Loading...
Report v 1 fq?'I Sit/ ' nd t,r4 y��tJCTV„ Aiga October 13, 2019RECEIVED James G. Pierson, Inc. Sinte1945 Dave Brown NOV 18 2019 Precision Rail of Oregon PO Box 412. CITY OF TIGARD BUILDING DIVISION Gresham, OR 97030 Analysis of Residential Guardrail System Precision Rail Dear Mr. Brown: James G. Pierson, Inc. is pleased to submit this report which summarizes the results of the analysis of Precision Rail's Residential Guardrail System. Precision Rail of Oregon distributes aluminum picket, stainless steel cable, and glass railing systems for decks and stairs using aluminum products marketed under the trademark Alumarail. Alumarail is manufactured by Hydro Extrusions(formally known as SAPA). Previous versions of the Residential Guardrail System engineering report also prepared by Pierson, Inc. but directly for SAPA were incorporated into this report. CONCLUSIONS 1. The analysis demonstrates that the Precision Rail Residential guardrail system meets the requirements of the 2015 International Residential Code for systems used in one- and two-family dwellings as defined in those codes. Multiple family dwellings (apartments, condos, hotels) and other commercial applications, although similar use of the products, the design documentation required for those applications of the guardrails system is beyond the scope of this analysis. 2. The analysis utilizes allowable stress design(working stress design). The analysis provides a suitably conservative demonstration that the residential guardrail system meets the applicable code requirements. 3. Verification that the deck or balcony framing supporting the guardrail system meets the minimum sizes specified and is in good condition is beyond the scope of this report (by others). Consulting Structural Engineers 610 S .Alder Street.Suite 918, Portland,Oregon 97205 Tel (503)226-1286 Fax (503)226-3130 200 SERIES TOP RAIL CHECK 200 SERIES TOP RAILS FOR LOADING 3 34)0 ;L=6 ft;is desired maximum spacing of posts. ;L=6.000 ft Bending of Top Rail ;M=200 lbs*L/4=300.000 lb_ft;or • ; M=3600.000 lb_in 200 Series Top Rail (SAPA part 25878) 1140 ;Svert200=0.249 in4/1.199 in=0.208 in3 ;Shorz200= 1.442 in4/1.75 in=0.824 in3 Check for vertical loading direction: ;fb„en=M/Svert200=17334.940 psi ;<19,500 psi (for 6005-T5) ,_"Okay" Check for horizontal loading condition ;fbhorz=M/Shorz200 =4368.932 psi; <19,500 psi 200 Series Top Rail okay for 6 ft spacing of posts for vertical or horizontal loading Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location Date Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon CHECK BOTTOM RAILS 15/16" Check bottom rails for wind loads or 50 lbs over 1 sq,ft. ;L=6 ft;is desired maximum spacing of posts. ;L=6.000 ft 100 Series Bottom Rail 00 ;Svertloob=0.201 in4/1.159 in= 0.173 in3 ;Shorzioob=0.228 in4/1 in=0.228 in3 200 Series Bottom Rail ;Svert200b=0.1447 in3 ;Shorz2oob=0.2825 in3 100 SERIES BOTTOM RAIL 50 lbs over 1 sq.ft. Use 50 lb point load at midspan ;M=50 lb*L/4=75.000 lb_ft Check for vertical loading direction: 100 series stress;fbloo=M/Svertioob =5189.552 psi 1 3/8" 200 series stress;fb2oo=M/Shorz2oob=3185.841 psi Bottom rails okay for the 50 lb point load Check for horizontal loading direction: Check bottom rails for wind loads ;W= 30 psf;(i.e.,Oregon coast)or;w=W*39 in/2 ;w=48.750 plf ;Wind=w*L*L/8;Wind=2632.500 lb_in ;100 series Bending ;Mwind/Shomoob=11546.053psi ;200 series Bending ;Wind/Shorz2oob=9318.584psi 200 (HD) SERIES BOTTOM RAIL Use 200 series for bottom rails for all glass rail systems Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location