Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
Wood structural members that art exposed to the weather to be OFFICE COPY Pressure Treated or decay re,eisteru LIABILITY Der 317.1.3 The City of Tigard and its / Deck Addition o employees shall not be N j `" x' O p . r' -o- • 1 res onslbl a which m` appe r herein� 7 _,, _ .� -- -� �. -� _ "- O t ' 4 'q Q i _` I 6' Side -� 'i i AdFr lk 1 i Setback CO U f 10' _ � _ _ _ _ tm � _ _ _ - Easement ;:£ (0-1. 1 t ! • ` iy 7"S q$ lJ t i lo ' '" ; • C - 0 Ledger and Lateral Load Connection Details SO4 D Q . t Decking and Flashing U .. _ i 1 Details S05 4) ,....... I 1 1Air la) Ill4iLi!!!!t__ L_I __ illim -----_— ' 'd� 11 . ...."0/11.______,„...4,-----.0 . r—:,1— rii >o r CD �--- REVQ � !!. 2mmn Concrete footing � 09/25/2019 Framing Details $03 0 2 © 09/25/2019 Simpson SO6 SO6 SO6 CPT66Z Post base Guard Rail Details SO6 2ea 1/2x6" Hot Galv anchors per post SO2J C ® n a n n c A 0 D Q U 6x10 Beams Simpson PC6Z Post o Simpson HTP37Z Cap, EPC6Z at ends. Strap each side i of beam at splices. U ` 6x6 Posts 0 L _r 1- 10'9.50" 11 '1 .00,' I� . 11 '1 .00" 10'7.75" Q) Elevation Facing South 5 (PVC flashing over beams/post caps omitted for clarity) 2x8 Joist 16"0C 2 Wall flashing Decking and AI Simpson LUC26Z Hangers S05 Details O Edge Details S05 both ends 8'7.18" - 2 2x8 Ledger O SO4 Details Deck slope t —.7. \ a REV „ p , GENERAL NOTES: 1/4er foot 1 1 &2 Lateral load 1 1 . All lumber to be DFL #2 or better, pressure- o Connection treated for ground contact (PTG). Apply SO4 Details preservative to all cut ends. 4DATE: 2. All connectors and fasteners in contact $�0'28�� 9/25/2019 with PTG lumber to be hot-dip galvanized o0 (hdg)or otherwise certified as acceptable. —-- — Elevation Not applicable to interior connectors and t 1 fasteners in contact with untreated lumber. I 3. Connector fasteners in accordance with Elevation Facing East S03 manufacturer's spec. sheet. (Guard rail and Fascia board omitted for clarity) 14'9.50" 16'1 .50" c (4) 15001b Lateral Load 1'5.50" connections located as A 1 '5.50" -Existing- shown rill1 < L....4 -� _ 0 a I Q) U _� N — N se 1 1.44 E n l— i u—i �� /� i i i 1 Plan View Showing Lateral Load Connections SO4 (Decking and existing flooring omitted for clarity.) A Existing 2x10 Rim 0 2x8 Ledger (4) Simpson A35 Attach to Rim with(2) 1/4x4" angles with #6x1/2 0 1111111111111111 SO4-2 Simpson SDS screws per 16" pan head screws, la � 2x8 Joist SPAX or equal REV I; 11=" ---- 1 SECTION A-A ° ° ° ° ° ° ° 2x10 Fascia (on ends) ° ° ° " / I- ° ° ° °) DATE: (Rotated, Facing East) 9/25/2019 (Not Shown) Galvanized Z flashing j below ledger covered with self-sealing Details flashing that extends up behind ledger. Simpson DTTZ2, 2 1/2x18" hdg all-thread, SO4 Ledger and Lateral Load Connection / nuts and washers SO4 Silicone Caulk Noblesealant 150 between Drip Edge & Membrane 0 O 5/16" Porcelan Ceramic Tile, 12x12" ii PM"M"y`�"` Polymer Modified Thinset Mortar, Approx. 3/16". 