PFI2019-00377 1011 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2019 00377
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 10/21/2019
T[G A tZ.D 9 Parcel: 2 S 102AB00913
Jurisdiction: Tigard
Site address: 12115 SW 92ND AVE
Subdivision: KIMBERLY ADDITION Lot: 13
Project: Buhle Sewer Repair
Project Description: Pipe burst, replace the sanitary sewer lateral from the house to the existing stub at man hole in road.
Class of Work: FEES
Description Date Amount
Type 1 Utilities(gas, electric, data) PFI Permit Fee 10/21/2019 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www tiqard-or.qov to schedule inspections online.
Contractor:
BLACK ROCK UNDERGROUND LLC
267 NE 34TH PLACE
HILLSBORO, OR 97124
PHONE: 5037479312
Applicant:
DREW MCVEY
267 NE 34TH PLACE
HILLSBORO, OR 97124
PHONE: 5037479312
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: Se. appl)ca._17‘.v.
Issued By: 06;) `.
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00377
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
OCT 2 1 2019
City of Tigard CITY OF TIGARD ppl /�lG�� X317
all
NING/ENGINEERING
_ - ENGINEERING DI:P:1R`I'ti��i
x#{ 11, Public Facilities Improvement (PFI) Permit
PROJECT INI=ORMATION
TYPE OF WORK
Project name:
0 TYPE 1—Franchise l;rihn Vi t t l:
Brief description of project: Zve. \:',0y Cec\r+v, . k perhtnnerlhr\A\'N,IXil:, ttrutaitl
C 11,krKl
y
j' {1►N '`�`+�� ��xc \ '�Q,�1 � 11101Me. \TYPEZ—R()tl'Sickwwik/hrict.�w�e 'k-.t,cr
s s k\"Irk perfnnne+t Iia the purpn%c Qh
k D'. (T,,,ti►,Er_s.)siS\ t pp) sltd k e ;\y, om '"-� )y• teiO4 • Sidewalk ims tll.trii In or r'p r
•J • 1)riveway approach tnatallation and rcpur
SITE INFORMATION • Sanitary sewer laterad mcrctllan„n ani
Inkt main liar rip
1.4Location (address if available): 1 1 55kl-1 � Ql
0 TYPE 3—full Scale Development At.a6
perfctrnted With land me approval%Omit
include.,any of the following:
• Su44%1.441n%or l'anicion'
APPLICANT INFORMATION • Smet widrninh
`, r,, . .11uinlinc installation fin �anq:try Kull,
Name: �' Cr4��.] [_'O G,� t�7 +{ {s��k(� �i storm hewer, ' i ord u Ater, and 'Tigard
1 01 1' . ? k'� 'i1 uinvrxrr�iec'arta
Mailingaddress:l ` �7
City/State: i'�1,\'S\0GI►("C 0 Lip: r 114 ❑ T' PE,4—ti. .d dl'I'cYhrnd.i;y
Phone: 503 t X2.8't-4_PiQ 0 TYPE S—'IiKattt't'rianKk
Email: Phone: NOTE: Type I and 2 applkttuons may he
Contact name: ]Jcc.. lrs+r�P. crnailedtonl�tlrt�9tce(i" irt3,,rt.yhiI.
Phone: Email:
CONTRACTOR INFORMATION Same as applicant
Name: CCB Number: I 1 4tt Q t 1 t
Mailing address: City/State: Zip:
Phone: I?mail:
ENGINEER INFORMATION
Name:
Mailing address: C:ity/State: Zip:
Phone: I?mail:
ADDITIONAL INFORMATION
I'.stinvatedvalue ofwork isrequired(if over S5,I00):S 1JY' t'4'15�(Qo (within the public right-of-way)
Is work related to a LANG) USE 1)l-CISIt)N% 0 Yes 0 No Case number:
City of Tigard • 13125 SW IIail I3kd. • Tigard,t)rcgcnn 97223 • wwwtigarcl-or,gov • 5113.71Ft-2121 • Page I of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall he designated"Perntittcc"and shall provide financial assurance for
work,if required by the city pursuant to MIC I S.o4.14t1.
• 1Vitt the exception of a,iitjr a titihq t.peranny;lair'uant In a v;ttici franchise tsr license with the On of Ti ant,when the 4 owner and the attplirant
An;different pole,the appiiunt mutt be the putchaier Of rvcr,rd ur II Io.m.V in itt>;tses►it,n With w-ritrcn xuth+rriuttion from the owner
in an.tgcnt of the uevner. 'Il1C I,Wnir Must .it;t1 this utrtttiratiun in the sisace prtniated to]ut7niit.1 written .nahuriratiun µith this
ail rlic.ititin. hninettiscit ut I.ieenaed t_litittoa an:MN required to 4iht,uin the owner's siin.uure on the'aptthealNtn.