Date Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon RAIL CONNECTIONS The top rail sections either slide over connection blocks or are attached to the top of the posts. In either case,(2)#10 self-drilling steel screws are used to make the connections. The connection blocks are attached to the sides of the vertical posts with (2)#10 self-drilling steel screws. In most cases,the 200 lb maximum load is shared by(4)screws but if the load(200 lbs)is placed at the end of a rail,it would be supported by just(2)screws. Maximum shear is each screw ;v=200 lbs/2=100.000 Allowable shear in each screw: 5.43 Screw Shear and Rearing The shear force on a screw shall not exceed the least of: 1) 2 Frit D ftlna. (Eq.5.4.3-1) If the screw is countersunk, one-half the depth of the countersink shall be deducted from r1. 2) 2F,4 0r3ht., (Eq.5.4.3-2) 3) z1.2(r230)Lc`F.2/ee,,for r2 s ri (Eq. 5.4.3-3) 4) P.„1(1.25 n,) (Eq.5.4.3-4) ; Ftuscrew=38000 psi ;dsaew=0.19 in ;#10 screw ;nu= 1.95 ;asd factor ;ns=3 ;factor of safety ;ti=0.1 in ;thickness bottom rail ;t2=0.1 in ;thickness post ;Pns =1526 lbs ;ESR-3332 report ;1) ;2*Ftuscrew*dscrew*ti/nu=740.513 lbs ;2) ;2*Ftuscrew*dscrew*b/nu=740.513 lbs ;3) ;4.2*(b3*dscrew)5*Ftuscrew/ns=733.311 lbs ;4) ;Pns/(1.25*ns)=406.933 lbs Okay #10 screws are okay to attach top rail to posts Bottom rail connection similar but 50 lb design load. #10 screws okay by inspection Protect Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location Date Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon ATTACHMENT OF RAILS TO BUILDING Check end plate of the top rail for attachment to the building Plate is attached to the top rail with(2)#10 Torx-drive flat head steel screws ;Shear capacity= 184 lbs each ;Tension Capacity;TC=0.0175 in2 x 30 ksi/2=262.500 2#10 screws are okay Assume only one anchor bolt at the middle(conservative—more than one bolt will be used) ;Mpiate=200 lb x 3 in/4=150.000 lb_in For 3/16"thick plate x 1"x 3" ;tplate=0.1875 in ;fb=Mplate x 6/(1 in -x tlate x tpiate)=25.600 ksi Fb =27.6 ksi 3/16"plates okay for wall anchorage Project Job no. James G. Pierson, Inc. Residential Guardrail systems Location Date Consulting Structural Engineers Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Posts All of the railing systems use the R Series Post for 36"or 42"height R Series Post (SAPA part 36430) ;Sxt =0.935 in4/1.188 in= 0.787 in3 For 40"tall posts(fascia mounted), 6 ft max spacing ;Ls=6 ft Per IRC ;Ml =200 lbs*(H36+4 in)=8000.000 lb_in • Per IBC ;M2=50 lbs/ft*Ls*(Has+4 in) =12000.000 lb_in For 46"tall posts(fascia mounted), 6 ft max spacing ;Ls=6 ft Per IRC ;M3=200 lbs*(H42+4 in) =9200.000 lb_in Per IBC ;M4=50 lbs/ft*L6*(H42+4 in) =13800.000 lb_in Standard Residential—36"+4"height ;Fb,=Mi!Sxl=10164.706 psi ;or;Fb2=M2/Sxl= 15247.059 psi Taller Posts—46"height ;Fb3=M3/Sxi=11689.412 psi ;or;Fb4=M4/Sxl= 17534.118 psi Allowable;Fb=19.487 ksi R Series Posts are good using both IBC or IRC for up to 6 ft spacing in bending at a height of 46"or less(fascia mounted 4" below deck,worst case) Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location Daze Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon POSTS -SHEAR Check shear in post walls Circumference of resisting area for screw pull-thru ;Cscrew=0.2 in*pi=0.628 in Post wall thickness;ti =0.10 in; (13503) ;Areal =Cscrew*t, =0.063 in2 ;V=Areal*Fshear/1.65=761.598 lbs ;>100 lbs Check Posts for Shear ;fy=300 lbs/(2*2.375 in*tt)=0.632 ksi ; not an issue 2.To join a straight connection,butt joint over the CHECK RAIL SPLICES center of a post.Reinforce the joint with 8 CO is 3/4"screws,fastened through pre-drilled holes, to