Loading...
Specifications (6) l ley sv1/4) 154v-eat?. cA- til5r700- OO2q s RECEIVED GREEN MOUNTIAIN JUN 132019 * CITY N TIGARD OP structural engineering BUILDING DIVISION STRUCTURAL CALCULATIONS Plan 2626 Elderberry Ridge, Lot 2 Tigard, Oregon Contractor: Riverside Homes P R , G ,-1',x4 _NE� `SiG2 49 78PE OREGON IA!p A17, r t9, !c MU � 4EXPIR S 12" CJI ' 474 Project Number: 17486 May 20, 2019 Index Structural Information Lateral Analysis L-1 thru L-15 n greenmountainse.tom- info@a greenmountainse.com-4857 MW Lake Rd.,Suite 260,Camas,WA 98607 GREEN MOUNThIN structural engineering. STRUCTURAL DESIGN INFORMATION GOVERNING CODE: 2015 International Residential Code(IRC) 2015 International Building Code(IBC) This engineering pertains to the design of the Lateral Force Resisting System and a review of the home designer's framing and foundation plans. The home designer is responsible for making any necessary changes as required by these calculations to their framing and foundation plans. 1. Dead Load: A. Roof 15 psf B. Floor 10 psf C. Exterior walls 10 psf D. Exterior walls with veneer 50 psf E. Interior walls with gypboard each side 5 psf 2. Live load: A. Floor 40 psf B. Decks&Balconies 60 psf 3. Snow load: A. Uniformly distributed snow load on roof 25 psf 4. Wind load-based on ASCE 7-10 CH 27 MWFRS Directional Procedure: A. 3 Second Gust Wind Speed V=126 mph B. Exposure B C. Importance factor I=1.0 D. Topographical Factor Kzt=1.0 E. Wind Directional Factor Kd=0.85 F. Structure classified as enclosed 5. Seismic load-based on ASCE 7-10 Section 12.14: A. Mapped Spectral Acceleration for short periods Ss=1.0 B. Mapped Spectral Acceleration for 1 second period S1=0.34 C. Soil Site Class D D. Ductility coefficient R=6.5 E. Seismic Design Category D 6. Foundation Soil Properties: A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5 B. Maximum vertical bearing pressure 1500 psf 7. Retaining wall lateral loads: A. Walls free to displace laterally at top 40 pcf B. Walls restrained against lateral displacement at top 45 pcf 8. Concrete: A. 28 day design strength F'c 3000 psi B. Reinforcing bars ASTM A615,Grade 60 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607 GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-1 LATE RAL SEISMIC DESIGN BASED ON ASCE-7-10 1617.5 Simplified analysis procedure for seismic design of buildings SEISMIC BASE SHEAR (EQ.12.14-11 with F=12) mapped spectral acceleration for SS:= 1.00 short periods(Sec.11.4.1) from USGS web site mapped spectral acceleration for St:= 0.34 1 second period(Sec.11.4.1) _ Site coefficient(Table 11.4-1) Fa 1'1 FBased on Soil F„ Site coefficient(Table 11.4-2) F, := 1.8 Site Class D SMS:= Fa•Ss SMS= 1.1 (E q.11.4-1) SM1:= F"•S1 SM1= 0.61 (Eq.11.4-2) 11.4.43 Design spectrum response acceleration parameters 2 SDs 3'SMs SDs= 0.73 > 0.50g SEISMIC 2 CATEGORY SD1:= 3•SM1 SD1= 0.41 > 0.20g D per Table 11.6-1 WOOD SHEAR PANELS 1.2 SDS R:= 6.5 Table 9.52.2 V:_ •W 1.2.0.73 V:= —•4,! V:= 0.135•W 6.5 12.4 Seismic Load Combinations E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.3.42) WSD:= 0.7•E 0.7.1.3.0.135.W 0.123,W WOOD SHEAR PANELS II GREEN MOUNTMIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-2 LATE RAL SIMPLIFIED WIND AND SEISMIC COMPARISON WIND At" 7.4 psf psf Wind ease Shear <------- Length L:= 50•ft Height Ht:= 24•ft WIND: L Ht.