Loading...
Specifications (4) 'ni-C1-24(q-00353 913(-1 SW INIndsweri- ft eSHERMAN ENGINEERING A 3151 NE SANDY BLVD.,Sure 100 PORTLAND,OR 97232 INC -1 - PHONE (503) 230-8876 -11,--ir SHERMANENGINEERS.COM Structural Calculations RECEIVED July 24, 2019 SEP 4 2019 CITY OF TIGARD Moreland Plan BUILDING DIVISION enlU PriCr'es, Lot 6, Canyon Court c. ‘" At. Tigard, OR A VI V v&O Prepared For: On 'io -4'P SHEC*1‘ Suntel Design, Inc. 16865 Boones Ferry Rd. EXPIRES. 6/30/2 Lake Oswego, OR 97035 Subject Sheet No. Lateral: Loading LL1-LL3 Shearwalls LL4 Overturning LL5 MORELAND PLAN Lateral Load LL I 7/24/19 1 Loading 2014 055C 1.1 Wind: Per ASCE 7-1 Basic Wind Speed= 120 Kzt = I.00 Exposure Category= B 11 = I.00 Building Height= 18.5 I = I.00 Roof Slope= 4 :12 = 18.4° Zone Pressure ASD LC ASD Pressure A 30.7 0.6 = 18.4 B -8.7 0.6 = -5.2 Use 5 psf at roof for MWFRS C 20.5 0.6 = 12.3 D -4.9 0.6 = -2.9 Use 5 psf at roof for MWFRS • End Zone Distance: Eave Ht(ft) 18.5 x 40% = 7.4 ft Bldg Width(ft) 28 x 10% = 2.8 ft Width x4%= 1.I ft Bldg Length(ft) 40 x 10% = 4.0 ft Length-x49% I.6 ft Minimum = 2.8 ft Edge Strip= 3.0 ft (End Zone=2x Edge Strip) End Zone= 6.0 ft ............................ ................ . 1.2 Seismic: Per 2014 OSSC Use Group= I Number of Stories= 2 <3 Simplified analysis per ASCE 7-10 Sds = 0.7 R = 6.5 V = I - 5d, W = 0.140 W Roof W = 1 5.0 1 100 = 1 6.5 Walls = 8 8.0 ft I/2 136 = 4.4 Partitions = 6 8.0 ft I/2 88 = 2.I 23.0 x 18 = 413 Floor W = 1 5 1 008 = 1 5.1 Walls = 8 9.0 ft 1/2 128 + 4.4 = 9.0 Partitions = 6 9.0 ft I/2 40 + 2.1 = 3.2 yu 27.3 x 10 = 273 50.2 686 X 0.140 7:0 = Base Shear Distribution: 7.0 QRt = 686 X 413 = 4.4 = 3.0 °Fir 686 X 273 = 2.8 = 2.0 LL-Moreland-Canyou Courtxls _ SHERMAN ENGINEERING, INC. , 3151 NE Sandy Blvd Suite 100 Portland, OR 97232 WIND LOAD 2014 IBC/OSSC JOB: MORELAND PLAN Loading: SIDE/SIDE V1 V2 V3 V4 Roof Wall End Zone = 5 psf 18.4 psf Interior= 5 psf 12.3 psf End Zone I. I Interior 1 'v End Zone End Zone Length = 6 ft Roof Ht. 6 ft Diaph 1 width 40 ft Wall Ht. 8 ft Qn Qn Qn Diaph 2 width 40 ft Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q ROOF width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 5 6 6 40 5 34 6 40 0.6 X Inter 5 6 0 40 5 0 6 40 5 34 0 40 5 6 0 40 0.0 2 End Right 5 34 6 40 5 6 6 40 0.6 Shear V1 V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q UPR FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 18.4 6 4 40 12.3 34 4 _ 40 1.1 X Inter 18.4 6 0 40 12.3 _ 34 0 40 12.3 34 0 40 18.4 6 0 40 0.0 2 End Right 12.3 34 4 40 18.4 6 4 40 1.1 TOTAL UPPER FLOOR LOAD LINE ROOF UPR FLR TOTAL 1 0.6 1.1 1.7 • X 0.0 0.0 0.0 2 0.6 1.1 1.7 3.4 N SHERMAN ENGINEERING, INC. 3151 NE Sandy Blvd . Suite 100 Portland, OR 97232 MAIN FLR Roof Wall End Zone= 5 psf 18.4 psf Interior= 5 psf 12.3 psf Wall Ht. 9 ft Diaph 1 width 36 ft Diaph 2 width 36 ft Shear - VI V2 V3 V4 REACTION Line Condition load trib trib total load trib trib total load trib trib total load trib trib total Q MAIN FLR width height width width height width width height width width height width psf ft ft ft psf ft ft ft psf ft ft ft psf ft ft ft kips 1 End Left 18.4 6 9 36 12.3 30 9 36 2.3 X Inter 18.4 6 0 36 12.3 30 0 36 12.3 30 0 36 18.4 6 0 36 0.0 2 End Right 12.3 30 9 36 18.4 6 9 36 2.3 ---1.6 F----N RooF CJI Pte; a = c o ) 4 _ . ur2F, e 3 -)2 \/2 11-764. ( 0'`) 76712 \ 42 O25) 0 - r-zLo,* e1 Apo (2101`")2 OVERTURNING - FRONT BACK PROJECT LL ` 7/24/2019 GRID SHEAR DEAD DEAD DEAD LOAD LOAD NET LINE LEVEL LENGTH SHEAR/FT HEIGHT TRIG LOAD M,resist REDUCTION M,ot ABOVE UPLIFT . LINE 2 V-2 3 0.142 8 4 15 0.56 WIND 3.4 0.00 I .02 Use MSTA36 V-1 1.83 0.775 6.25 7 15 0.26 WIND 8.9 0.00 4.76 Use HDUB LINE 2 V-2 3 0.125 8 4 15 0.56 SEISMIC 3.0 0.00 0.89 Use MSTA36 V-1 1.83 0.484 6.25 7 15 0.26 SEISMIC 5.5 0.00 2.94 Use STHD 14 7 I OT-Moreland-Canyon Court.xls