Report (3) `BuP2U1g 0o3L.2 154 1 Northwest Testing, Inc. 4, 0 A Division of Northwest Geotech,Inc. • 9120 SW Pioneer Court,Suite B,Wilsonville, Oregon 97070 1503.682.1880 FAX:503.682.2753 I www.nwgeotech.com July 29,2019 Project No. 2870.4.1 City of Tigard Community Development Department Building Division 13125 SW Hall Boulevard Tigard, Oregon 97224 Subject: Final Summary Report of Special Inspections Durham Primary Sludge Heating System(CWS Project No. 6368.076) 16060 SW 85th Avenue Tigard, Oregon Permit No. BUP2018-00342 Dear Sir or Madam: As requested, Northwest Testing, Inc. (NTI) has provided special inspection for the Durham Primary Sludge Heating System (Project No. 6368.076). Inspections were provided on an on-call basis. Our special inspection services included the following activities: Anchors—Adhesive • Material Verification • Adhesive Anchor Installation Inspection Concrete Construction • Material Verification • Inspection of Reinforcing Steel and Placement • Inspection of Anchors Installed in Hardened Concrete • Verified Use of Required Mix Design • Provided Fresh Properties Tests and Cast Compressive Strength Specimens • Inspection of Concrete Placement for Proper Application Techniques • Inspection of Formwork for Shape, Location and Dimensions of the Concrete Member Being Formed A complete record of our inspection reports have been forwarded to the project team and the Washington County Department of Land Use & Transportation — Building Services throughout the course of this project. To the best of NTI's knowledge, based on our inspections, the structural aspects of the project have been constructed in substantial conformance with the approved drawings, specifications, applicable provisions of the State Building Code, and the inspection methodology and acceptance criteria established by the project designer(s). This opportunity to be of service is sincerely appreciated. Should you have any questions, please contact the undersigned. NORTHWEST TESTING, INC. 140 "--14V 1-4(144)--- Michael A. Ginsbach Construction Services Manager Copies: (1)Addressee (U.S. mail) (1) Michael Idehara, P.E., Clean Water Services (E-mail) Northwest Testing, Inc. �. A Division of Northwest Geotech,Inc. 9120 SW Pioneer Court,Suite B,Wilsonville,Oregon 97070 ph:503.682.1880 fax:503.682.2753 I www.nwgeotech.com EXPANSION/ADHESIVE ANCHOR INSPECTION REPORT PROJECT NO. 2870.4.1 PERMIT NO. BUP2O1 8-00342 PAGEOF 1 1 PROJECT NAME Durham Primary Sludge PROJECT REPORT Heatin S stem LOCATION SiSEQUENCE NO. 9 Y 16060 SW 85 Avenue (Project No. 6368.076) Tigard, Oregon A-1 CLIENT OR GENERAL INSPECTION OWNER Clean Water Services CONTRACTOR R.L. Reimers Company DATE 01/07/19 INSTALLATION STRUCTURE CONTRACTOR R.L. Reimers Co. Heat Exchanger Grinder Pads Dowels CLIENT OR OWNER ADDRESS 2550 SW Hillsboro Highway, Hillsboro, Oregon ANCHOR OPERATIONS Met Project Requirements ICC Evaluation Services Report N/A 1:4*';. NO • NOTED: ESR-2508 Anchor Type/Size ' yp N/AS NO NOTED: No.4 at 48"on-center rebar dowels Adhesive Type N/A NO NOTED: Simpson Set-XP Adhesive Expiration