1 .5" Stainless Steel izzo®izgarmss®eromr®. wit Need 100% coverage of tile Q Drip Edge !Fr Al� Noble Deck Membrane & 1/16" Thinset Mortar -st— 7/16" Wonderboard Lite Tile Backer Board (CBU) N PVC Flashing 1/8" Polymer Modified Thinset Mortar 0 Extend to below / 23/32" T&G Plywood, Exterior adhesive N beam U 6x10 Beam 1 Decking and Edge Flashing Detail N S05 1— Siding Decking and Flashing Notes: Building paper II N 1 . Screw subfloor to joists, ledger and blocking with #8x1 .625" Extend Membrane Up Wall 2" '1 5 stainless steel decking screws 6" OC. Leave 1/8" gaps between Siding Starter Strip panels. Aluminum Flashing 2. Screw CBU to subfloor with #9x1 .25 Rock-On cement board Is screws screws spaced 6" OC. Stagger seams. Reinforce seams with Silicone caulk 0 I d- alkali resistant fiberglass mesh and fill depressions with thinset mortar. Backer Rod d- 3. Mortar: Custom Building Products Porcelan Tile polymer modifiedi�\����_�"t�_ thinset. r""""" 4. Follow Noble installation instructions for membrane installation. ' e —� REV 5. Tile: Porcelan, low moisture absorption. Use 3/16"wide grout joints. Lay in running bond pattern with 1/2 tile offset. Run continuous joints - -- N/S (across short dimension of deck). Leave 1/4" gap at wall and Illir DATE: 3/16"wide expansion joint every 6-7 rows. Clear mortar from gaps. 9/25/2019 6. Grout: Custom Building Products Prism, color TBD. Remove grout from expansion joints, wall and perimeter (do not puncture Details membrane). 441 7. Caulk: Custom Building Products silicone in same color as grout for expansion joints. Generic clear silicone along wall and around �2� Wall Flashing Detail S05 perimeter. 5�0� 4x4 PIG Post C 0 impson HTT4HDG p Simpson BP5/8 ply Ar / /7 e////////////////// /:/ Q)) o Lateral load, see So47 k, /� ID 0 ` 2x8 Blocking / ��, 1/4' PC Spacer B, 2x10 Fascia E) s � 5/8" all-thread, ,�s5 :see Detail 2-S07 washers, nuts all HDG 1/4' PC Spacer A, Simpson BP5/8 on Y3 Post Support on Ends see Detail 1-S07 Both sides of Top Boit o6 N ir .: , Fortress FE26 Adjustable Railing 5/8-11x1 1 HDG Bolts, �, on Ends, 40" Tall Washers, Nuts Cr) Fortress FE26 Railing Brackets p c1. Post Support Along BeamC-1- 0� Fortress FE26 Traditional Railing O Panel, 40" Tall Simpson HL37HDG Angle • „. � 1/4” PC Spacer C, Detail 3- REV 1/2x3.5 HDG Lag Bolts, ilq z �. Washers , I • S07 1 Railing Notes: 1/2" Vertical offset between 1 . All hardware hot dip galvanized (HDG) ;444,,,i ,i angles for lag bolt clearance DATE: 9/25/2019 or otherwise coated for contact with PTG lumber. i ' ` . 4x4 PTG Post 2. See Fortress and Simpson installation �,. Details instructions for rail and HTT4. 3. Upper bolt/lag 2" below top of supporting member , lower bolt 2" above SO6 Post Support at Corners S06 bottom of beam or joist (not fascia). C N5° .- -. 0.22 -0 1 1 o Q h - U 0 1 i Q 0 a) 0 1 o 0 Cl) 1, 0 I U u' c\i Cl) oa 0 0 o j I OO 0 N O I (-3- O NI0 M 0 N V ' I- O M N N REV L _i 1 V V 1 1 .75 1 .75 1 .75 3.50 _ -. 3.50, j 3.00 9/25/2019 0 Spacer A 2 Spacer B 3 Spacer C Details S07 S07 S07 MATERIAL: 1/4" Lexan Polycarbonate (PC) S07