Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (3)
Irma Dell Butterfield Park Subdivision GeoPacific Project No. 16-4328 GeoPacific observed proof rolls of the street subgrade for the street improvements, as summarized in the attached Field Soil Observation Summary. GeoPacific performed periodic testing of the crushed rock base course. Density test results of base rock indicated density of at least 95 percent of modified Proctor(ASTM D1557) at the locations tested, per project requirements. At the time of this report, asphaltic concrete paving had been placed over the streets completed as part of the project. Test results indicate relative compaction of at least 92 percent of Rice Density at the locations tested for top lifts and at least 91 percent for base lifts, in accordance with project specifications. Density test results are included in the attached Summary of Field Soil Density Tests. FINISHED LOT SURFACES AND STRUCTURE EXCAVATION GUIDELINES Foundation excavations should be carried through any soft fill, organic soil, to competent native soil or silty compacted engineered fill. The depth of excavation for structural foundations should be expected to vary and is generally deepest when constructed during the winter, over sloping ground, and at the back of the lots. Footing-to-slope setbacks should conform to the applicable code or an appropriate alternative setback from the geotechnical engineer. In general, we anticipate that up to 12 inches of excavation will be necessary to reach suitable bearing soils on the lots with engineered fill, with the exception of footings near retaining walls, which may need to be deepened. FOOTING AND ROOF DRAINS If the proposed structures will have a raised floor, and no concrete slab-on-grade floors are used, perimeter footing drains would not be required based on soil conditions encountered at the site and experience with standard local construction practices. Where it is desired to reduce the potential for moist crawl spaces, footing drains should be installed. If concrete slab-on-grade floors are used, perimeter footing drains should be installed as recommended below. Where used, perimeter footing drains should consist of 3 or 4-inch diameter, perforated plastic pipe embedded in a minimum of 1 ft3 per lineal foot of clean, free-draining drain rock. The drain pipe and surrounding drain rock should be wrapped in non-woven geotextile (Mirafi 140N, or approved equivalent) to minimize the potential for clogging and/or ground loss due to piping. Water collected from the footing drains should be directed to the local storm drain system or other suitable outlet. A minimum 0.5 percent fall should be maintained throughout the drain and non- perforated pipe outlet. The footing drains should include clean-outs to allow periodic maintenance and inspection. In our opinion, footing drains may outlet at the curb, or on the back sides of lots where sufficient fall is not available to allow drainage to the street. Construction should include typical measures for controlling subsurface water beneath the homes, including positive crawlspace drainage to an adequate low-point drain exiting the foundation, visqueen covering the exposed ground in the crawlspace, and crawlspace ventilation (foundation vents). The homebuyers should be informed and educated that some slow flowing water in the crawlspaces is considered normal and not necessarily detrimental to the home given these other design elements incorporated into its construction. Appropriate design professionals should be consulted regarding crawlspace ventilation, building material selection and mold prevention issues, which are outside GeoPacific's area of expertise. 2 GEOPACIFIC ENGINEERING, INC. Irma Dell Butterfield Park Subdivision GeoPacific Project No. 16-4328 Down spouts and roof drains should collect roof water in a system separate from the footing drains in order to reduce the potential for clogging. Roof drain water should be directed to an appropriate discharge point well away from structural foundations. Grades should be sloped downward and away from buildings to reduce the potential for ponded water near structures. SPREAD FOUNDATIONS Based on our earthwork observations, native soils are anticipated to be encountered at or near the foundation level of many of the proposed structures except as noted above. These soils are generally stiff to very stiff and should provide adequate support of the structural loads. Shallow, conventional isolated or continuous spread footings may be used to support the proposed most structures provided they are founded on competent reworked native soils, native soils, or engineered fill. We recommend a maximum allowable bearing pressure of 1,500 pounds per square foot(psf) for designing the footings. The recommended maximum allowable bearing pressure may be increased by a factor of 1.33 for short term transient conditions such as wind and seismic loading. All footings should be founded at least 12 inches below the lowest adjacent finished grade. Minimum footing widths should be determined by the project engineer/architect in accordance with applicable design codes. Assuming construction