a splice centered between the rails.Attach Check hat channel(SAPA 25877)rail splices. These members,when top rail to the post with 4*t8 x 1/2"screws. used,are located at rail splices over posts ti ;Mhat=200 lbs*6 in=1200.000 Ib_in ul * Hat Channel (SAPA part 25877) + ;Sverthat=0.0736 in3 4 ' ;Shorzhat=0.149 in3 ;Fbvert=Mhat/Sverthat=16304.348 psi ;Fbhorz=Mhat/Shorzhat=8053.691 psi ;Fty/1.65 =21212.121 psi ;Fb= 19487.179 psi Hat channels are okay Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location Date Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon TOP MOUNTED BASEPLATE Posts attach to plate at interior holes and is attached to substrate(deck)at hole located near the edges. _ I ! ;OTM=200 lbs*(H36+.375 in) ;OTM=7275.000 lb_in I ! 1 1 Tension in post base screw connections is;T=OTM/(2.116 in*2);T= I ! E i 1719.045 lbs SAE Grade 5 screws ; Ftsrrew=120 ksi*.75=90.000 ksi i 21 16 I Ni ti Check Screws Per ADM 5.4 Try 5/16"diameter screws (minor area=.0524 in^2) ;D=0.3125 in ;Dws=0.625 in ;Dh=0.28 in;(screw chase) ;tc=1 in;(min into screw chase) .r. ;Fm2=38 ksi +— 0,525 11 ;Phil =38 ksi 1.573 5.000 ;Fty= 16 ksi ;ns=3 ;factor of safety ;C=1 5.000 ;ti=.375 in ;Foot=1.63*D*tc*Ftu2=19356.250 lbs ;(eq. 5.4.2.1-6) 0 0 1370 ;Pot=Ftscrew*.0524 in^2=4716.000 lbs ;(nominal tensile strength fo screw) ;Pnov=(0.27+1.45*1.1)*D*tt*Fty=3496.875 lbs ;(eq.5.4.2.2-2) 0.4 a ADM 5.4.2 Allowable (�-�,� ; Past/ns=6452.083 lbs 0 000 ; Pnt/(1.25*ns)=1257.600 lbs a ;Pnov Ins=1165.625 lbs A 0 Load Test Connection 0.630 Load Test is 2.5x design load t.STo Check Screws for 42"tall posts and IRC Loading at 6 ft post spacing ;OTM42=200 lbs*2.5*(H42+.375 in) ; OTM42=21187.500 lb_in Tension in post base screw connections is;T42=OTM42/(2.116 in*2);T42= 5006.498 lbs ;Load Test to verify Use(2)5/16"diameter x 2"long SAE Grade 5(min.)self tapping Torx drive flate head screws(1 %2a min. Embedment into post) Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location nate Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Check Top Mounted Base Plate Bending Check 3/8"x 5"x 5" plate ;Tpiate=OTM/3.75 in=1940.000 lb ;Bending=OTM/(5 in*(5 in)2/6); Bending=349.200 psi ;d=2.22 in ;T=Bending*d/2*5 in;T=1938.060 lb Plate bending is maximum below edge of post or 1.3125"from plate edge ;P2=(2.22 in—1.3125 in)/2.22 in*Bending=142.747 psi ;Mmax=((P2*1.3125 in2/2)+((Bending—P2)*1.3125 in2/(2)*(2/3)))*5 in ;Mmax=920.005 lb_in ;Fb=Mmax*6/(5 in*.375 in*.375 in)=7850.708 psi Bending Okay for standard 5x5 plate Check 3/8"x 3"x 5" plate (stair use) ;Tplate2=OTM/2.38 in=3056.723 lb ;Bending2=OTM/(3 in*(5 in)2/6); Bending2=582.000 psi ;d=2.22 in ;T=Bending2*d/2*3 in;T=1938.060 lb Plate bending is maximum below edge of post or.3125"from plate edge ;P3=(2.22 in—.3125 in)/2.22 in*Bending=300.045 psi ;Mmax2=((P3*.3125 in2/2)+((Bending—P3)*.3125 in2/(2)*(2/3)))*5 in ;Mmax2=260.012 lb_in ;Fb=Mmax2*6/(5 in*.375 in*.375 in)=2218.766 psi Bending in smaller plate also okay Project Job no. James G. Pierson, Inc. Residential Guardrail systems Consulting Structural Engineers Location °aie Oregon and Washington 5/1/2019 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Cheat Sheet no. Precision Rail of Oregon BASE PLATE ATTACHMENT Anchor Tension;AT=OTM42/4.375 in;AT=2905.714 lb 2 anchors per side ;Atbolt=AT/2=1452.857 lb Wood: Try 3/8"diameter lag bolts and assume Douglas Fir ;Tallow=305 lb/in*1.6*2.78 in;, 5"long lag,2 25/32"embed 1.6 Cd wood factor ;Tallow= 1356.640 lb Use 3/8"daimeter x 5"embedment lag screws(4 corners) Concrete: Assume 4"thick concrete—use Simpson 3/8"diameter strong bolts 5"concrete—can use 3/8"Titen