Plans TREE PLANTING NOTES
1.NEW TREES THAT ARE PLANTED TO MEET THE EFFECTIVE CANOPY REQUIREMENTS SHALL CONFORM TO THE APPLICABLE STANDARDS IN THE TIGARD URBAN FORESTRY MANUAL.THEY
la SHALL BE PLANTED IN ACCORDANCE WITH THE AMERICAN NATIONAL STANDARDS INSTITUTE(ANSI)STANDARDS FOR TREE PLANTING(A300,PART 6)AND ADDITIONAL STANDARDS
ADOPTED BY THE OREGON LANDSCAPE CONTRACTORS BOARD.NURSERY STOCK SHALL MEET THE REQUIREMENTS OF THE AMERICAN ASSOCIATION OF NURSERYMEN FOR NURSERY
STOCK(ANSI Z60.1)FOR GRADE NO.1 OR BETTER.DOUBLE STAKE TREES IF NEEDED FOR STABILITY DURING THE ESTABLISHMENT PERIOD.
2.ROOT BARRIERS SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS WHEN A STREET TREE IS PLANTED WITHIN 5'OF ANY HARD SURFACE,PAVING,OR UTILITY
BOX.
3.IF NEEDED,IRRIGATION TO BE DESIGN/BUILD BY THE LANDSCAPE CONTRACTOR.
4.IF NEEDED,SPECIES SUBSITUTIONS SHALL BE COORDINATED WITH THE PROJECT ARBORIST TO ENSURE EQUIVALENT CANOPY COVER IN ORDER TO AVOID MODIFICATION OF THE
0 10' 20' PREVIOUSLY APPROVED URBAN FORESTRY PLAN.
The project arborist has reviewed this plan and certifies that the trees and tree protection are accurately represented in accordance with the previously approved Urban Forestry Plan.
SCALE: 1"=20,
Morgan Nolen,ISA Board Certified Master Arborist(PN-6145B),ISA Tree Risk Assessor Qualified
Date:Sept.17,2019 I Phone Number:971.409.9354f 4.41...._
,.M/r,'�'L�-t
U •
16.5' PRIVATE WALL — --- -
EASEMENT — —
--- 20' UTILITY SEP 1 9 2019 _
-- EASEMENT - - ; -- - - -
j:F
— — — 7 Ty 7_:._ —• - '3d�70, C- 7
■ _>■ _ - 145
r.- _ •--- ' - - fig---- -- --k, ---
— — -- --- -
-- - ,T00
ON
- - _ - - - - - I
• �— [148I
I I
Cantilever Fireplace -L -H -- -- --- 150
•
••'
3R6inI i' 152
LOT 16 154
•' LOT 14
.--�� 0I I163FFJ---
o
`® ) KATSURA/CERODIPHYLLU$JAPONICUM bt•••I•
-.ft • •••2885
O n -• ••-•�-- 156
J (DIAMETER SPREAD 40') •• ,• Q}`�/ ■ ■ ■ ■ y
TIL1` ■
• •---- 158
Water Service •• •• ■
Drainage > ,•4 .•• 5 fl 144_1
Erosion L.•
Grade -_ �• 161 GFE --►
•f ;- 0P
• 20 GAR —i 5j f- �_ -
co Lot Area:4800 SF I _ . ChD 'Z7 r;
R Bldg Coverage: 2685 SF I ■ Q
`? Total Imperv�l : 2650 SF ' — — — J
H . C
Coverage: 40% / 4i% Total E ■
c ■ 0. 0
- - - - - t csJ-. r . _'Ti
g \ v 50.00Lo ' 1 t 4r'. i v; _ et
1
156 8' Pih� .- . • D
9 J -_
160 i ICI
- `® J o ' - • ■B H Al = O
—
al
E SW HANSEN LANE '
DATE
MSr2o1- 0037 f
08'15'2018 ELDERBERRY RIDGEiiiWESTLAKE
REVISION
g 1 CONSULTANTS INC.
DRAWN BY TIGARD, OREGON
DAB 7644 SW HANSEN LN ENGINEERING • SURVEYING • PLANNING
CHECKED BY
JAB LOT SETBACKS PACIFIC CORPOgRATE CENTERo
15115 S.W. )
JOB NO. LOT 15, 4800 SF TIGARD, OREGON 972UOIA 24 FAX
SUITE 150 FAX((503) 624-0657
g 1306-006