Loading...
Plans �Aa tiVE: SEP 11 2019 CITY OF IIGA D BUILDING Building Plans for City of Tigard Building Permit Application %I ISIO Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987(c,�gmail.com Contractor: Jon Erickson, 503-730-9220 ion.eveniobs gmail.com CCB 162397 Scope of Work— Repair Decks OFFICE COPY • Replace perimeter joists with PT • Repair joist and soffit dry rot CITY OF TIGARD -coat deck surFace aco ;: REVIEWED FOR CODE COMPLIANCE • Replace 42" guardrail and infill to comply with Approved: IBC multi-family code T �l UTC: [ ] Permit#: ,,p 20 19- 0 C Address: toisi.calS ,s-‘„? 114 -11. Suite#: By: Date: 9 -ate} - File Name: Fountains Deck Permit Plans REVISED.pptx VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT 9/11/19 THE CODE OFFICIAL FROM Fountains at Summerfield - Deck Building Plans 1 REQUIRING THE CORRECTION OF ERRORS.OSSC 105.4 m :h a Lattrci co Typical Typical Deck Construction and Size — 102 SF Cb "Y'tc+; Brick Col. 114.5" 15 x 11.5 <------_ Imbedded 6x6 PT n 4x4 PT Posts 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG < >< >< Ref: 2014 Oregon Structural 43" 15" 56.5" Specialty Code—Table 2304.9.1-29 2"x8"Joists 16" OC Blocking supports Simpson Rim joist attached to " Tension Ties DTT2Z.Two lateral joists with / DTT2Z brackets required for Three 16D 3-1/2"n HDG posts in this position. See Beam" 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty Tension Ties—page 337 Code—Table of 2304.9.1-29 House—Brick exterior 11 \ , . ^%Psah 4vs a6w;,, 43" Scale— 12"/increment V (^� Lamm. 9/11/19 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section Posts—4x4 PT Flashing 2" x 3" 1/7 Resurfacing material 3/4" exterior plywood decking 0 E it co N Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing %2° plywood soffit Scale— 1" increment 1•1111111111111111111111 IN=11111111MININ 9/11/19 Fountains at Summerfield - Deck Building Plans 3 Guard Rail Post — Simpson Tension Ties Posts—4x4 PT K � 'NI '''' :,,,i:- l: ';',,,' ,,,..t„=�; Simp x¢ Attach to lateralsonDDT2Z joist with 8SDS 1.5 screws fl . _ kA1 'A" x 6" Machine Bolt x � W DTT2Z supports 1800 lb. HDG with nuts and tension load. Meets IBC washers +.,.o for multi-family deck 00 'o guardrails. c., E Refer to attached Simpson CE catalog - Deck Tension Ties Lateral Joist page 337 Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 9/11/19 Fountains at Summerfield - Deck Building Plans 4 Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive A , .., ... Wide Screw SDWS 4", 2 3/8" TL. Two per Railing 2 x 4 TKC Det end, three in mid span Cap Rail —Trex -eau 1" x 5.5" .' i, i ,, i ... I attached to Railingwith „a a p exterior �� ' adhesive. e(s '; ;”, , 1 i to . t, a �it.c v": - 5��4µ ,za°aik4}4 .t 4. Railing Support {`' r„ 1:1'''''''' 2x4TKC . o t ffi' o Attached to H "� � 11. IIIa 0 "; ' Installation of Ni Railing_ and Posts with v a rye4., ` balasters and rails adhesive and per mfg installation Simpson PJ ; instructions. Strong Drive T .0 � f: Wide Screw SWS 4", Railing 2 x 4 TKC Railing Infill - 2 3/8 2 3/8"TL. DecKorator aluminum V _ 2.75 space balaster%" x 32". Spacing 3.75" DecKorator Scale 1" increments 0 µt;$ CodeCompliance Research Report 1 1 1 1 1 1 , 1 1 1 1 1 1 CCRR-0161 9/11/19 Fountains at Summerfield - Deck Building Plans 5 of 5