Date N/A p Al NO NOTED: 08/20 Base Material N/A NO NOTED: Normal weight concrete Hole Diameter/Drill Bit Diameter N/A ES NO NOTED: s/�� Diameter Embedment/Hole Depth N/A YEt NO NOTED: 4"min. Hole Condition/Cleanliness N/A NO NOTED: Blown, brushed, blown Abandoned Holes N/A NO NOTED: Filled with epoxy Anchor Installation/Placement N/A Y . NO NOTED: Per 1/M002 Temperature/Curing Requirements N/ANO NOTED: 68°F Tightening Torque N/ x YES NO NOTED: Tension/Pull Testing YES NO NOTED: THE FOLLOWING WAS NOTED: NTI arrived on-site, as requested, to monitor the installation of the heat exchanger grinder pads dowels. No.4 at 48"rebar dowels were installed in clean holes with 4"minimum embedment using Hilti RE-500-V3 epoxy per 1/M002. To the best of NTI's knowledge,the subject epoxy anchor installation occurred in general conformance with the project plans, specifications, ESR-2508,and pertinent codes. NTI informed R.L. Reimers Co. personnel of all observations. FIELD REPRESENTATIVE: Kahn Bradov REVIEWED BY: Michael A. Ginsbach' "C�-- CERTIFICATION NO.: OBOA No. 925 COPIES TO: Michael Idehara, P.E., Clean Water Services Edward Fon-Hon Ling, P.E., S.E., Peterson Structural Eng. Ross Meyer, R.L. Reimers Company REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS This document shall not be reproduced, except in full, without written approval of NGI/NTI Q-5 a \\192.168.1.197\Daily Reports\2800-2899\2870-41\2870-41a01.doc Effective Date:12/03/2005 Northwest Testing, Inc. mm A Division of Northwest Geotech,Inc. 8120 SW Pioneer Court,Suite B,Wilsonville,Oregon 97070 I ph:503.682.1880 fax:503 682.2753 I www.nwgeotech.com EXPANSION/ADHESIVE ANCHOR INSPECTION REPORT PROJECT NO. 2870.4.1 PERMIT NO. BUP2018-00342 PAGEOF 1 1 PROJECT NAME Durham Primary Sludge PROJECT REPORT LOCATION SEQUENCE NO. Heating System 16060 SW 85th Avenue (Project No. 6368.076) Ti ard, Oregon A-2 CLIENT ORINSPECTION OWNER Clean Water ServicesCONTRACTOR R.L. Reimers Company DATE 01/30/19 INSTALLATION STRUCTURE CONTRACTOR R.L. Reimers Co. Heat Exchanger Pad CLIENT OR OWNER ADDRESS 2550 SW Hillsboro Highway, Hillsboro, Oregon ANCHOR OPERATIONS Met Project Requirements ICC Evaluation Services Report N/A S . NO NOTED: ESR-3187 _ Anchor Type/Size N/A s , NO NOTED: 3/4"x 7.5"SS Threaded Rod _ Adhesive Type N/A NO NOTED: Hilti HIT HY-200 A Adhesive Expiration Date N/A r.444. No NOTED: 07/2019 Base Material N/A NO NOTED: Normal weight concrete Hole Diameter/Drill Bit Diameter N/A NO NOTED: 1/9" Diameter Embedment/Hole Depth N/A NO NOTED: 5.5"min. Hole Condition/Cleanliness N/A NO NOTED: Blown, brushed, blown Abandoned Holes goy YES NO NOTED: Anchor Installation/Placement N/A NO NOTED: Per Detail 1/M-002 Temperature/Curing Requirements N/A YES NO NOTED: 66°F Tightening Torque dNIA, YES NO NOTED: Tension/Pull Testing .0",,A.A YES NO NOTED: THE FOLLOWING WAS NOTED: NTI arrived on-site, as requested,for anchor installation inspection of 3/4"x 7.5" SS threaded rod installed at the heat exchanger. (6)Total anchors were installed in clean holes with 5.5"minimum embedment using Hilti HIT HY-200 A epoxy