HD w/3"embedment See attached ACI 318 Appendix D calc. Project Job no. James G. Pierson, Inc. Residential Guardrail systems Location Date Consulting Structural Engineers Oregon and Washington 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Precision Rail of Oregon Page 15 of 48 Guard Rail Cable Calculations TASK: Determine if proposed guard rail cables met deflection requirements CABLE PROPERTIES: Cable Material: 316 Stainless Steel Cable Construction Type: 1 x 19 Young's Modulus: ;E = 15000000 psi Cable Diameter: ;d=0.125 in Cross-Sectional Area: ;A= (3t x d2)/4=0.012 in2 Cable Spacing: ;S=3.125 in Full Cable Length: ;L=50 ft =600.000 in Unsupported Cable Span: ;1=60.00 in FORCES ON CABLE: IBC 2015 1015.4: "Required guards shall not have openings that allow passage of a sphere of 4 inches in diameter from the walking surface to the required guard height." ASCE 7-10 4.5.1: "Intermediate rails(all those excep the handrail or top rail)and panel fillers shall be designed to withstand a horiztonally applied normal load of 50 lb on an aea not to exceed 12in by 12in". Required Force: ;FReq=50.00 psf Sphere Diameter: ;D=4.00 in Sphere Cirumference: ;C= (a x D2)/4 =0.087 ft2 Projected Load over Circumference: ;Fproj=FReq x C=4.363 lb Safety Factor: ;FS= 2; or use 50 lbs over 4 pages ; ;FMax= 12.5 lb � I i DI rd Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers L Son Date 610 S.W.Alder,Suite 918 Portland,Oregon 97205 10/10/2018 Tel:(503)226-1286 Fax(503)226-3130 Client Sheet no. Page 28 of 48 ANGLED FORCES AND CABLE DEFLECTION: When the 4"sphere is pushed through the cables,they are forced to move both vertically and horizontally,with the vertical displacement governing.The angle of the resultant force is approximately 45 degrees,which will be utilized in the angled force and deflection calculations. Angled Force on Cable: ;FA=1/((FMax)2+ (FMax)2)= 17.678 lb Allowable Vertical Deflection: ;aver=(D—S)/2=0.437 in; (governs) Allowable Cable Deflection: ;am=1/(ave?+avert)=0.619 in ;per cable 0.62" r 0.44" Fa `. Fa • b Deflection equation derivation: T=(FAxI)/(4xa); =2xa2/I; =(TxL)/(ExA)=(FAxI)/(4xa)xL/(ExA); 2xa2/l=(FAxI)/(4xa)xL/(ExA); 8xa3/I=(FAxIxL)/(ExA); 8xa3=(FAxI^2x L)/(ExA); a3=(FAxI^2x L)/(8xExA); a=((FAxI^2x L)/(8xExA))113; Deflection due to sphere load: ;as=((FA x I2 x L)/(8 x E x A))1r3= 2.960 in James G. Pierson, Inc. Pmject Cables Job no. Consulting Structural Engineers t°°anon Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 29 of 48 CABLE TENSION FORCE: Deflection due to load is higher than the allowable, so cable is to be pretensioned to be compliant. Tension in cable due to sphere load: ;Ts=(FA x I)/(4 x as)=89.589 lb Tension in cable at max deflection: ;Ta=Ts x(as/awl)=428.571 lb Required pretension: ;Tip =Ta—Ts=338.983 lb • Cable is recommended by supplier to be tensioned at 300 lbs/cable which is greater than the required pretension. Thus, cable is compliant with both codes IBC 2015 and IRC 2015. CABLE TENSION FORCE FOR SHORTER SPANS: Unsupported Cable Span: ;I=54.00 in Deflection due to sphere load: ;as= ((FA x 12 x L)/(8 x E x A))1/3=2.759 in Tension in cable due to sphere load: ;Ts=(FA x I)/(4 x as)=86.497 lb Tension in cable at max deflection: ;Ta=Ts x(as/am)=385.714 lb Required pretension: ;To=Ta—Ts=299.217 lb Unsupported Cable Span: ;1=48.00 in Deflection due to sphere load: ;as=((FA x12 x L)/(8 x E x A))1/3= 2.551 in Tension in cable due to sphere load: ;Ts=(FA x I)/(4 x as)=83.167 lb Tension in cable at max deflection: ;Ta=Ts x(as/am)=342.857 lb Required pretension: ;To=Ta—Ts=259.690 lb Unsupported Cable Span: ;I=42.00 in Deflection