(11•psf+ 7.4•psf) SEISMIC WIND= 22080 lb Fr _> Wroof F2 - — Wfloor — Seismic Wwal I Base Shear ArooF:= 50•ft•46•ft Aro = 2300ft2 Afloor 42•ft•34•ft Afioor= 1428ft2 Wwalls 4.50•ft•20•ft Wwalls=4000ft2 SEISMIC:= (Aroaf 15•psf+ Afoor•15•psf+ Wwalls.10 psf)•0.123 SEISMIC= 11798.16 lb WIND GOVERNS DESIGN GREEN MOUNThIN PROJECT: Riverside - Plan 2626 lir structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-3 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE VELOCITY PRESSURE qz:= .00256•KZ•Kzt•Kd•V2•I (Eq.6-15) EXPOSURE B WIND SPEED(3 second gust) Vas:= 126 mph IMPORTANCE FACTOR I := 1.0 TOPOGRAPHICAL FACTOR Kzt:= 1.0 WIND DIRECTIONAL FACTOR Kd:= 0.85 (Table 6-4) EXPOSURE COEFFICIENT 0'-15' Kz:= 0.57 qZ:_ .00256•Kz•Kit•Kd•V3,2•I qz= 19.69 (varies/height) 15-20' Kz:= 0.62 qz:= .00256•KZ•Kit•Kd•V3,2 I qz= 21.42 20' 25' Kz:= 0.66 qz:= .00256•KZ•KZt•Kd•V3s2•I qz= 22.8 25-30' Kz:= 0.70 qz:= .00256.Kz•Kzt•Kd•V3s2•I qz= 24.18 ft GREEN M0UNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-4 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. WIND PRESSURE Li, C, G:= 0.85 Gust factor CP pressure coefficient AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1 0'-15' WINDWARD P„,:= 12.4•psf•0.85.0.8 PW= 8.43 psf LEEWARD PL := 12.4•psf•0.85.0.5 PL= 5.27 psf 15-20' WINDWARD P,,:= 13.49.psf•0.85.0.8 PW= 9.17 psf LEEWARD PL:= 13.49•psf•0.85.0.5 PL = 5.73 psf 20'-25' WINDWARD P",:= 14.36•psf•0.85.0.8 P„,= 9.76 psf LEEWARD PL:= 14.36•psf•0.85.0.5 PL = 6.1 psf AT ROOF 0'-15' WINDWARD P„,:= 12.4•psf•0.85.0.3 PW= 3.16 psf LEEWARD PL := 12.4•psf•0.85.0.6 PL = 6.32 psf 1g-20' WINDWARD P„,:= 13.49.psf•0.85.0.3 PW= 3.44-psf LEEWARD PL:= 13.49•psf•0.85.0.6 PL = 6.88psf 20'-25' WINDWARD PN,:= 14.36•psf•0.85.0.3 PN,= 3.66psf LEEWARD PL := 14.36•psf•0.85.0.6 PL = 7.32 psf 25-30' WINDWARD P„,:= 15.23•psf•0.85 0.3 P„,= 3.88 psf LEEWARD PL:= 15.23•psf•0.85.0.6 PL = 7.77 psf h GREEN M O U N TSI I N PROJECT: Riverside - Plan 2626 lllir structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-5 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. Assume 3 6.88 Cp-0.3 psf psf 8 ,,; Cp--0.6 8.5ft 17 I 9.17` .1 ::::.-'_ psfI. 6.1 psf 9 ft Mean Roof Height 18+ 25 = 21.5 2 Loads at Roof roof-max roof-ave Windward 3.44•psf-8.5-ft= 29.24plf 3.44•psf 5.ft= 17.2 plf Leeward 6.88•psf•8.5•ft= 58.48 plf 6.88 psf 5•ft 34.4 plf Wall loads at upper level at main level Windward 8.43psf•4•ft= 33.72 p If 8.43•psf-8.5-ft= 71.66pIf Leeward 5.73•psf•4•ft= 22.92 plf 5.73•psf°8.5•ft= 48.71pIf II GREEN MOUNTnIN PROJECT: Riverside - Plan 2626 11110 structural engineering DATE: Dec . 