per Detail 1/M-002. To the best of NTI's knowledge, the subject epoxy anchor installation occurred in general conformance with the project plans, specifications, ESR-3187, and pertinent codes. NTI informed R.L. Reimers Co. personnel of all observations. FIELD REPRESENTATIVE: Wes Watkins REVIEWED BY: Michael A. Ginsbach ` CERTIFICATION NO.: WABO No. SI 02175 COPIES TO: Michael Idehara, P.E., Clean Water Services Edward Fon-Hon Ling, P.E., S.E., Peterson Structural Eng. Ross Meyer, R.L. Reimers Company REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS Test results only relate to the items inspected or tested. This document shall not be reproduced, except in full, without written approval of NGI/NTI Q-5 a \\192.168.1.197 gaily Reports\2800-2899\2870-41\2870-41a02.doc Effective Date:1/10/2019 • Northwest Testing, Inc. A Division of Northwest Gcotech,Inc. 9120 SW Pioneer Court,Suite B,Wilsonville,Oregon 97070 ph:503.682.1880 fax:503.682.2753 I www.nwgeotech.coon REINFORCED CONCRETE INSPECTION REPORT PROJECT NO. 2870.4.1 PERMIT NO. BUP2O1 8-00342 PAGE OF 1 1 PROJECT NAME Durham Primary Sludge PROJECT REPORT Heating System (Project LOCATION 16060 SW 85th Avenue SEQUENCE NO. No. 6368.076) Tigard, Oregon C-1 CLIENT OR OWNER GENERAL REPORT Clean Water Services CONTRACTOR R.L. Reimers Company DATE 01/09/19 CONCRETE STRUCTURE Heat Exchanger and Sludge INSPECTION CONTRACTOR DATE R.L. Reimers Company Grinder Pads 01/09/19 CLIENT OR OWNER ADDRESS 2550 SW Hillsboro Highway, Hillsboro, Oregon REINFORCED Met Project CONCRETE OPERATIONS Requirements Concrete Mix N/A NO NOTED: Wilsonville Concrete Products Mix No.40701001A Fresh Properties N/A YES . y:. NOTED: Slump exceeded by%inch Handling and Placing N/A iEs. NO NOTED: Batch to Discharge Times N/A YES 9, NOTED: Exceeded by 30 minutes :.... ........... Formwork N/A .. 5 ; NO NOTED: Concrete Reinforcement N/A NO NOTED: Embedments &Anchor Bolts A 1 `fj YES NO NOTED: Concrete Curing .„ YES NO NOTED: Foundation Conditions U YES NO NOTED: CON. WATER CEMENT LOAD TICKET TRUCK TEMP., BATCH SLUMP, AIR, ADDED, W/C CONTENT NO. NO. NO. NO.CY °F TIME INCHES % GALS RATIO (lbs/y&) PLACEMENT LOCATION Heating Exchanger and 1 15094 67 3 55 7:47 am 5.75 4.7 0 NA 663 Sludge Grinder Pads THE FOLLOWING WAS NOTED: NTI arrived on-site,as requested, to provide reinforced concrete placement inspection of Wilsonville Concrete Products Mix No.40701001A placed as heat exchanger and sludge grinder pads. Fresh properties testing was provided and one set of five compressive strength cylinders were cast from the load delivered. Test cylinders were stored on-site, overnight, in an insulated cure box. Slump was exceeded by 3/ inch and batch to discharge time was exceeded by 30 minutes. Batch weights on load ticket are incomplete and water cement ratio cannot be calculated. To the best of NTI's knowledge, with noted exceptions,the reinforced concrete placement occurred in general conformance with the project plans,specifications, and pertinent codes. NTI informed R.L. Reimers personnel of all test results and observations. FIELD REPRESENTATIVE: Wes Watkins REVIEWED BY: Michael A. Ginsbach' "C...