due to sphere load: ;as=((FA x 12 x L)/(8 x E x A))1'3=2.333 in Tension in cable due to sphere load: ;Ts=(FA x I)/(4 x as)=79.546 lb Tension in cable at max deflection: ;Ta=Ts x(as/am)=300.000 lb Required pretension: ;Tps=Ta—Ts=220.454 lb Unsupported Cable Span: ;1= 36.00 in Deflection due to sphere load: ;as= ((FA x 12 x L)/(8 x E x A))1n= 2.106 in Tension in cable due to sphere load: ;Ts=(FA x I)/(4 x as)=75.562 lb Tension in cable at max deflection: ;Ta=Ts x (as/am)=257.143 lb Required pretension: ;Tp5=Ta—Ts= 181.581 lb Unsupported Cable Length: Required Pretension: ;60 in ; Tip =338.983 lb ;54 in ;Tp2=299.217 lb ;48 in ;Tps=259.690 lb ;42 in ; Tpa=220.454 lb ;36 in ; ; To= 181.581 lb ; Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Cheat Sheet no. Page 30 of 48 Cable Forces on Posts: 6' w - MAX .._._.,..,. EQ EQ CONT. 9 ,/f TOP RAIL RAIL REACTION ? i CAOLE TENSION< CAOLC TCNCION CAOLC TCNCION< CAOLC TCNSION< CABLE TCNCION< 3/16" "-- CABLE TENSION< CABLE { CAOLC TCNSION< INFILL GABLE TCNCION< CABLE TENCION< 2 3/8° ii CAOLE TCNCION< POST IL REACTION PICKET BOTTOM SPACER RAIL TYPICAL ELEVATION Cable Tension is resisted by the termination posts and also corners or changes in direction. Top rail acts as a compression member to resist cable tension forces. Bottom rail also acts as a compression member resisting cable tension when present. If there is no bottom rail,the base connection is required to resist the tension forces from cables. Top rail flat inserts(required for astestics)bear directly on face of post so tension forces are resisted by bearing and not just screws. For top rails when no infill is used, rail must be attached to posts with screws desgined to resist tension force. Screw shear: Per Aluminum Design Manual: 5.4.3 Screw Shear and Bearing The shear force on a screw shall not exceed the least of: 1) 2 F.,11)ttInr. (Eq.5.4.3-1) James G. Pierson, Inc. Project Cables Job no. Consulting Structural Engineers Location nate 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 31 of 48 2) 2F„a Dt2/n„ (Eq.5.4.3-2) 3) 4.2(123D)"n F,.2/n„fort;5 t, (Eq.5.4.3-3) 4) P /(1.25 n,) (Eq. 5.4.34) 5.4.4 Minimum Spacing of Screws The minimum distance between screw centers shall he 2.5 times the nominal screw diameter. Minimum; Ft i =38000 psi;post and rails ;#10 screw;dsc ew=0.190 in Post thickness;ti =0.10 in ;Vanowio=2*F1 1 *dstxew*ti/3=481.333 lbs Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Loathe!) Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 32 of 48 Posts Cable Systems also use R Series Posts(SAPA part 36430) ;H36=36 in ; H42=42 in Intermediate posts(not used for cable termination) Residentail Post ;Six = .787 in3 For 36"tall posts, 4.5 ft max spacing ;Le=54 in Per IRC ;Mi =200 lbs*Has=7200.000 lb_in For 42"tall posts, 4.5 ft max spacing ;L5=54 in Per IRC ;M3=200 lbs*H42=8400.000 lb_in Residential—36"height ;Fbi =Mi/Sxi=9148.666 psi ; Commercial—42"height ;Fb3=M3/Sxi=10673.443 psi ; Allowable; Fb=19487.18 psi; Post good for either height and bending Termination posts(used for cable termination) also use R Series Posts(SAPA part 36430) ;Syi = 0.787 in3 ;Sxxi=0.787 in3 Out of plane loading For 36"tall posts, 4.5 ft max spacing ;L6=54 in Per IRC ;Mi =200 lbs*H36=7200.000 lb_in;at base connection ;M5=200 lbs*H36/2=3600.000 lb_in;at mid-height For 42"tall posts, 4.5 ft max spacing ;L5=54 in Per IRC ;M3=200 lbs*H42=8400.000 lb_in;at base connection ;Ms=200 lbs*H42/2=4200.000 lb_in ;at mid-height Residential—36"height ;Fbi =Mi/Sxxi=9148.666 psi ;at bottom connection ;Fb5=M5/Sxxi=4574.333 psi ;at midheight Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 