Loading...
Permit Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Description is. Each. Total ti- Fee for all residential systems combined: $75.00 Renewable electrical energy systems: 2 Check Type of Work Involved: 5 kva or less I00,70 5.01 to 15 kva 133.56 2 0 Audio and Stereo Systems* 15.01 to25 kva 200.34 2 Wind generation systems in excess of 25 kva: Burglar Alarm 25,01 to 50 kva 301,04 2 50.01 to 100 kva 552,26 2 ® Garage Door Opener* Ino kva(fez in accordance with OAR 918-309-0040) 552,26 2 ® Heating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 • Vacuum Systems* >100 kva-no additional charge 02) 3 Each additional inspection over allowable in any of the above: 0 Each additional inspection is Other: 66,25/hr 1 charged at an hourly(1 hr mint Inspections for which no fee is 90,00.hr specilically listed(Yi hr min) COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Fee for each commercial system: $75.00 Subtotal r nr r to1' ge 1): (SEE OAR 918-309-0000) un erot i,,spectians�li�,etil pep r;rn. Check Type of Work Involved: ❑ Audio and Stereo Systems n Boiler Controls n Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation • HVAC ❑ Instrumentation n Intercom and Paging Systems O Landscape Irrigation Control* 111 Medical LI Nurse Calls ;❑ Outdoor Landscape Lighting* n Protective Signaling n Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations E?.L uikt g:Pa nr;istfi t•:'. Penr:ilAppF€..Ri t'.=..dec ROY 06/17;2015 Building Permit Submittal Original Submittal Date: g102-elf Site Plans: # Building Plans: Building Permit#: i - nter building permit#above. Workflow Routing: Planning Engineering rmit Coordinator Building Workflow Sign-off: ► Sign-off for Planning(include notes rom planning review) Route Application Documents: ►; Engineering: (1) copy of permit application, (1) site plan, (1) building plan and original plan review routing form. Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: IF / By Permit Technician: I I/� ____ Date. E neering Review rlDelope at building pad: 04 [Mr^ Conditions "Met"prior to issuance of building permit EV If/Easements (encroachments)per engineering conditions of approval and plat140( [ u Water Quality/Quantity Facility: / f Assess Water Quality Fee in-lieu: ❑ Yes "No /0//4/1/' Assess Water Quantity Fee in-lieu: ❑ Yes g No LIDA Facility on lot: ❑ Yes r No ❑ Final Plat Recorded: Zile? l /eo' o, (6:V-p 74. ❑ NOT Approved by Engineering: Date: Notes: Lk/Approved by Engineering: _ Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit Approved, NOT Released: fa 47% jw Jtkua:I. 4i{ —Date: /2g )tf Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: vision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: TrYes ❑ N/A Tigard Trans SDC: LYes ❑ N/A Parks SDC: Lt3' Yes ❑ NLA LIDA ❑ YesN/A OK to Issue Permit Approved by Permit Coordinator: Date: `g14��1 I:\Building\Forms\BldgPermitRvw_RES_022819.docx