2017 BY: CM 9 9 JOB NO: 17486 SHEET: L-6 LATERAL kNA140 1.44:0 nT n i �W f Uwe) II ' ii ii 1 >1 kb*L. ❑ ❑ [p 0 Fri i . II.. l r ° r 7 k , IP r r V u F ----- --- - AO IV J. Alcie 't° NI in • ® ••••4 , I - r I ❑ CEEI MIMA5t6 : 1 1 1 : . &"ril A GREEN MOUNThIN PROJECT: Riverside - Plan 2626 , IOW structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-7 LATERAL loiw io oto .4P '2 'Oil- r-- REIESIIIIMINIIN =r., 1 e-11 II OF El Wil I I11 A . P i S Is � I 11 IN r- ir, ,_______________JI IN no 11 In I v 1 I__ 1 1 I . IN LOFT •.J MTI IH IN Be) IM IQ 1trxismI! It 1 ,, I L I 11 Yr— 'Pa t451 +'. II11.1=M==WsmnMW=MI_—J 1 1 tPA. AL tLEVA oN FOR'e.C' r t at �� t t 13/45 r A GREEN MOUNTVIIN PROJECT: Riverside - Plan 2626 II" structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-8 LATERAL 1Ntuc, LIMOS m la > 11400-di° '" ORM Vegr316 I NOOK y� ONCAT r^ ROOM 8 I II ,A -ajr-ri- -1 -s ,' - III . . Iii i ] ; II : ICANwo II I —+-I -- =e9 - I r� � I J U-4��'= I� . l /��! GARAGE --- rV I6;1).‘A. OMMA* , Olk I . t' -')› I Iii -r.--.\- 1;1- L t- 2C0 1 i %60w I°,; r--. A I • i It GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-9 LATERAL SHEAR WALL DESIGN Pdl Pdl Wdl p m P:= wind V:= seismic h R=Holdown Force Based on IBC Basic Load Combinations 0.6D + W (Equation 16-11) 0.6•D + 0.7•E (Equation 16-12) Overturning Moment: Mot:= Ph (L2 Resisting Moment: Mr:= 0.6 Wdi + Wwaii) 2 + 0.6•Pdi•L Mot— Mr Holdown Force R L II N GREEN MOUNTh' N PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: cm JOB NO: 174 8 6 SHEET: L-10 LATERAL Left Elevation Exterior Walls Second Level Wind Force P:= 1700-lb P= 1700 lb Length of wall L:= 3.5•ft+ 6•ft+ 11•ft L= 20.5ft P Shear v:= — v= 82.93plf A 3.5 Overturning Mot:= P•8•ftMot= 2321,951b.ft Moment 20.5 (3.5•ft)2 Resisting Mr:= 0.6.(15•psf•17•ft+ 10•psf•8•ft) 2 + 0.6.600•lb•3.5•ft Moment Mr= 2491.13lb•ft Mot- Mr Holdown = -48.34 lb Force 3.5ft Main Level Wind Force F:= 4400.16 P= 4400 lb Length of wall L:= 4.ft + 4.ft+ 6•ft+ 13•ft L= 27ft P Shear v:= — v= 162.96pIf B 4 Overturning Mot:= P 9 ft 27 Mot= 5866.671 b•ft Moment (4.ft)2 Resisting Mr:= 0.6•(15•psf•17•ft+ 10•psf•17•ft) 2 + 0.6.800•lb•4ft Moment Mr= 3960lb•ft Mot- Mr Holdown = 476.67 lb Oft Force GREEN MOUNTnIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM Joe no: 17486 SHEET: L-11 LATE RAL Front Elevation Exterior Walls Second Level-Ele vA Gov design Wind Force P:= 2859•Ib P= 28591b Length of wall L:= 5•ft•2+ 3.5•ft•2 L=17ft P Shear v:= - v= 168.18plf 3.5 Overturning Mot:= P 8•ft•— Mot= 4708.94Ib•ft Moment 17 (3.5•ft)2 Resisting Mr:= 0.6•(15 psf 4•ft+ 10•psf•8•ft)• 2 + 0.6.600•Ib•3.5•ft Moment Mr = 1774.5lb.ft Mot- M� Holdown = 838.41 Ib Force 3.5•ft Main Level -not considering the 3rd car garage Wind Force P:= 3680•lb P= 3680 lb Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25•ft