Loading...
Specifications (2) !y1S7 2.01 - vo2i—/5 51A-) Sng► /go St. u -i,ti(iaroci< I_i_-/ 4 MULHERN--KULP ,._...,„ 300 Brookside Avenue.Budding 4,Ambler,PA 19002 p 215-646-8001 mulhernku/p corn September 17,2019 Jeremy Hammon DAVID WEEKLEY HOMES 1905 NW 169th Place Suite 210 Beaverton,OR 97006 SUMMERBROOK - LOT 15 7891 Model AS-BUILT GARAGE EXTERIOR WALL M+K Project#: 211-18017 Refemnce Structural plans,prepared by Mu/hern a Kulp As-Built Photos,provided by David Weekley Homes Jeremy, Pursuant to your request,we have prepared this letter to address the front exterior wall at the 16' garage door opening. It has been reported to our office that the wall was framed following the portal frame detail,using a continuous header to span the full width of the wall. Therefore,the (3)2x6 full height king studs, as specified on plan, were not installed. Photos have been submitted from the field for verification. Based on our evaluation,the Simpson MSTA49 strap shall be installed on the inside face of the wall at each side of the opening per detail 3/SD-3.In addition,(1)Simpson LS90 dip shall be installed at each end of the header,connecting it to the perpendicular wall framing into it at each side.Upon installation of the hardware described here within,it is the professional opinion of this office that the as-built framing is acceptable. Please feel free to call if you have any questions. � _co PROFFS Respectfully, `c,' NGI NE�r tS 9 ti MULHERN & KULP STRUCTURAL ENGINEERING, INC. "t'``' 93737PE vr Nicholas J.Martignetti,P.E. Project Manager ''l.o,(.._ ,W1 - /;1. vGOREGON�% 4::4- 4 J' 10, 2. 4<, Signature,Seal&Date EXPIRES: 111 5i Jzo P:1Client Files1211-David Weekley-POR12018118017-7691 MadelCA12019-09-17-68020015-As-built garage weAA2019-09-17-Lot 68020015-Garage Well.docx