is accomplished as recommended herein, and for the foundation loads anticipated, we estimate total settlement of spread foundations of less than about 1 inch and differential settlement between two adjacent load-bearing components supported on competent soil of less than about% inch. We anticipate that the majority of the estimated settlement will occur during construction, as loads are applied. Wind, earthquakes, and unbalanced earth loads will subject the proposed structure to lateral forces. Lateral forces on a structure will be resisted by a combination of sliding resistance of its base or footing on the underlying soil and passive earth pressure against the buried portions of the structure. For use in design, a coefficient of friction of 0.42 may be assumed along the interface between the base of the footing and subgrade soils. Passive earth pressure for buried portions of structures may be calculated using an equivalent fluid weight of 320 pounds per cubic foot(pcf), assuming footings are cast against dense, natural soils or engineered fill. The recommended coefficient of friction and passive earth pressure values do not include a safety factor. The upper 12 inches of soil should be neglected in passive pressure computations unless it is protected by pavement or slabs on grade. Due to the fine-grained nature of on-site and engineered fill soils, all foundations should incorporate appropriate drainage measures. Crawlspaces should be provided with a low-point drain and pass through pipes should be installed through footings which would otherwise restrict water flow to the low-point drain. Footing excavations should be trimmed neat and the bottom of the excavation should be carefully prepared. Loose or softened soil should be removed from the footing excavation prior to placing reinforcing steel bars. 3 GEOPACIFIC ENGINEERING, INC. Irma Dell Butterfield Park Subdivision GeoPacific Project No. 16-4328 CLOSING AND LIMITATIONS Our conclusions and opinions as to whether the work essentially complies with the project specifications are based on our observations and experience. The conclusions contained herein represent conditions at the date of this report and apply only to our work as described herein. We cannot provide advice, opinions, or conclusions relative to site work that we have not observed. Observations by GeoPacific are performed to determine, in general, if the work is being performed in accordance with applicable geotechnical recommendations. The fact that any particular work has been observed does not waive the contractor's responsibility for the means and methods of construction,job site safety, or to comply with the contract documents. Locations indicated in our field reports are generally based on construction staking placed by others, or information provided by the contractor at the time of our site visit. Surveying of test locations or locations of site improvements, and establishment/verification of line and grade, are beyond the scope of services provided by GeoPacific. Within the limitations of scope, schedule, and budget, GeoPacific executed the scope of services in accordance with generally accepted professional principles and practices in the field of geotechnical engineering at the time the report was prepared. This report was prepared for The LWD, LLC only. We understand that DR Horton is purchasing the project. A consultant to DR Horton is providing their own evaluation of the as-built soil conditions; this is what should be relied upon for their proposed construction. No warranty of site conditions, expressed or implied herein, is offered in this report. We appreciate this opportunity to be of service. Sincerely, GEOPACIFIC ENGINEERING, INC. � ' P130pfissi ,,``� .AGINfi I cc 147.43A r A f if ♦ OREGON / J`4%444 0:')/ A/4 -ES James D. Imbrie, G.E., C.E.G. EXPIRES:06/30120d. Principal Geotechnical Engineer Attachments: Grading Plan Daily Field Reports Density Test Data Sheets 4 GEOPACIFIC ENGINEERING, INC. ,,r •\ \ 4 , ,, , 74.1 GMP LEGEND GRADING LEGEND ,P PI 1 .r0 i,/M rERADINS.ST9EEJ AMC!.fluTY EFOSIO4 AND SEDIMENT MIRO!. ; o g o 4 ' OONSTRUcrati NOTES i ERSIMG COPTMM - 7 VID Mt CON 1,41,S6Nax 0.CONNvar Vt.**N.N.0 CNA*.7 St Or Pt Er ---- FORTS OF 4.00/10® ,04147010 17(11111.6.74.4%7.7.41.770040 Z -,000.41/0.1 PROPOSE,MINTOLR 1 11-- 1- q,....44. -, ..- -- .... --- 10 K7711EC 007.1 AVMS antat NANA.limn 44r4 1411.774117 KAM KR 7.2001.3C KO. IZ §0 AAA."R.-P.- METALL SEEK:NT FENCE(01.OK BRE)0 F P*F0 $ 1114‘,11-...a.,.0.1 ,.0.-- 111.1.„,„.Z. ' B torwar 1,..nt Sit OK ICC 7440/ 0 -,11040,114,m. .5,44.WEE PROTECTOR FENCM0 5 . E73$11NO PR. -0 REMAIN iW C A .r.r. ....-4 7.7.-...,_ ,,„........ I \ , , ., ., ,'4. • ,' ,0,...M..,41004044 EKE'.Al$OM T 0111.0 MO N..KER.KKK 101,:.:04.7.:4,0"..44000,0414„./%1A...07.10„JAKE -1 Itt.EJ.EM w W 010X $14. Nig KT.ORAVia.CONSMOCICH E1111.10E M.01*055)® It X-44,004 nIDOE 444414,Worn ,-o 0 1,10,041 OFC1KOIKTOP OK CK 975 OR 020/CI 0/0 1i 1°0 \ :I 1 1 '•"'Iss, 0 p co< .R. INS,E1.TO EROS e Th \ I \i' ill "'''''t ..4. '' i ',I;"""" 10.7E4 3.13 BEM.NO REOLIC.47-07 KIK, DN,Nm ,2 ,. ' tV4-ritt'l'"..i."If-lt..,51,-"'"'1`,,,t'"u"',,.5Z.P.'1Tr'''''''''''' o 0..o- ..... ...".