I,the applicant,certify that:
• To the hest of my knowledge,all the information provided,within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the
conditions and " ,idons of the approval.
�� A.1%. {`eWC 0 t $ ,q
, 1plic ffillirt.,r all thorixct'�' s signature Print name Date
Property owner's signature (if•required) Print name Date
STAFF USE ONLY
Case No: PFt200-O0 11 Permit ice: Sa Received by: Date: 10 21 t'1
Approved by: /•-•e a 71-,6). pate: /Ofzi/z.0/9 Notified by: Date: l 711
City of Tigard • 13125 SW 1 tall Blvd. • 'I'igarcl,Oregon 97223 • ‘‘,ww.tigarttorwiv • 5'03.718-2421-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PH)Permit:
INITIAL PH PERMIT FEE
Part 1: Required submittal fee is Ifr",.of the Net PH Permit Fee.See below for calculations. ,Minimum of-S 011.
NET PFI PERMIT FEE
Part 2: All neon-water system improvements engineer's estimate X 7%(less the initial PH Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12'6.
FOR STAFF USE ONLY FOR STAFF t i• ONLY
PE 4: SMALL WIRELESS FACILITS l IT 1--3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way licenser CI Yes ❑No TYPE 1 AND TYPI. _'- Must include a sketch
showing:
tinder the wireless facilities standards,is the proposal
❑ Dimensions
considered?(cheek all that apply): 0 Small CeII ❑Macro 0 Street Name
I low many install sites arc proposed as part of this permit ❑ Site Address
Application?
TYPE 3-Must provide 4 sets of plans(sized 24 x 36
or 22 x 34)and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
0 Public Right-of-Way 0 Private Pmperty
❑ Coyer—Site,Vicinity,Ahhrevitoi+,it,Legend
If equipment is to be located on private property,describe the 0 General Nines(City,Water,Sewer,etc.)
type&use: 0 Street(Plan,Pnofilc)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Qualitx Facilities
O Grading
O landscaping/'Very Plan
❑ Composite I'ritir) Plan(I'.kctrical,Phone,Gas,Storm,
Sanitary,Water.Signage,St met lights,etc.)
❑ Details
❑ Traffic:Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label Om iieci land use ttanuc,revision and plan
log block,dates and shot numbers.)
❑ Engineer's(amstrucriiin Estimate
Additional Submittals
(per land use conditions,if applicable
O Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathwas Design
❑
Water Provider Approval
Cite of Tigard • 13125 SW Hall Blvd. • Nara,Oregon 97223 • wwst:tit;:uci.i,i. ov • 5113-718-2.121 • Page 3 of 4
L +a` ti n: 2-1 , `7 S idu �v,A •l''-1 V"e,
Name: Date:
z_ 1 1 S s� �,,,,� Point of Access:
Ate.
Pipe Tj/pe. Ga.r,
ZeivrQ_
Depth At Home:
Depth at Curb:
`'`,� G ►s$ Depth At Main:
Machine Access: ' N
Roots 0 Pooling 0 Off-Sets
0 Cracks
Repair Type: s� j ,
'mac,
5 t Length of Repair:
Notes:
c tfc ,1`w
$ y - '. �'\ E.
.._ids `n. ,�",y U'
t,i
-y a'a \ . , .�" + - > err 1 3 t,^
" r; y
I
•
t
y Y
(il,,,
F. �' � r •t
's:::' .Y-...;-'4:: „ .
3q
. :-'' *.:\i''' '•'''''''''''';':::71e"' ;.:.''''''''''' • ''''..:. ..*.'*'""J'A''''':":''r'''t':''''...7:'1.
` L� LU F '°
4
!► 3 /� + r 0
L ? .. p �+ . . §s IORRM
$141 ;.7,-; .2.,,,,,,,:....14,,,..' 2:(1"..i..;;,,,.+::41:‘,t. * ..... i, , .. : $' . 1
4
+ ; a . '�
y < „, It. ,,,,.' ,,,,41,
w
dft
ftp:
py
\SJ /
”rmoi :+j r ,
N.
+,d i . " ...kms a,
ttst.
py`�
7
• 41'.
Ae
} #� " ,� !{• x,•4 tam: c. i * '�`� w-
ss
. n{ y ' + 'y l px 1 'f $'te t ap #�+ t°y` �
i �. - i+ \x "Pi.,;.
'1.T� f. (ry * ,; f.4
♦yam �y
—. t: ''.'4.'t.'411 IC,1' - 1 ,, ,4;,',;‘,,, :„ ,,,,,,, IT.f... 4.,,