Special Inspection
FINAL SUMMARY LETTER
Date: October 9, 2019
Job#: T1805750
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: Durham AWWTP—Dewatering Centrifuge Replacement(6893)
Address: 16060 SW 85th Ave. —Tigard, OR
Permit#: BUP2018-00130
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Adhesive Anchors
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
StevcrW--Leerch
Project Manager
SW L/j ng
cc: CLEAN WATER SERVICES (DURHAM)-MICHAEL IDEHARA
CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT
JACOBS ENGINEERING GROUP INC-JAMIE DOOLEY
MCCLURE&SONS INC-SAM LOEUNG
MCCLURE&SONS INC-KYLE HANSEN
P:\Projects\General\2018\T1805750\10-09-19 Final Letter.doc Updated 11/30/11