-FEYS-ONE RAJ- /!-1. • ...I,...I $ ,[7.7„,1 Si.10.ECLIMENT MAINIENAPCE.MK-PORTP-70117 KV SCUD 0E 111\i' FE 1"/,$.:,.$/.4"1‘,$$,/.... 0 , $1' P-FliTH11011.P.C.sr...10i 0044SPRES 74.1.1.....CMCREC COME0 Kt 0/01104 P.A3'10 ..0 s,-... 0 ,1 ' I, 5.570074.41%'T'S01:1$4,1'L"511.700.47'05 71170.11:1.707;"4.770.174%'170'7"11071,000 C07161.0101011 1/3] aNeNETE WK."8 (1,) 1 .,v,,,,t I " -.-- 117-- , ,,,,„ ../ 1 --- -.:".": 0 ,..,,,...,,..CR AII.E$AREK WAIL/A S.W.740.1 TM OM OF 117.440 SEEOTO KC 1- ril __ _„. SCALE r-,,...,,,,r-,.-a--9-17 -me-a7ar'10-,,,,441i, ....t „' 0' ,,...I t , ,.., , „ .,e. CO01130.011437. 0 - ' 471141.ff.1.1 'gtt.4,'.",=1"=.7,41:`I.,"-tArot"Stalt" ul -,„_„, -...., ....._.-.1,4...„. _._....;. 0.1,01110 KAMA.. ' I- Z . 5 CONSTKVION.1104.7 7AL.M.METAL/ED A'ME BiONKC 7 076041011010 MO 0 Z ,./...,1 NKOMO>FOP ME 00.44103N 7.FIKECT.40011704.NEARKSIK.110.BUI NO' W 71'1' 4. -0---.0., 111 A- , F EF 0 '.4.----,..... '1"1 11" 710-0 10.TM 0100907,13.11S.711.ANO KOMAR°RAY I1E.REPARS,TO P.SE 2 "7 5 .7. , 1 ... i 1 , -' MAT AL>1.A..DRE%E.1 CU.FOR DE 0040717 CF 7E1 FIKECT W 0 ,,g,...A ''3,..Z. A AMINE MUM'0 SR.NA.STE,-MS 7441.EE FRCTEC.104007 TNE WE 0,4171,07:1 > re isi_ ---f. 9 -,..0 . , , i /-- ,..,.. ,-- ft," t ----- " I ' PRET PNWECOMI KKK.All OK-FRO..1.0.1145 AM 10 M MOULARLY MEMM40 ,,..1014001.0 AS NECK 0 I'Ll-E ' '0 3KATOURKPE7I0E MRAATWFRIN,CS 7M-13A.1TKAE.OFW=A.MENO'FF-AN9D7=01-E18.,E,E M0.7A1N1M7O0R.K 01 14417-170- CC .tI 0 ,- r-; /) ,, „_„,tt / s ,LI''''2,t II;11.7.ft,14%.1.7-1,-.711%141,`1.1,;,.",,MJA/ e \ . . / ',,. 77-7,0/4.CAE NOT EE CONKRKI$03 PEPPER MAP 30 MOM Kt MOIKK PCINT. MCCNCARV WAS:KS 9.."K E.P3 OR TEMPORARY SEMIK M170 0.0Y SE 400000410 ME ° 0 0 ' / ''"" , •-• ,A.. ,. , ' , ; I '''''''',It t 4/47-04T 7411.....0 1010.PR FEET 7 Ia.ACCESS AK EE CLE.P 00-17 1/ KKK 501 Of.CARROT, ETE 1° p...,16 ; I1F44. . / 0 1111°4,.., "ZNA1VS:E°1'1'S/K7'11%=0.T,I7V77 Ar014,0rCIN 4'T= 1 ..,•1 i ; ( T, , ' 1 c.: 1 01 $.1;4,,,,$437.010 , k , I. 13 40$011 PAVING IN 10S7 70.41..OKI FAKO 7E7017 CI.N R-11-KF KC LIFE EKE/11A. 0 I . EA MEYER. E 1111, 100' ‘ '#,r, ,7 , -Tz. i, , _,-, 0 if 1 cNus.No vs-AR0777-0 PIE.P PON-0,MEN ''14241G AgARGE1'FTLi''''''' • / E '$ 4 4,, 4 1, -.--., '-,. . ‘ • ‘ .... ,..,, .11.. 1 I , i.'. t.„--77, _-...#- _ - -({ , 71) ... ....-1 I; / ,. a- '6, '1 ‘‘, \ EROSION AND SEDIMENT CONTROL BMP IMPLEMENTATION , I .„.„. " ., ; )),,,,,,, ',' aillitiallo, .- .._ ';' '7,.4-t, ..1 , 1 41.1.OKE ESC YEK.KS OM FT PROP7.117.130,110103FR KNEW.70004.CRAM CONAS.C717 IN-RM., NOV BC 04 MACE 74011704.KO KM.SI AN NI. t 1 .\ ..." AMPECTON.OMR,M0.1.1.470 Cr CON.31.717.1773 k if,,,,,7-7,-.....,, 11 -, D I z MI MEDI.'0.14RS;10 NE INSTAL.F.M.NM"7.FE P0114.110191411. .0./ g i „ i. 1101.1.0MN4 E3M9013101.11 CIF 75.OR.AS 7071 ON rNME PLVIS. 3 ECK KV ACRE SIKUERICN 0.9.117.NO.NDNG KKK"7.BE M PIKE C.kJ. ; 11 4 $0,14.E.474$.1,00=14C10.4151,1171-.141 XSOFI1C73 4NO l...13 PR.TO ME MEM i 1 • t, i ) r g SOLIC WASTE ANC HAZARDOUS MATERIALS BMPs ;5 / r $ ,- I • I : Pi . .., .41,,, . 1,,,,, 0 FRNER071-'11Ft'ET1P101X-.1117010,U01;0117 OF?lilt CR OINFR 00417•400.5.17,7 -I , ,$ I r / 007/104 1017.1 7.Kt 071.Ntu.47 40910107 KKK. .1$ A 4 '$ FT/P.1•..!Iiiii.AP EV/* 1 MAN 7.00PEES 7 S014-...1.PRO.07074 FROMMERFS 0 A . / /..... 1 $ ,.11,\AT04400 '1 11.1 11' 1 ltOrit,,IF . at - 04 P e.,. A 1.7440 PPE 0. ''.- --,- ---- 446-40..., , i . - ,,,'* ‘-'1 "114.,.., t', ,, .. - , . THESE EROSION AN:EFORIENT compa.41.40S NSSINE 'Imisitioresse. ismiwriailmik..,10# '''' '1 'eiarwriems WiEL:!",--li cOvSIRUZEON NENSuRES NEED To EE AP,UED DEnNEEN kii:li Z a ....4 , ,....,--. En ER090,1 coNTEM DET40 S REFENEssED NEREDN \ , PEPYRT 11 000 "' 111'0="0.'4WETT'E% '111 0 --+ 11-"ieF1$ "11'4 .1.11: '1-11 1. ..11.''L 'rEEra'1741";71411 Mg Mai ./1 r ,-- i , ,,, rx.,,g-.1.-.1,r, a s ; '/ t. i4," ' : ..: t / .4k 1$ 'WV",I.V.S ki 1111%/1111i c a:41f , I ! 1 , I-72 EuT z r IR..KJ 10 FOR WADING SECIIONS 2.-C&o-D sit SHEET 9 g i r No<go. ' ) t 1 )9 Is, : . 0,01014 00 a hr.tesit pot .46., . i!sIIIt ---g'1 '.1.,,',' , • CC*01:7•441010.0,010 A ,...0.....!..,7'ii.-..., 1.i . , , .0:.tprl,,,..:10,NAMINK ji ...H.)H40' ) 1 H4. 1 I i, , 1 e.'Vs. 1 t I '')"„;"" I, ' irt fa.sti,ON HIL . , 140440,140.4 OWNS-, 1100 5TOCKPLE DMPS 05 , I :I I 1 : ,L,.. ...„ , i ' 11/1 12,L)). ,:,:,..„' ,,-, . E'rf.r10118:ZA.411WX4.«.17. SIM=SOL 1100034-E 4- , 1 RARITAN OLT/THEE 446,45 OW cr , ( Pa 40 0040 DAt 4 , sne.Atcfctrs Dm ern, ;Mt NO 104)11,01VISP I NoNSINa 40441.V$1004041 3 .46 I 1 AA-MOINENT Ma .. / I. ''''''t7re xraIncnox ,2= - * NNMOM!MOIL! 51. , ' i 111.11/ ,_••••E *1 1 01 - - 1505505.5*0055 VirtIAACZ AIIAIA itOPIN.L.terS1400 * 7. / `' nNiivega I ' - c,---2, , .. 4.. GRADING SETBACK DIMENSIONS ,05 26 '. ''''TC I i . ' ; ' \ p. : ...1 1, , I I 450 00P4014)440410*4405,44,44,10-DANN./..- ........_. _.... . . ____ GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax (503) 941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 06/06/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,80°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc) TYPE OF OBSERVATION: Engineered Fill GeoPacific field technician Cody Sheaffer was onsite to observe the compacted fill material on SW Inez Street. I observed compaction with a sheep's foot roller and noticed some pumping of the material. We recommend scraping down and removing the wet material and recompacting the engineered fill. