0• l
Approved by Planning: ..311i4 ( Date:
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: El Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: // 7 ts'
Site Plans: # 4/j
Building Plans: # /¢ f) v4(L(
Building Permit#: 7 t r building permit#above.
Workflow Routing: i,h,g ❑ Permit Coordinator C!"Building
Workflow Sign-off: Zi. iign-off for Planning(include notes from planning review)
Route Application Documents: ditig original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: � �i% Date: // )-7/tl
1:\Building\Forms\BldgPennitRvw_COM_NoLandUse l 11819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
I:\Building\Forms\BldgPermitRvw_COM_NoLandUse 111819.docx
Justin James
From: Mark VanDomelen
Sent: Thursday, November 21, 2019 9:32 AM
To: Justin James
Cc: Tom Hochstatter; Kevin Cole;#Building Permit Technicians;Walter Barnett
Subject: RE: Niche windows
Hi Justin,
You can just come over between 8am and 4:30pm Monday -Thursday and we will issue the
permit over the counter. The permit technicians can issue the permit and we will do plan
review on-site at the Niche. You can pay with your P-Card. The permit application is available
here at the permit center or on-line.
Thanks,
Mark VanDomelen 1-° 5�
City of Tigard U
Building Official
markv@tigard-or.gov
503-718-2448
Original Message
From: Justin James <justinj@tigard-or.gov>
Sent: Thursday, November 21, 2019 9:23 AM
To: Mark VanDomelen <markv@tigard-or.gov>
Cc: Tom Hochstatter <TomH@tigard-or.gov>; Kevin Cole <KevinC@tigard-or.gov>
Subject: Niche windows
Good morning Mark,
I talked to you a while back about installing 3 windows at the Niche in between the studs. I
have added a couple of pics for context.
I am ready and you mentioned I need to get a permit. You mentioned this should not require
drawings I thought and or just talking to Tom to get an over the counter permit?
No "structural" modifications are planned, just adding the windows and patching sheetrock
and paint.
Give me a call or let me know what I need to do.
Thank you
B. Conflicting standards. With the exception of public facility requirements, the requirements in this
chapter govern in the event of a conflict.
C. Exemptions. The following are exempt from the downtown development review procedures of this
chapter,but must comply with all standards:
1. Maintenance or repair of a building, structure, or site in a manner that is consistent with previous
approvals or necessary for safety;
2. Projects undertaken to bring an existing development into compliance with applicable federal and
state accessibility regulations;
3. Any modification to the exterior of a building that does not require a building permit;
4. Interior remodeling not associated with a change of use;
5. Temporary structures or temporary uses as defined in Chapter 18.440,Temporary Uses;
6. Any development involving a pre-existing single detached house that is not being converted to a
nonresidential use or that has previously been converted to a nonresidential use;
7. Any change of use and associated interior remodeling on a property that is in the Main Street
subarea; or
8. Any change to windows, doors, awnings, or other similar exterior elements on facades that are
not street-facing. (Ord. 18-23 §2; Ord. 17-22 §2)
18.650.030 Approval Process
A. Procedures.
1. Type I downtown development review. Downtown development review applications for
development or modifications that meet the thresholds of Paragraph 18.650.030.B.1 are processed
through a Type I procedure, as provided in Section 18.710.050, using the approval criteria in
Subsection 18.650.040.A.
2. Type II downtown development review. Downtown development review applications for
development or modifications that meet the thresholds of Paragraph 18.650.030.B.2 are processed
through a Type II procedure, as provided in Section 18.710.060, using the approval criteria in
Subsection 18.650.040.B.
3. Downtown adjustment. Downtown adjustment applications are processed concurrently with a
downtown development review, through a Type II procedure, as provided in Section 18.710.060,
using the approval criteria in Subsection 18.650.040.C. There are two types of downtown
adjustments:
a. Adjustments to the design standards of Section 18.650.060,and
t b. Specific adjustments allowed by Section 18.650.080.
Tigard Downtown Plan District 18.650-3 Code Update:12/18