— CERTIFICATION NO.: WABO SI 20175 COPIES TO: Michael Idehara, P.E., Clean Water Services Edward Fon-Hon Ling, P.E., S.E., Peterson Structural Eng. Ross Meyer, R.L. Reimers Company REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS This document shall not be reproduced, except in full, without written approval of NGI/NTI Q-2a \\192.168.1.197\Daily Reports\2800-2899\2870-41\Concrete Reports\2870-41c01.doc Effective Date:12/03/2005 • --- Northwest Testing, Inc. -,, I11 A Division of Northwest Geotech,Inc. 9120 SW Pioneer Court,Suite B,Wilsonville,Oregon 97070 I ph:503.682 1880 fax:503.682.2753 I www.nwgeotech.com CONCRETE COMPRESSIVE STRENGTH REPORT PROJECT NO. 2870.4.1 PERMIT NO. BUP2O1 8-00342 SET OF 1 1 PROJECT NAME Durham Primary Sludge POCCATON REPORTNO.Heating System (Project 16060 SW 85th Avenue No. 6368.076) Tigard, Oregon C-1 CLIENT OR GENERAL REPORT OWNER Clean Water Services CONTRACTOR R.L. Reimers Company DATE 01/16/19 CONCRETE SAMPLE DATE CONTRACTOR R.L. Reimers Company LOCATION Heat Exchanger Pad CAST 01/09/19 CLIENT OR OWNER ADDRESS 2550 SW Hillsboro Highway, Hillsboro, Oregon COMPRESSIVE STRENGTH TEST RESULTS ASTM REQUIRED 28 DAY AVERAGE 28 DAY CAPPING 0 C617 TEST ASTM STRENGTH,(PSI) 4000 STRENGTH,(PSI) METHOD: El C1231 METHOD: C39 SAMPLE DATE AGE DIAMETER AREA, TOTAL LOAD COMPR.STR. FAILURE TESTED ID TESTED (DAYS) (INCHES) (SQ.IN.) (LBS) (PSI) TYPE BY 19-004 A 01/16/19 7 3.99 12.50 41,173 3290 2 OS B 02/06/19 28 C 02/06/19 28 D 02/06/19 28 E H ❑ AVERAGE 28 DAY COMPRESSIVE STRENGTH RESULTS COMPLY WITH 0 AVERAGE 28 DAY COMPRESSIVE STRENGTH RESULTS DO NOT COMPLY WITH PROJECT REQUIREMENTS PROJECT REQUIREMENTS FRESH PROPERTIES TEST DATA ITEM INFORMATION PROJECT REQUIREMENTS ITEM INFORMATION SLUMP,ASTM C143 CAST BY,ASTM C31 (INCHES) *5.75 3–5 W.Watkins AIR CONTENT TIME CAST ASTM C231(%) 4.7 5± 1.5 8:40 a.m. CONCRETE TEMP. UNIT WEIGHT ASTM 01064(°F) 55 50–90 ASTM C138(PCF) 67 AMBIENT YIELD,ASTM C138 TEMPERATURE(°F) 44 -- (yd3) 3.0 MAXIMUM AND MINIMUM NO.DAYS FIELD TEMP.DURING INITIAL 65–78 60-80 CURED,ASTM C31 1 (2 DAYS MAX) CURING,ASTM C31(°F) SAMPLING METHOD USED: ASTM C172 FINAL CURING METHOD USED: ASTM 0511 WATER STORAGE TANKS SUPPLIER DATA ITEM INFORMATION PROJECT REQUIREMENTS ITEM INFORMATION MIX NO. SUPPLIER 40701001A Approved Wilsonville Concrete Products CEMENT CONTENT, TICKET PER yd3(LBS.) 663 658 min. NUMBER 15094 WATER/CEMENT TRUCK RATIO N/A 0.39 max. NUMBER 67 HOT BATCH QUANTITY WATER No -- (yd3) 3.0 ADMIXTURES BATCH Pozz 80, AE 90 Approved TIME 7:47 a.m. WATER ADDED (Based on W/C) TYPE OF ON SITE(GALS) 0 CEMENT I -II METHOD OF MIX TRANSIT THE FOLLOWING WAS NOTED: *Not within mix design specifications. -t 4-1 FIELD REPRESENTATIVE: Wes Watkins REVIEWED BY: Michael A. Ginsbach '- CERTIFICATION NO.: WABO SI 20175 COPIES TO: Michael Idehara, P.E., Clean Water Services Edward Fon-Hon Ling, P.E., S.E., Peterson Structural Eng. Ross Meyer, R.L. Reimers Company REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS Test results only relate to the items inspected