Loading...
Report (5) MCC.208-0o94-7 &7t7 5k/5 )P9QV?A Ss' Bend Office (541) 330-9155 i Geotechnical Office (503) 601-8250 Eugene Office (541) 345-0289 Carlson Testing, Inc. SalemEugene Office (503) 589-1252 Tigard Office (503) 684-3460 Daily Report of Proprietary Anchors Client: APEX LABORATORIES LLC - DARWIN THOMAS Project: APEX LABS - ARGON TANK PLACEMENT CTI Job#: T1805873. Address: 6700 SW SANDBURG STREET TIGARD OR Jurisdiction: TIGARD CTI representative R. MONTGOMERY OBOA 1119/WABO SI 02145,WABO 3592 was on site this date Jan. 03, 2 019 to perform Special Inspection for: Permit MEC2018-00947 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. PER NOTE SK1 PAGE 1 OF INSTALLATION DARWIN Name: INSTRUCTIONS. 1/2" X 8" HILTI HAS E ANCHORS. Company: APEX LABS ANCHORS INSTALLED VERTICALLY WITH 3-3/4" 2. Inspection was "IBC" I I Continuous X Periodic EMBEDMENT, (1) AT EACH CORNER OF BASE ARGON TANK AT SOUTH EAST CORNER OF WAREHOUSE. (4) OF (4) PROPRIETARY ANCHORS INSTALLED WHILE ON SITE. YesNoN/A 1. Reviewed previous inspection reports? X 2. Reviewed evaluation report? X Verified following items meet manufacturer's published installation instructions. REPORT SUMMARY 3. Verified minimum embedment depth of the anchors. X 1. Work inspected was: X Completed n In progress 4.Verified installation of the anchors. x 2. Completed work inspected was in compliance with 5. Verified anchor diameter. x 71 Approved plans and specifications n Shop drawings 6. Verified steel grade. x 7. Verified hole diameter. x n RFI � Design change � Submittal � N/A 8. Verified type of drill bit used. x Document #(s) APPROVED PLANS Dated: 4-23-18 9. Verified hole cleaning method. X 3. Noncompliance item(s) were noted this date, details on 10. Verified adhesive application. x following page(s). n Yes n No 7 x N/A 11. Verified edge distance. x 12. Verified spacing. x 4. Noncompliance item(s) were reinspected this date, details on following page(s). I I Yes n No x N/A 13. Verified installation torque. x II Conform n Remain in progress Evaluation report number & date: ESR 3814 Report(s) findings were discussed and left with DARWIN 1/2017 of APEX LABS Name of product being installed HILTI HIT-RE 500 V3 Batch Number 140105L3 Expiration Date 10/2019 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. 71 See additional report page(s). Distribute attachments. Page 1 of 2 Daily Report of Proprietary Anchors For: 01/03/2019 CTI Job #: T1805873. Project: APEX LABS - ARGON TANK PLACEMENT Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only.Information contained herein is not to be reproduced,except in full, without prior authorization from this office.Under all circumstances,the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared.No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter,please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING,INC. Doug Loftesness Reviewed By: Project Manager Project Manager Review Date:01/07/2019 RM/HH CC: APEX LABORATORIES LLC - DARWIN THOMAS DTHOMAS@APEX-LABS.COM ABHT STRUCTURAL ENGINEERS - CLINTON AMBROSE CLINTON@ABHT-STRUCTURAL.COM AIR PRODUCTS & CHEMICALS - ADAM ANDREWS ANDREWAC@AIRPRODUCTS.COM 8430 SW HUNZIKER ST,TIGARD OR-PO BOX 230997,TIGARD OR 97281 Page 2 of 2