33 of 48 Commercial—42"height ;Fb3=M3/Sxxi=10673.443 psi ;at bottom connection ;Fb6=M6/Sxxi=5336.722 psi ;at mid height Allowable; Fb =19487.180 psi Check bending in other direction due to Cable tension bending (in-plane) For 225 lbs tension For 36"tall posts;M2=926 lb_ft For 42"tall posts ;M4= 1287 lb_ft Residential—36"height ;Fb2=M2/Sy1= 14.119 ksi ; Commercial—42"height ;Fb4=Ma/Syi=19.624 ksi ; Allowable; Fb =19487.180 psi 36"Posts combined Loading(check at midheight): ;Ebb/Fb + Fb2/Fb = 0.959 36"tall Post good for tension created bending plus guardrail forces. 42"Posts combined Loading(checked at midheight): ;Fb6/Fb + Fb4/Fb = 1.281 42"tall Post not okay for tension created bending plus guardrail forces without bottom rail Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 34 of 48 Base Plate Attachment— Typ Line Post 5x5x3/8" Plate ;Hs6=36in Anchor Tension;AT=Mi/4.375 in;AT=1645.714 lb 2 anchors per side ;Atbolt=AT/2=822.857 lb Wood: Try 3/8"diameter lag bolts and assume Douglas Fir ;Tallow=305 lb/in*1.6*2.78 in ;, 5"long lag,2 25/32"embed 1.6 Cd wood factor ;Tallow= 1356.640 lb Use 3/8"diameter x 5"embedment lag screws(4 corners) Try 318"diameter lag bolts and assume Hem Fir PT ;Tallow=269 lb/in* 1.6*3.28 in;, 6"long lag,3 9/32"embed 1.6 Cd wood factor ;Tallow= 1411.712 lb Use 3/8"diameter x 6"embedment lag screws(4 corners) Try 7/16"diameter lag bolts and assume Hem Fir PT ;Tallow=302 lb/in*1.6*2.22 in;, 4"long lag,2 7/32"embed 1.6 Cd wood factor ;Tallow= 1072.704 lb Use 7/16"diameter x 4"embedment lag screws(4 corners) Try#14 x 5"stainless steel wood screws and assume Hem Fir PT ;Tallow=146 lb/in*1.6*5 in;, 5"long screws,5"embed 1.6 Cd wood factor ;Tallow= 1168.000 lb Just works #14-5"wood screws(4 corners) 5x5x3/8" Plate ; H42=42 in Anchor Tension;AT=Ms/4.375 in;AT=1920.000 lb 2 anchors per side ;Atbolt=AT/2=960.000 lb Try#14 x 5"stainless steel wod screws and assume Hem Fir PT ;Tallow=146 lb/in* 1.6*5 in;, 5"long lag,5"embed 1.6 Cd wood factor ;Tallow= 1168.000 lb Use#14 x 5"embedment ss wood screws(4 corners) Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 35 of 48 Cable System Posts aY2), 72'MAX.POST SPAN 'F Cable Systems also use R Series Posts(SAPA part 36430) 1 SERIES 200 5/8"sa.CABLE DX"SS TOP RAIL SPREADER CABLE ;H36=36 in ; Ha2=42 in va Intermediate posts (not used for cable termination) ° ( N. , Residentail Post ‘ , ;SXi = .787 in3 1 For 36"tall posts, 6 ft max spacing ;L6=54 in --Ay `-� ^` Per IRC ;Mi=200 lbs*H36=7200.000 lb in — N 1'SPHERE SHALL BOTTOM RAIL 1 FINISH NOT PASS THRU FLOOR )IA.X 10"LAG SCREWS xr IF 5X5 BASEPLATEi _ For 42"tall posts, 6 ft max spacing ;L5=54 in TYPICAL ELEVATION VIEW Per IRC ;M3=200 lbs*H42=8400.000 lb_in Residential—36"height SERIES 200 SERIES 200 ;Fb1 =Mu/Sxi=9148.666 psi ; TOP RAIL TOP RAIL N. Kr SS CABLE 118•TENSSS CABLE : PRETENSIONED re PREIONED Commercial—42"height $ TO 100LBSILI N 00 To 100LB5 to ;Fb3=M3/&I=10673.443 psi ; Z NOTE 9 CABLES FOR 2= Z NOTE:9 CABLES FOR l g S IL 36'SYSTEM WITH IT 3B•SYSTEM WITH o > BOTTOM RAIL I Ir > BOTTOM RAIL N K Allowable; Fb=19487.18 psi; a Y.'SD.PICKET LL a sa.PICKET LL I OW H o� t0_! BOTTOM RAIL p Z (2 BOTTOM RAIL 0 Z W S ~U Ti . U Post good for either height and bending Z /'SPHERE SHALL 1 w OZ a'SPHERE SHALL ,O • NOT PASS THRU l I' NOT PASS THRU ~ FINISH FINISH FLOOR ��j FLOOR i$( Single Corner Post 1� •"''�"`� 1 318'DIA.THREADED y', 225- ATPOS LOCATIONS.