Loading...
Plans (2) ( 0) Lr Mechanical General Notes: /�Qj I �' } NN 1. Cooling equipment does not exceed the load of the calculated requirement. lE,~� 2. All steel ducting will be 26 ga minimum galvanized. Flex per Mfg. / ��14 'OA"- 3. Heating and cooling ducting to be designed to not exceed 0.5 wc positive (supply)and 0.5 wc �v negative(return). ey 4. Provide programmable thermostat. 5 degree deadband minimum. 7 day. Microprocessor. Set �� program for night energy savings. 5. Seal ducting with UL listed mastic or mastic tape. �� ri .-- 6. Fan motor does not exceed allowable,first available above BHP. t ( / 7. Max leakage rate of OSA or exhaust dampers to be 4 cfm/sft @ 1.0 sp. 8. Provide 0 and M to building owner. .1— -7 , t RECEIVE® .- �_ _iI I 1 SEP 18 2019 I CITY OF TIGARD — �0 BUILDING DIVISION / P / 1 I n '''''TT%.''N''.s-.\ . ki.1 M (ir , \ 1 ‘H)- °C 4 W `f, �� v �° �rt — = CITY OF TIGA.RD M �� �- �� 1.4 s r4 E FOR CODE COMPLIANCE N , , ......) i c co c" )TC: _ I j ., 0 o 4�. N'ti �'V `Sl ' rmlt#sP ®151- o 0C,--)0 / I < <'N FLI) (Q �o tddress: L I.<'cam„ 7 7" D Ql v 4 in co / l co,, A (IJ) _÷� Date: c,�.,c- 1 q •- tt (7 cr. ► `\ „4(/ 1/ Scope of Work tel "` qo L._ Oregon Heating and Air Conditioning will perform the following scope of work: ‘•-.° �,-O> , 1. Provide and install (1) new packaged heat pump to replace existing heat pump. 2. Provide (6) ceiling mount exhaust fans. , (,...\\A\ \4di" 3. Ducting and air distribution as drawn. Ventilation Requirements- based on 2014 OMSC table 403.3 Equipment Schedule HP1-. Bryant 607CNXC42000- 3.5 ton, 7).08/1/60, 96/107 MCA, 100/110 MOCP. 42,000 HP1 single zone Patient room Btu cooling, 14.1 seer. 15 KW strip heat. Manual OSA damper. On Ground. 1400 sft breathable zone Persons-25 cfm X 10p/1400sft= 350 cfm VALIDITY OF PERMITEF1- Nutone AEN80- 75 cfm @ 0.25sp. on timer. Area-0.12 cfm/sft= 168 cfm THE ISSUANCE OF A PERMIT EF2- Nutone AEN110- 90 cfm @ 0.25sp. on timer. Vbz =350 cfm BASED ON CONSTRUCTION EF3- Panasonic FV 20VQ3- 190 cfm @0.25sp. on stat. Ez =0.7(supply and floor return) DOCUMENTS AND OTHER M 1 Voz= 500 cfm YY DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM RTU3- REQUIRING THE CORRECTION SA= 1400 cfm OF ERRORS.OSSC 105.4 RA= 900 cfm OHAC OSA= 500 cfm CCB # 137653