L= 6.75 ft 2.25.3.5 = 7.88 P Shear Wind v:_ - v= 545.19 plf E L 2.25 Overturning Mot:= P•7.88•ftMot= 9666.13 lb ft Moment 6.75 (2.25•ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• 2 + 0.6.800.16 2.25•ft Moment Mot— Mr M�= 1292.63 lb ft Holdown = 3721.56 lb Force 2.25•ft HTT5 II GREEN M O O N Th'I I N PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 174 8 6 SHEET: L-12 LATE RAL Right Elevation Exterior Walls Second Level Wind Force P:= 1700.1b P=1700 lb Length of wall L:= 3•ft+ 6•ft+ 10•ft L= 19ft P Shear v:= 1 v= 89.47p1f A 6 Overturning Mot := P•8•ft-- Mot= 4294.74 Ib•ft Moment 19 (6-ft)2 Resisting t 1 := 0.6•(15-psf•17-ft+ 10•psf-8•ft)• 2 + 0.6•600.1b•6-it Moment Mr = 5778lb•ft Mot - Mr Holdown = 247.21 lb Force 6-ft Main Level Wind Force P:= 4400-lb P= 44-00 lb Length of wall L:= 15-ft + 7-ft + 4-ft. L= 26ft P Shear v:= - v= 169.23 plf 13 4 Overturning Mot:= P•9•ft•26 Mot= 6092.31 lb-ft Moment (7 ft)2 Resisting Mr:= 0.6•(15•psf•17•ft+ 10•psf•17•ft)• 2 + 0.6.800•lb•4•ft Moment Mr = 8167.5lb-ft Mot - Mr Holdown = -518.8 lb 4-ft Force II GREEN MOUNThIN 1 PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-13 LATE RAL Rear Elevation Exterior Walls Second Level Wind Force P:= 3043•lb P= 30431b Length of wall L:= 8•ft+ 7•ft L= 15ft P Shear v:= — v= 202.87pIf L 7 Overturning Mot:= P•8 ft — Mot = 11360.53 lb ft Moment 15 (7.ft)2 Resisting Mr:= 0.6•(15•psf-2-ft+ 10.psf•12•ft)• 2 + 0.6.600.1b•7-ft Moment Mr = 4725 lb *t Mot- Mr Holdown = 947.931b Force 7.ft MSTG40 Main Level Wind Force P:= 4303•Ib P=43031b Length of wall L:= 3•ft+4•ft+ 3.5•ft L= 10.5ft P Shear Wind v:= — v=409.81 plf D L 3 Overturning Mot:= P•9 ftMot= 11064.86 lb•ft Moment 10.5 (3.ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10.psf.8.ft)• 2 + 0.6.800•lb•3-ft Moment Mot- Mr M�= 1818Ib•ft Holdown = 3082.29lb Force aft HITS N GREEN MOUMTnIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-14 LATE RAL Interior Shear Walls at Garage Main Level Wind Force P:= 3797-lb P= 37971b Length of wall L:= 12•ft L= 12ft P Shear Wind v:= — v= 316.42pff C Overturning Mot:= P.9.ft Mot= 34173Ib-ft Moment (12•ft)2 Resisting Mr:= 0.6.(10•psf-12 ft + 10.psf•9.ft) 2 + 0.6.1200•Ib•12•ft Moment M — r Mr = 17712lb•ft Holdown of M = 1371.75 lb Force 12ft HITS GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 IOW' structural engineering DATE: Dec. 2017 BY: CM JOBMO: 17486 SHEET: L-15 LATERAL WIND ON PORCH ROOF 126 MPH,EXP 5 w:= 6•ft•(4.43•psf + 8.86•psf) w= 79.7 plf --/H---- D / \ 11 11 II II II "' II M II IIT II � 1 II / _ll . — " 11 — _ANL__ - _ in / i DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10-ft D:= 12-ft w L l-1 M= 3987 lb ft 2 support beam on post in wall at house with M Simpson HUCQ-SDS C:= L C= 398.71b 12 SDS 1/4x21/4 screws(min)x172 lbs=2064 in combined withdraw w•L Nail top and bottom chord of first truss to wall with v:= p v= 66.45 plf (2)16d nails at 16"o.c. (web to studs)