�lb:;= 1 alt ROD IN SIMPSON SET MW LAG SCREWS MUST BEILMIN. XP EPDXY:6'EMBED FULLY EMBEDDED INTO j 1M. SOLID WOOD (318' Check Bending due to cable tension around corners TYPICAL SECTION VIEW TYPICAL SECTION VIEW ;SZ1 = .586 in3 (CONCRETE DECK) (WOOD DECK) For 180 lbs tension(3'-0"ft max span between cable supports with bottom rail) For 36"tall posts;M2=860 lb_ft ;180 lbs x 9 cables over 3 ft divided by Sin 45 degres x LA2/8 For 42"tall posts ;M4=1225 lb_ft Residential—36"height ;Fb2=M2/S21= 17.611 ksi ; Commercial—42"height ;Fba=Ma/Sri=25.085 ksi ; Allowable; Fb =19487.180 psi Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 39 of 48 36"Posts combined Loading(check at midheight): ;Fb5/Fb + Fb2/Fb= 1.138 36"tall single corner post overstressed for combined loading of tension and 200 lb force pulling in. For typical fall(outward force),loads are not additive and post would be okay. Corner post also can share the 200 lb load(or 50 plf)with other posts through the top chords. As such,36"single corner post at 36"tall is okay for 180 lbs of cable tension or less. 42""R"Posts combined Loading(checked at midheight): ;Fb6/Fb + Fb4/Fb = 1.561 42"tall"R"Post not okay for tension created bending plus guardrail forces For 180 lbs tension(3'-0"ft max span between cable supports without bottom rail) For 36"tall posts;M2=954 lb_ft ;180 lbs x 10 cables over 3 ft divided by Sin 45 degres x LA2/8 For 42"tall posts ;M4=1235 lb_ft Residential—36"height ;Fb2=M2/Szl=19.536 ksi ; Commercial—42"height ;Fb4=M4/Szi=25.290 ksi ; Allowable; Fb =19487.180 psi 36"Posts combined Loading(check at midheight): ;Fbs/Fb + Fb2/Fb= 1.237 36"tall Post not okay for tension created bending plus guardrail forces without bottom rail. 42""R"Posts combined Loading(checked at midheight): ;Fbs/Fb + Fb4/Fb= 1.572 42"tall"R"Post not okay for tension created bending plus guardrail forces Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers °ca°on Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 40 of 48 Termination posts (used for cable termination) also use R Series Posts(SAPA part 36430) ;So = 0.787 in3 ;Sxxi =0.787 in3 Out of plane loading For 36"tall posts, 6 ft max spacing ;Ls=72 in Per IRC ;Mi =200 lbs*Has=7200.000 lb_in;at base connection ;M5=200 lbs*H36/2=3600.000 lb_in;at mid-height For 42"tall posts, 6 ft max spacing ;L5=72 in Per IRC ;M3=200 lbs*H42=8400.000 lb_in;at base connection ;Ms=200 lbs*H42/2=4200.000 lb_in;at mid-height Residential—36"height ;Fbi =Mi!Sxxi=9148.666 psi ;at bottom connection ;Fb5=M5/Sxxi=4574.333 psi ;at midheight Commercial—42"height ;Fb3=M3/Sxxi=10673.443 psi ;at bottom connection ;Fbs=Ms/Sxxi=5336.722 psi ;at midheight Allowable; Fb =19487.180 psi Check bending in other direction due to Cable tension bending (in-plane) For 180 lbs tension(3'-0"ft max span between cable supports—with bottom rail) For 36"tall posts;M2=608 lb_ft For 42"tall posts ;M4=866 lb_ft Residential—36"height ;Fb2=M2/So=9.271 ksi ; Commercial—42"height ;Fb4=M4/So=13.205 ksi ; Allowable; Fb =19487.180 psi 36" Posts combined Loading(check at midheight): ;Fb5/Fb + Fb2/Fb = 0.710 Project Job no. James G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 41 of 48 36"tall Post good for tension created bending plus guardrail forces. 42""R"Posts combined Loading(checked at midheight): ;Fbe/Fb+ Fb4/Fb=0.951 42"tall Post okay for tension created bending plus guardrail forces with bottom rail For 180 lbs tension(3'-0"ft max span between cable supports—without bottom rail) For 36"tall posts;M2=675 lb_ft For 42"tall posts ;M4=945 lb_ft Residential—36"height ;Fb2=M2/Sy1=10.292 ksi ; Commercial—42"height ;Fb4=M4/Syl=14.409 ksi ; Allowable;Fb=19487.180 psi 36"Posts combined Loading(check at midheight): ;Fbs/Fb + Fb2/Fb= 0.763 36"tall Post good for tension created bending plus guardrail forces. 