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport©gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer GeoPacific Engineenng,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation•Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 06/07/2017 PROJECT NUMBER WEATHER "' 16-4328 Sunny,70°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE 1 of 1 Inspection Notes. (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Engineered Fill GeoPacific field technician Cody Sheaffer was onsite to observe the compacted fill material on SW Inez Street. observed compaction with a sheep's foot roller and still noticed minor pumping issues. Valley Pacific will place a lift on the areas where no pumping was present. Approved areas observed were in compliance with project specifications. .. ,µ,it .. .tee _ .. d y . .vor -, . _. .5.e. i t $4 ' �� * „ DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport@gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents This information contained herein should be considered preliminary until review by the project engineer GeoPacnc Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 6/22/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,80 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# - T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST LAB ID (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL RF SW Inez Street—Westbound Lane -1 17.8 122.6 104.1 104.2 95 99.9 18,5 P17-090 P STA 15+00 RF SW Inez Street Eastbound Lane -1 16.5 123.0 105.6 104.2 95 100+ 18 5 P17-090 P STA 15+75 RF SW Inez Street Eastbound Lane -1 15 3 121.0 104.9 104.2 95 100+ 18,5 P17-090 P STA 16+15 RF SW Inez Street—Westbound Lane -1 15.0 123.5 107.4 104.2 95 100+ 18.5 P17-090 P STA 17+00 RF SW Inez Street—Eastbound Lane -1 13.2 114.5 101.1 104.2 95 97 8 18 5 P17-090 P STA 16+70 RF SW 88th Avenue—Center STA 14+00 -1 13.7 119.2 104.8 104.2 95 100+ 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW= Retaining Wall Backfill PS= Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on SW Inez Street. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 6/26/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST LAB ID (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL RF SW Inez Street—Eastbound Lane FG 16.5 116.2 99.7 104.2 95 95.7 18.5 P17-090 P STA 15+10 RF SW Inez Street—Westbound Lane FG 17 8 117 1 99.4 104.2 95 95.4 18 5 P17-090 P STA 15+50 RF SW Inez Street—Westbound Lane FG 15.5 129 1 111.8 104.2 95 100+ 18.5 P17-090 P STA 16+25 RF SW 88th—Northbound Lane STA FG 18.1 126.8 107.4 104.2 95 100+ 18.5 P17-090 P 14+25 RF SW 88th—Southbound Lane STA FG 16 7 124.2 106.4 104.2 95 100+ 18.5 P17-090 P 13+75 LF Lot 6—West Central Area FG 16.3 115,2 99.1 104.2 95 95.1 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: mm GeoPacific was onsite to conduct nuclear density testing of a one foot lift on SW Inez Street, SW 88th and Lot 6. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River'/d"-0" 6/27/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,75 CLIENT NUCLEAR GAUGE SERIAL* CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX.DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FD MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL BC Tract 5 East Face Ultrablock Wall_ FG 7.5 142 3 132.4 134.1 95 98.7 10.6 P17-031 P South Half BC Tract 5 East Face Ultrablock Wall— FG 7.9 144 6 134.0 134.1 95 99.9 10.6 P17-031 P North Half TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of base rock for the east face of the Ultrablock wall located in tract 5 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503) 941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 6/28/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,60s CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-99 1 of 1 TEST PASS TEST LOCATION ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM TYPE (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL LF Lot 5—SW Area of 3• 14 4 116.4 101.8 104.2 95 97.7 18.5 P17-090 P LF Lot 3—SW Area of 4• 16.7 116.1 99.4 104.2 95 95.4 18.5 P17-090 P LF Lot 1 —SW Area of 4• 17.9 122 7 104.0 104.2 95 99.8 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on lots 1 through 5. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72"d Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax (503) 941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 06/29(2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE iF 1 of 1 Inspection Notes: (Include location,testing data.substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Retaining Wall Subgrade GeoPacific field technician Cody Sheaffer was onsite to observe finished grade compaction on lot 6, as well as subgrade for the retaining wall on Tract A. Compaction testing met project specifications and the subgrade for the west face was a stiff sandy silt. The areas mentioned are suitable for further construction. Please see attached density testing sheet. