Loading...
Report (2) BttF2VI-oovt -123& OU2.4—4 Rn 4VOO 7409 SW Tech Center Dr,Ste.145 PNAL! Tigard,OR 97223 4."r"{C'b'tYCUT Ph:503-443-3799 Fax:503-620-2748 ILS MUNN.INC M.443.3799 Special Inspection Final Report Date: 8-29-19 Job# 19-8626-19 Permit#BUP2019-00196 Mail To: Project: ENGINEERED PRODUCTS a PAPE' NUANCE SYSTEMS INC COMPANY 7236 SW DURHAM RD#500 9800 40TH AVE S. PORTLAND,OR 97224 SEATTLE,WA 98118 PO#93774-A To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Anchors-Expansion Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for the jurisdiction. Approved by: Bob Brown/President BB/sa Proud to be Nationally Accredited by International Accrediting Service ACCREDITED I f ` 7409 SW Tech Center Dr.Ste. 145 Tigard,OR.97223 sallAALT Ph:503-443-3799 Fax:503-620-2748 itt SE DAILY FIELD REPORT FOR PROPRIETARY ANCHORS OILY TESTING, INC 503.443.3799 Date: Aug 27, 2019 permit#: BUP2019-00196 ENGINEERED PRODUCTS a PAPE' NUANCE SYSTEMS INC COMPANY Continuous 7236 SW DURHAM RD#500 9800 40TH AVE S. PORTLAND, OR 97224 SEATTLE,WA 98118 Periodic f PO#93774-A Inspector/Certification# Jason Brown Cert# OBOA 1018 ACS Job# 19-8626-19 Anchor Embedded in: Concrete Is this a re-inspection?: n Yes I/i No Compressive Strength: EXISTING UNKNOWN Approved plans available?: [7 Yes I I No HOLE DETAIL/CONDITION Work acceptable per approved n Yes — No plans?: Anchor Embed Installation complies with Size: 1/2" Hole f6: 1/2" Depth: 3.75" p manufacturer's evaluation report?: ✓I Yes No Holes cleaned properly?: n Yes n No LOCATION OF ANCHORS Embedment per plans?: ✓ Yes I I No GRIDLINES Warehouse racking INSTALLATION GRIDLINES ESR REPORT# ESR-1917 TZ CARBON & STAINLESS in CONCRETE GRIDLINES ANCHOR TYPE: WEDGE ANCHOR IS THERE AN RFI? n Yes ;/I No EPDXY TYPE: N/A RFI ATTACHED? n Yes ,/ No EXP. DATE: N/A INSPECTION DETAILS: Image Description: ACS representative arrived on site to inspect the 1/2"HILT! KB-TZ • Completed wedge anchors installed into the concrete slab at 3.25"minimum anchor embedment, using(2)anchors at each baseplate for the connection to installation at concrete per Note 5 on Page 1 of the approved plans for the warehouse •ir baseplate. w pallet racking.A torque test was performed at 40 ft/lbs per ESR-1917. The work performed appears to be in conformance with Note 5 and the - manufacturers installation procedures. No known revisions. Foreman notified of Yes No Ill N/A nonconformance items? Foremans Name: Reviewed V I'&) Date: cc: YY 00 08-28-2019 Brian Ferrick Bob Brown, Presidentn`> , BB/JB ACS-1157 ACCREDITED