42""R"Posts combined Loading(checked at midheight): ;Fbe/Fb + Fb4/Fb = 1.013 42"tall Post okay for tension created bending plus guardrail forces without bottom rail(3 ft max or 180 lbs tension) Project Job no. Tames G. Pierson, Inc. Cables Consulting Structural Engineers Location Date 10/10/2018 610 S.W.Alder,Suite 918 Portland,Oregon 97205 Tel:(503)226-1286 Fax:(503)226-3130 Client Sheet no. Page 42 of 48 FLOORS i i / HOLD-DOWN OR SIMILAR / TENSION DEVICE FLOOR SHEATHING NAILING AT 6"MAXIMUM ON CENTER TO JOIST WITH HOLD-DOWN /t".1 -<_ I + + .t-I l = + + + + + INM , + + / FLOOR JOIST i / DECK JOIST / Y For SI: 1 inch=25.4 mm. I FIGURE 507.2.3(1) DECK ATTACHMENT FOR LATERAL LOADS SHEATHING NOTE: SIDING THIS DETAIL IS APPLICABLE WHERE FLOOR JOISTS ARE ' FLASHING FOR PARALLEL TO DECK JOISTS. WATER TIGHTNESS DECKING II I�',' APPROVED JOIST HANGERS 2"MIN. 'I.I``' 2x LEDGER WITH FASTENERS I�III�I,VIM IN ACCORDANCE WITH TABLE R507.2 _., �� HOLD-DOWN DEVICE MIN 750 LB. CAPACITY FLOOR JOISTSIN AT 4 LOCATIONS, EVENLY DISTRIBUTED ALONG DECK AND ONE WITHIN 24"OF EACH END OF THE LEDGER. HOLD-DOWN DEVICES SHALL FULLY ENGAGE DECK JOIST PER HOLD-DOWN MANUFACTURER. A FULLY THREADED 3/8"DIAMETER LAG - SCREW PREDRILLED W/MIN. 3"PENETRATION TO CENTER OF TOP PLATE,STUDS,OR HEADER. For SI: 1 inch=25.4 mm,1 foot=304.8 mm. FIGURE R507.2.3(2) DECK ATTACHMENT FOR LATERAL LOADS 152 2017 OREGON RESIDENTIAL SPECIALTY CODE FLOORS z STAGGER FASTENERS IN 2 ROWS Qp 0 5.5"MIN.FOR 2 X 8* `DISTANCE SHALL BE PERMITTED TO 5"MAX 6.5"MIN.FOR 2 X 10 BE REDUCED TO 4.5"IF LAG SCREWS O O O 7.5"MIN.FOR 2 X 12 ARE USED OR BOLT SPACING IS REDUCED TO THAT OF LAG SCREWS TO ATTACH 2 X 8 LEDGERS TO 2 X 8 2"MIN. BAND JOISTS. LEDGER / LAG SCREW OR BOLT 3/4"MIN. For SI: 1 inch=25.4 mm. FIGURE R507.2.1(1) PLACEMENT OF LAG SCREWS AND BOLTS IN LEDGERS EXTERIOR SHEATHING EXISTING STUD WALL EXISTING 2x BAND JOIST OR ENGINEERED RIM BOARD 2""MIN. DECK JOIST MIN. MR ' 5""MAX.MI w�mgmdiravii LAG SCREWS OR BOLTS 2"MIN. o o 0 FLOOR FRAMING • O ' a a 0 JOIST HANGER I. O -0 EXISTING :o o- 00 0 FOUNDATION WALL For SI: 1 inch=25.4 mm. FIGURE R507.2.1(2) PLACEMENT OF LAG SCREWS AND BOLTS IN BAND JOISTS R507.2.2 Band joist details.Band joists attached by a led- R507.2.4 Deck lateral load connection. The lateral load ger in accordance with Section R507.2 shall be a minimum connection required by Section R507.1 shall be permitted 2-inch-nominal (51 mm), solid-sawn, spruce-pine-fir lum- to be in accordance with Figure R507.2.3(1) or ber or a minimum 1-inch by 91/2-inch (25 mm x 241 mm) R507.2.3(2).Where the lateral load connection is provided dimensional, Douglas fir, laminated veneer lumber. Band in accordance with Figure R507.2.3(1),hold-down tension joists attached by a ledger in accordance with Section devices shall be installed in not less than two locations per R507.2 shall be fully supported by a wall or sill plate below. deck, within 24 inches of each end of the deck. Each R507.2.3 Ledger to band joist fastener details. Fasten- device shall have an allowable stress design capacity of ers used in deck ledger connections in accordance with not less than 1,500 pounds (6672 N). Where the lateral Table R507.2 shall be hot-dipped galvanized or stainless load connections are provided in accordance with Figure steel and shall be installed in accordance with Table R507.2.3(2), the hold-down tension devices shall be R507.2.1 and Figures 8507.2.1(1) and R507.2.1(2). installed in not less thartiourlacationsper deck, and each device shall have an allowable stress design capacity of not less than 750 pounds(3336 N). 2017 OREGON RESIDENTIAL SPECIALTY CODE 151