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport@gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents This information contained herein should be considered preliminary until review by the project engineer. GeoPacltic Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503) 941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 6/29/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70s CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST LAB ID (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL LF Lot 6—NW Area FG 19.5 122.1 102.2 104.2 95 98.1 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on lot 6. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 6/30/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70s CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR % WET DRY (PCF % % % FAIL LF Lot 4—NW Area of 3 16,8 120.4 103.1 104.2 95 98.9 18.5 P17-090 P LF Lot 2—SE Area of 4 19.0 127 6 107.3 104.2 95 100+ 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on lots 2 and 4 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503) 941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 07/05/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,80°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Retaining Wall Subgrade GeoPacific field technician Cody Sheaffer was onsite to observe subgrade for a section of the UltraBlock Wall on Tract A as well as compaction testing for a lift on lots 1 through 5. Upon arrival,there was standing water on the southwest corner of the wall. Probing efforts yielded medium stiff soil and Valley Pacific was instructed to over excavate the area 6"to more competent soil. This soft area was from the southwest corner of the wall to 20' north.The ultrablock wall and lots 1-5 were generally being constructed in accordance with project specifications. Please see density testing sheet. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport©gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. G Pacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503) 941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River'/."-0" 07/06/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,80 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL RW Tract 5 North Face Ultrablock Wall— +2 9.1 143.6 131.6 134.1 95 98.1 10.6 P17-031 P East Half RW Tract 5 North Face Ultrablock Wall— +2 8.5 146 5 135.0 134.1 95 100+ 10.6 P17-031 P West Half RW Tract 5 West Face Ultrablock Wall— +2 9.8 145.1 132.1 134.1 95 98.5 10.6 P17-031 P North Half TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River%"-0" 07/07/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,70 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- 1-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL RW Tract 5 North Face Ultrablock Wall— +4 9.8 141.6 129.0 134.1 95 96.2 10.6 P17-031 P East Half RW Tract 5 North Face Ultrablock Wall +4 9.6 140.5 128.2 134.1 95 95.6 10.6 P17-031 P West Half RW Tract 5 West Face Ultrablock Wall— +4 9.4 140.1 128.1 134.1 95 95.5 10.6 P17-031 P North Half TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW= Retaining Wall Backfill PS=Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River'/d"-0" 07/08/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,80 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TEST LOCATION LAB ID TYPE (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL RW Tract 5 West Face Ultrablock Wall +2 9.3 139.7 127.8 134.1 95 95.3 10.6 P17-031 P South Half ST Tract B Central Sanitary FG 11.3 143.3 128.8 134.1 95 96.0 10 6 P17-031 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5 and a Sanitary trench in Tract B. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax (503) 941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 07/10/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Retaining Wall Subgrade GeoPacific field technician Cody Sheaffer was onsite to test trench compaction for the water trench in SW Inez Street. Upon arrival,the water truck was malfunctioning, and Valley Pacific was not able to water the%"-O". I was instructed to return tomorrow 7/11 to test rock compaction. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport@gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 07/11/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70s CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR % WET DRY (PCF % % % FAIL LF Lot 1 —NW Area of 4 16 2 120.5 103.7 104.2 95 99 5 18.5 P17-090 P LF Lot 3—NE Area of 4 16.1 119 4 102.8 104.2 95 98.7 18 5 P17-090 P LF Lot 5—NW Area of 4 16.6 119.3 102.3 104.2 95 98.2 18 5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on lots 1, 3, and 5 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. i GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River W-0" 07/12/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,75 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# - T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL RW Tract 5 West Face Ultrablock Wall +4 10.2 142.5 129.3 _134.1 95 96.4 10.6 P17-031 P South Half DT Lateral on SW Inez-STA 16+20 FG 8.9 143.5 131,8 134.1 95 98.3 10 6 P17-031 P DT Lateral on SW 88th STA 14+30 FG 9.4 140.9 128.8 134.1 95 96.0 10.6 P17-031 P WT SW Inez-STA 15+70 10.4 145.3 131.6 95 98.1 10.6 P17-031 WT SW Inez-STA 15+10 7.2 139.9 130.5 134.1 95 97 3 10 6 P17-031 P WT SW Inez_STA 14+90 5.5 138.2 131.0 134.1 95 97.7 10.6 P17-031 P WT SW Inez-STA 14+300 10.1 143.7 130.5 134.1 95 97.3 10.6 P17-031 P WT SW 89"-STA 10+75 10.3 145.6 132.0 134.1 95 98.4 10.6 P17-031 P WT SW 88th-STA 14+00 11.5 148 3 133.0 134.1 95 99.2 10 6 P17-031 P WT SW 88th-STA 13+00 10.2 145.2 131.8 134.1 95 98.3 10.6 P17-031 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5 and a Water trench on SW Inez. