Loading...
Report /1/157 ©cZ`1 ► lb s2$ 5(4) ii 01 st. CDESIGN FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: I Andrew Sidelinger Project Name: River Terrace East Date: 11/25/19 Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 1 301 Arrival: 0835 Departure: 0900 Weather: Overcast, 40s Permit#: TBD Site Visit Requested By: Rob Howser(Polygon) Met With (on site): Rob Purpose: Observe subgrade for lot 226 and 227 Outstanding Issues: Upon arrival, I observed that form work for lot 226 had been completed. Subgrade under the form work consisted of brown silt. Subgrade for lot 227 had also been prepared but no form work was present, it also consisted of brown silt. Using a%' steel foundation probe, I evaluated the relative consistency of the subgrade beneath the form work and open subgrade. Soils within the building footprints and beneath the form work for lot 226 were generally stiff to medium stiff where probed. Based on our observations, it is our opinion the subgrade observed for Lot 226 and 227 observed today, as indicated on the attached site plan, has been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments: Site Plan (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractors employees or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. Signature: //L4 °1°.1/ 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com