or tested. This document shall not be reproduced, except in full, without written approval of NGI/NTI Q-2d \\192.168.1.197\Daily Reports\2800-289912870-41\Concrete Reports\2870-41c01brk.doc Effective Date:1/10/2019 • -- --. Northwest Testing, Inc. A Division of Northwest Geotech,Inc_ 9120 SW Pioneer Court,Suite B,Wilsonville,Oregon 97070 I ph:503.682.1880 fax:503.682.2753 1 www.nwgeotech.com CONCRETE COMPRESSIVE STRENGTH REPORT PROJECT NO. 2870.4.1 PERMIT NO. BUP2O18-00342 SET1 OF 1 PROJECT NAME Durham Primary Sludge LOCAT ON REPORT NO. Heating System (Project 16060 SW 85th Avenue No. 6368.076) Tigard, Oregon C-1 CLIENT OR GENERAL REPORT OWNER Clean Water Services CONTRACTOR R.L. Reimers Company DATE 02/06/19 CONCRETE SAMPLE DATE CONTRACTOR R.L. Reimers Company LOCATION Heat Exchanger Pad CAST 01/09/19 CLIENT OR OWNER ADDRESS 2550 SW Hillsboro Highway, Hillsboro, Oregon COMPRESSIVE STRENGTH TEST RESULTS ASTM REQUIRED 28 DAY AVERAGE 28 DAY CAPPING 0 C617 TEST ASTM STRENGTH,(PSI) 4000 STRENGTH,(PSI) 5360 METHOD: ® C1231 METHOD: C39 SAMPLE DATE AGE DIAMETER AREA, TOTAL LOAD COMPR.STR. FAILURE TESTED ID TESTED (DAYS) (INCHES) (SQ.IN.) (LBS) (PSI) TYPE BY 19-004 A 01/16/19 7 3.99 12.50 41,173 3290 2 OS B 02/06/19 28 3.99 12.50 65,311 5220 5 OS C 02/06/19 28 3.99 12.50 67,206 5380 2 OS D 02/06/19 28 3.99 12.50 68,511 5480 5 OS E H ® AVERAGE 28 DAY COMPRESSIVE STRENGTH RESULTS COMPLY WITH ❑ AVERAGE 28 DAY COMPRESSIVE STRENGTH RESULTS DO NOT COMPLY WITH PROJECT REQUIREMENTS PROJECT REQUIREMENTS FRESH PROPERTIES TEST DATA ITEM INFORMATION PROJECT REQUIREMENTS ITEM INFORMATION SLUMP,ASTM C143 CAST BY,ASTM C31 (INCHES) *5.75 3—5 W.Watkins AIR CONTENT TIME CAST ASTM C231(%) 4.7 5± 1.5 8:40 a.m. CONCRETE TEMP. UNIT WEIGHT ASTM C1064(°F) 55 50—90 ASTM C138(PCF) 67 AMBIENT YIELD,ASTM C138 TEMPERATURE(°F) 44 -- (yd3) 3.0 MAXIMUM AND MINIMUM NO.DAYS FIELD TEMP.DURING INITIAL 65—78 60-80 CURED,ASTM C31 1 (2 DAYS MAX) CURING,ASTM C31(°F) SAMPLING METHOD USED: ASTM C172 FINAL CURING METHOD USED: ASTM C511 WATER STORAGE TANKS SUPPLIER DATA ITEM INFORMATION PROJECT REQUIREMENTS ITEM INFORMATION MIX NO. SUPPLIER 40701001A Approved Wilsonville Concrete Products CEMENT CONTENT, TICKET PER yd3(LBS.) 663 658 min. NUMBER 15094 WATER/CEMENT TRUCK RATIO N/A 0.39 max. NUMBER 67 HOT BATCH QUANTITY WATER No -- (yd3) 3.0 ADMIXTURES BATCH Pozz 80,AE 90 Approved TIME 7:47 a.m. WATER ADDEDTYPE OF ON SITE(GAGALS) O (Based on W/C) CEMENT I - II METHOD OF MIX TRANSIT THE FOLLOWING WAS NOTED: *Not within mix design specifications. FIELD REPRESENTATIVE: Wes Watkins REVIEWED BY: Michael A. Ginsbach }� CERTIFICATION NO.: WABO SI 20175 COPIES TO: Michael ldehara, P.E. 'Clean Water Services Edward Fon-Hon Ling, P.E., S.E., Peterson Structural Eng. Ross Meyer, R.L. Reimers Company REVISION(S)TO PREVIOUS DOCUMENT NOTED IN ITALICS Test results only relate to the items inspected or tested. This document shall not be reproduced, except in full, without written approval of NGI/NTI Q-2d \\192.168.1.197\Daily Reports\2800-2899\2870-41\Concrete Reports\2870-41c01brk.doc Effective Date:1/10/2019