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt 07/17/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,80s CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-99 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL LF Lot 1 -Central Area of 4 15 9 116.0 100.1 104.2 95 96.1 18 5 P17-090 P LF Lot 2—Central Area of 4 15.6 115.7 100.1 104.2 95 96.1 18 5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW= Retaining Wall Backfill PS=Pavement Subgrade BC= Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of a one foot lift on lots 1 and 2 Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacitic Ennineerinu.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax (503)941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 07/21/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,75°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes. (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Proof Roll GeoPacific field technician Cody Sheaffer was onsite observe a proof roll on SW Inez Street and SW 88th Avenue. Some soft areas were identified. Valley Pacific dug test pits in soft locations and a steel probe was used to determine soil consistency. SW Inez Street • South Curb STA 16+50-16+90, 16+00-16+15 (6" over-x) • Center Lane STA 15+95-16+05 (6"over-x) • North Curb STA 15+15-15+60 (6"over-x) • North Curb to Water Trench STA 16+20-16+80(2-foot over-x) SW 88th Avenue • West Curb to 20'east STA 13+75-14+75 (2-foot over-x) • East Curb STA 13+30-14+25 (1-foot over-x) The Road area not stated in the above section showed little to no deflection under a fully loaded water truck. The soil appeared to be approximately optimum moisture content, and once the soft areas are amended, are suitable for further construction. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport@gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. Georacrtic Ennineednn.lac. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503) 941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 07/2412017 PROJECT NUMBER WEATHER 16-4328 Sunny,75°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Proof Roll GeoPacific field technician Cody Sheaffer was onsite observe subgrade of the soft areas found during the proof roll on July 21st.Valley Pacific has removed 2 feet from all the areas in question. A geotextile fabric and 3"-0 rock has been added up to subgrade and will need to be compacted in an effort to amend soft areas. A proof roll will be performed tomorrow, July 25th. DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport@gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents This information contained herein should be considered preliminary until review by the project engineer. G o acific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel (503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DAILY FIELD REPORT PROJECT — DATE Irma Dell Butterfield Park 07/25/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,82°F CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes: (Include location,testing data.substitutions/deviations,materials,and methods of construction,conformance statement,etc.) TYPE OF OBSERVATION: Proof Roll GeoPacific field technician Cody Sheaffer was onsite observe a proof roll on SW 88th Avenue on the areas that were over-excavated 2 feet and backfilled with rock. The area showed little to no signs of deflection, no rutting, and appeared to be at optimum moisture of the rock. This road is generally being constructed in accordance with project specifications SW 88th Avenue • West Curb to 20' east STA 13+75-14+75 • East Curb STA 13+30-14+25 _ om,, �}c DISTRIBUTION LIST: OBSERVED BY: C. Sheaffer Adeharpport©gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents This information contained herein should be considered preliminary until review by the project engineer GeoPacific Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72"d Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DAILY FIELD REPORT PROJECT DATE Irma Dell Butterfield Park 07/26/2017 PROJECT NUMBER WEATHER 16-4328 Sunny,70s CLIENT CONTRACTOR LWD, LLC Valley Pacific PERMIT NUMBER PAGE# 1 of 1 Inspection Notes: (Include location,testing data,substitutions/deviations,materials,and methods of construction,conformance statement,etc,) TYPE OF OBSERVATION: Proof Roll GeoPacific field technician Eric Merritt was onsite observe a subgrade proof roll on SW Inez Street. The areas proof rolled included soft spots that were identified during the proof roll on July 21,2017 (listed below). The soft spots were fixed by excavating the soft soil and backfilling with compacted granular fill. A full water truck was used as the proof roll vehicle and no deflections were observed beneath the weight of the truck. Cardno Engineering and the City of Tigard were also on site for the proof roll. Based on my observations,the subgrade soft spots were adequately fixed and the street is suitable for further construction. SW Inez Street • South Curb STA 16+50-16+90, 16+00-16+15 (6"over-x) • Center Lane STA 15+95-16+05 (6"over-x) • North Curb STA 15+15-15+60 (6" over-x) • North Curb to Water Trench STA 16+20-16+80 (2-foot over-x) DISTRIBUTION LIST: OBSERVED BY: Eric Merritt Adeharpport©gmail.com REVIEWED BY: GeoPacific Engineering, Inc. Signature Information contained herein pertains to materials tested/inspected only The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River%"-0" 08/7/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,82 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST LAB ID (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL RW Tract 5 SW Area Ultrablock Wall +4 9.5 140.5 128.3 134.1 95 95.7 10.6 P17-031 P South Corner RW Tract 5 South Face Ultrablock Wall +2 10.4 141.2 127.9 134.1 95 95.4 10.6 P17-031 P South Half TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer * REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPaciftc Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Knife River'/d'-0" 08/8/2017 PROJECT NUMBER P17-031 WEATHER 16-4328 Sunny,83 CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD,LLC 35472 Valley Pacific PERMIT NUMBER METHOD OF TEST PAGE# -- T-180 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FD MOIST LAB ID (PCF) DENSITY SPEC RESULT MOISTURE OR WET DRY (PCF % % % FAIL RW Tract 5 SW Area Ultrablock Wall~ +6 7.8 139.6 129.5 134.1 95 96.6 10.6 P17-031 P South Corner RW Tract 5 South Face Ultrablock Wall ~ +4 8.3 140.0 129.3 134,1 95 96.4 10.6 P17-031 P South Half TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS=Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPaciflc was onsite to conduct nuclear density testing of backfill for the of the Ultrablock wall located in tract 5. Test results MET project specifications for compaction at the locations tested. TESTED BY: Cody Sheaffer j REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacilic Engineering.inc. Real-World Geotechnical Solutions 14835 SW 72"d Avenue Tel(503)598-8445 Investigation•Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 ASPHALT DENSITY TEST DATA SHEET PROJECT MATERIAL DESCRIPTION DATE Irma Dell Butterfield Park Knife River Coffee Lake'/2"-0" 9-21-17 JOB# WEATHER 16-4328 Sunny 80's CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC. 69088 Brix PERMIT NUMBER METHOD OF TEST ' PAGE# - Indirect 3 of 3 TEST RICE DENSITY WET DENSITY COMP COMP PASS Na TEST LOCATION LIFT LAB ID (PCF) (PCF) RESULT SPEC OR % FAIL 25 SW Inez St North Panel—STA 14+50 TopPlant 150.9 139.3 92.3 92 P Rice 26 SW Inez St North Panel—STA 15+50 TopPlant 150.9 142.9 94 7 92 P Rice 27 SW Inez St North Panel—STA 16+50 TopPlant 150.9 139.7 92.6 92 P Rice 28 SW Inez St North Panel—STA 17+50 TopPlant 150.9 139.5 92.5 92 P Rice 29 SW Inez St North Taper—STA 18+50 Top Plant 150.9 140.2 92.9 92 P Rice 30 SW Inez St South Panel—STA 14+50 Top Plant 150.9 140.9 93.4 92 P Rice 31 SW Inez St South Panel—STA 15+50 Top Plant 150 9 139.4 92.4 92 P Rice 32 SW Inez St South Panel —STA 16+50 TopPlant 150.9 139.1 92.2 92 P Rice 33 SW Inez St South Panel —STA 17+50 Top Plant 150.9 139.6 92.5 92 P Rice 34 SW Inez St South Panel —STA 18+00 Top Plant 150.9 139.3 92 3 92 P Rice TEST TYPE: BASE=Base Lift Top=Top Lift REMARKS: GeoPacific was onsite to conduct nuclear density testing of Asphalt. Test results MET project specifications for compaction at the locations tested. TESTED BY: Tyler Imbrie REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. GeoPacific Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72' Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland,Oregon 97224 Fax(503)941-9281 ASPHALT DENSITY TEST DATA SHEET PROJECT MATERIAL DESCRIPTION DATE Irma Dell Butterfield Park Knife River Coffee Lake Y"-0" 9-21-17 JOB# WEATHER 16-4328 Sunny 80's CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC. 69088 Brix PERMIT NUMBER METHOD OF TEST PAGE# - Indirect 1 of 3 TEST RICE DENSITY WET DENSITY COMP COMP PASS Na TEST LOCATION LIFT LAB ID (PCF) (PCF) RESULT SPEC OR % % FAIL 1 SW 88th Ave West Panel-STA 10+50 Base Plant 150.9 140.6 93 2 91 P Rice 2 SW 88th Ave East Panel-STA 10+50 Base Plant 150.9 139.5 92.4 91 P Rice 3 SW 88th Ave West Panel-STA 14+00 Base Plant 150.9 137.7 91.3 91 P Rice 4 SW 88th Ave East Panel-STA 14+00 Base Plant 150.9 139.3 92.3 91 P Rice 5 SW 88th Ave West Panel -STA 13+00 Base Plant 150.9 142.0 94.1 91 P Rice 6 SW 88th Ave East Panel-STA 13+00 Base Plant 150.9 139.5 92.4 91 P Rice 7 SW Inez St North Panel-STA 14+50 Base Plant 150.9 137.6 91.2 91 P Rice 8 SW Inez St North Panel-STA 15+50 Base Plant 150.9 139.8 92.6 91 P Rice 9 SW Inez St North Panel-STA 16+50 Base Plant 150.9 143.2 94.9 91 P Rice 10 SW Inez St North Panel-STA 17+50 Base Plant 150.9 138.4 91.7 91 P Rice 11 SW Inez St North Taper-STA 18+50 Base Plant 150.9 139.7 92.6 91 P Rice 12 SW Inez St South Panel -STA 14+50 Base Plant 150.9 137.5 91.1 91 P Rice TEST TYPE: BASE=Base Lift Top=Top Lift REMARKS: GeoPacific was onsite to conduct nuclear density testing of Asphalt. Test results MET project specifications for compaction at the locations tested. TESTED BY:Tyler Imbrie REVIEWED BY: ~� Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. • GeoPacitic Engineering,Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 ASPHALT DENSITY TEST DATA SHEET PROJECT MATERIAL DESCRIPTION DATE Irma Dell Butterfield Park Knife River Coffee Lake'h"-0" 9-21-17 JOB# WEATHER 16-4328 Sunny 80's CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC. 69088 Brix PERMIT NUMBER METHOD OF TEST PAGE# - Indirect 2 of 3 TEST RICE DENSITY WET DENSITY COMP COMP PASS No TEST LOCATION LIFT LAB ID (PCF) (PCF) RESULT SPEC OR % % FAIL 13 SW Inez St South Panel -STA 15+50 Base Plant 150.9 137.6 91,2 91 P Rice 14 SW Inez St South Panel -STA 16+50 Base Plant 150.9 140.9 93 4 91 P Rice 15 SW Inez St South Panel-STA 17+50 Base Plant 150.9 140.4 93.1 91 P Rice 16 SW Inez St South Panel -STA 18+00 Base Plant 150.9 140.4 93.1 91 P Rice 17 Private Road-STA 0+35 Top Plant 150.9 139.4 92.4 92 P Rice 18 Private Road-STA 1+20 Top Plant 150,9 139.8 92.6 92 P Rice 19 SW 88 Ave West Panel-STA 10+50 TopPlant 150.9 140.2 92.9 92 P to Rice 20 SW 88th Ave East Panel-STA 10+50 Top Plant 150.9 138.8 92.0 92 P Rice 21 SW 88th Ave West Panel-STA 14+00 Top Plant 150.9 139.9 92.7 92 P Rice 22 SW 88 Ave East Panel-STA 14+00 TopPlant 150.9 139.5 92.5 92 P m Rice 23 SW 88thAve West Panel-STA 13+00 TopPlant 150.9 140.0 92.8 92 P Rice 24 SW 88 Ave East Panel-STA 13+00 TopPlant 150.9 139 7 92.6 92 P to Rice TEST TYPE: BASE=Base Lift Top=Top Lift REMARKS: GeoPacific was onsite to conduct nuclear density testing of Asphalt. Test results MET project specifications for compaction at the locations tested. TESTED BY: Tyler Imbrie REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer GeoPaclfic Engineering.Inc. Real-World Geotechnical Solutions 14835 SW 72nd Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 ASPHALT DENSITY TEST DATA SHEET PROJECT MATERIAL DESCRIPTION DATE Irma Dell Butterfield Park Knife River Coffee Lake 1/2"-0" 9-21-17 JOB# WEATHER 16-4328 Sunny 80's CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC. 69088 Brix PERMIT NUMBER METHOD OF TEST PAGE# - Indirect 3 of 3 TEST RICE DENSITY WET DENSITY COMP COMP PASS No TEST LOCATION LIFT LAB ID (PCF) (PCF) RESULT SPEC OR % % FAIL 25 SW Inez St North Panel-STA 14+50 TopPlant 150.9 139.3 92.3 92 P Rice 26 SW Inez St North Panel-STA 15+50 TopPlant 150.9 142.9 94.7 92 P Rice 27 SW Inez St North Panel-STA 16+50 Top Plant 150 9 139.7 92.6 92 P Rice 28 SW Inez St North Panel-STA 17+50 To Plant 150.9 139.5 92,5 92 P Top Rice 29 SW Inez St North Taper -STA 18+50 Top Plant 150.9 140.2 92.9 92 P Rice 30 SW Inez St South Panel-STA 14+50 TopPlant 150.9 140.9 93.4 92 P Rice 31 SW Inez St South Panel -STA 15+50 To Plant 150.9 139.4 92.4 92 P Top Rice 32 SW Inez St South Panel-STA 16+50 TopPlant 150.9 139.1 92.2 92 P Rice 33 SW Inez St South Panel-STA 17+50 TopPlant 150.9 139.6 92.5 92 P Rice 34 SW Inez St South Panel--STA 18+00 To Plant 150.9 139.3 92.3 92 P p Rice TEST TYPE: BASE=Base Lift Top=Top Lift REMARKS: GeoPacific was onsite to conduct nuclear density testing of Asphalt. Test results MET project specifications for compaction at the locations tested. TESTED BY:Tyler Imbrie REVIEWED BY: Information contained herein pertains to materials tested/inspected only. The fact that any particular work has been observed or tested does not waive the contractors responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer. • GeoPacific Engineering.lnc. Real-World Geotechnical Solutions 14835 SW 72' Avenue Tel(503)598-8445 Investigation• Design•Construction Support Portland, Oregon 97224 Fax(503)941-9281 DENSITY TEST DATA SHEET PROJECT SOIL DESCRIPTION DATE Irma Dell Butterfield Park Native Silt P17-090 10-6-17 PROJECT NUMBER WEATHER 16-4328 Sunny 70's CLIENT NUCLEAR GAUGE SERIAL# CONTRACTOR LWD, LLC. 69088 - PERMIT NUMBER METHOD OF TEST PAGE# T-99 Direct 1 of 1 TEST ELEV FIELD FIELD DENSITY MAX DRY COMP COMP OPTIMUM PASS TYPE TEST LOCATION (FT) MOIST (PCF) DENSITY SPEC RESULT MOISTURE LAB ID OR WET DRY (PCF % % % FAIL LF West side of Lot 4 FG 9.2 113.5 103.9 104.2 95 99.7 18.5 P17-090 P LF East side of Lot 4 FG 7.6 110.2 102.4 104.2 95 98.3 18.5 P17-090 P TEST TYPE: LF=Lot Fill SF=Structural Fill ST=Sanitary Trench DT=Storm Trench WT=Water Trench RF=Roadway Fill RW=Retaining Wall Backfill PS= Pavement Subgrade BC=Base Course FT=Franchise Trench REMARKS: GeoPacific was onsite to conduct nuclear density testing of lot fills. Test results met project specifications for compaction at the locations tested. TESTED BY: Tyler Imbrie REVIEWED BY: Information contained herein pertains to materials tested/inspected only The tact that any particular work has been observed or tested does not waive the contractor's responsibility for the means and methods of construction,job site safety,or to comply with the contract documents. This information contained herein should be considered preliminary until review by the project engineer.