Loading...
PFI2019-00333 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 114 Permit#: PFl2019-00333 I • COMMUNITY DEVELOPMENT Date Issued: 10/02/2019 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG1348 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 3730/1330/1348. Replace 3 poles with taller poles(5412, 1098, 1099). Class of Work: FEES Description Date Amount Type 1 -Utilities(gas,electric, data) PFI Permit Fee 09/27/2019 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: NICK CHANEY 10800 SW AVERY STREET TUALATIN, OR PHONE: 5036122935 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: 2,9C, c - Issued By: t..1,LA0 Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00333 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other REC VED SEP . 2019 City of Tigard CITY OF TIGARD PFI#: Z�L�--oo333 ENGINEERING DEPARTMLE KING/ENGINEERING TIGARD, Public Facilities Improvement (PFI) Permit PROJECT INFORMATION PGE Job # M2763698 TYPE OF WORK Project name: 8 TYPE 1—Franchise Utility Work Brief description of project: performed by NWN,PGE, or utility agency Replace 3 poles with taller poles (5412, 1098, 1099) El TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and main line tap Location (address if available): ❑ TYPE 3—Full Scale Development Work 7218 SW Hunziker Rd 3-7 3I 1 3w 112)45 performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE : Amy Sweany for Nick Chaney • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 10800 SW Avery Street water service area City/state: Tualatin, OR Zip: 97062 ❑ TYPE4-SmallCellTechnology Phone: 503-612-2935 CI TYPE 5—Tigard Triangle Email: preregcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be Nick Chaney emailed to rowpermitsContact name: �tigard-or.gov. Phone: 971-275-2597 Email: preregcoord@pgn.com CONTRACTOR INFORMATION El Same as applicant Name: Portland General Electric CCB Number: Mailing address: 10800 SW Avery St City/State: Tualatin, OR Zip: 97062 Phone: 503-464-7777 Email: preregcoord@pgn.com ENGINEER INFORMATION Name: N/A Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? DYes D No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. # 47.3404..7,1,Al4C4 Amy Sweany for Nick Chaney 09/24/19 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY q " Case No: PFI2.0. OO 333 Permit fee: 300' CO Received by: / lt- Date: g / l� Approved by: 7re4ei Date: Q/02(/lo?019' Notified by: Date: 911241M City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name ❑ Site Address How many install sites are proposed as part of this permit application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Iv ,. y_ " si Edge of Pavement StreetlightDitch --10' . . (1. ? Raaf teamtis .i`.t Ape ' 7"—For hosed"Se1wt. erTi'ng" I • I CD I ; _ Existing House r� I Existing 1 F• 1 • Driveway I VI ! I 21 I of/V1 3I ri IL� • J Z! i 6-1 ! I Existing Shop 1 N ‘ t • I Powerpole I I : I ' _ 1 im • 0 4'."--a.r, • I' 95' 1 I -----1574 I �-— r -Line I 0 I Fire Hydrant(FH) I I I ! Scale: -1":=30' I I I I I � I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 OVERHEAD LEGEND 1 WORK LOCATIONS °'PTREE TRIMMING NOTES • SURVEY GRID BOUNDARY v,... WL1 AND WL2: REMOVE/ABANDON FACILITIES_INSTALL FACILITIES WL 1 PL 5412 PGE OWNED POLE MODIFY/TRANSFERANSTALL ADDITIONAL FACILITIES Install: TRIM TREES AROUND PL 50'-2POLES PL-1099 AND PL-5412 1'NORTHWEST -POLE CLASS(1,2,3,4,H1,H2,S) 0134 WILDLIFE-COVERED JUMPER WIRE HT-Cl 3-IN PVC CONDUIT UNIT W/12IN BKTS A3-L33'-40,217#(NORTH) °4 POLE HEIGHT G20-PRI G16-NEU16,1 23#PRI-16,114# ��1 FRAMING TRANSMISSION&DISTRIBUTION(SEE CODES BELOW) A5-L34'-29,855#(SOUTHEAST) G20-PRI-11,386#-PRI-11,386# D50-FRAME DISTRIBUTION-LC10725,MU 0050 G116e NEU-7,098# C21-01A (3PH.UNDERBLD ANG,DBL.8'HVY POST) PL D905 3 C21-010 D90-(3PH"DBL DE,DBL HVY,POLY)ION 'MU 0090 423-3-IN PVC CONDUIT UNIT W/12IN BKTS WL 2 PL-1098: POE OWNED POLE FRAME DISTRIBUTION-LC10732,MU 0106 A3 Instals _ D106 (1PH SLACK SPAN SGL DE,POLY) (2)G16 PL-55'-2 (4)G19 1'NORTHEAST 0108_FRAME DISTRIBUTION-LC10732,MU 0108 7 �� D106 (3PH BFT LT DBL DE,SLACK SPAN,POLY) TEMP TRANSFER COMM(S), >>'.'- D210 Dap �\ POE PULLED s- S,; WILDLIFE PHASE COVER ?,j D134-FRAME DISTRIBUTION-LC10717,MU 0134 o�j,� TOPPED TO COMM(S) RNEW3cSG A5-L11I--10,026(WEST) (3PH 10FT CORNER FIBERGLASS,POLY) y TELCO TO PULL G18-PRI-10,088#-PRI-10,0088# FRAME DISTRIBUTION-LC10724,MU 0210 y�.0 G16-NEU-4,3496 D210 142 CIO F65T OH TAP (3PH 10FT UNDERBLD FIBERGLASS,ANG,POST) 3 143 40 T Remove: ABC 2AL PL 50'-2 D224_FRAME DISTRIBUTION-LC10732,MU 0224 0106 (3PH 10FT HVY FIBERGLASS DE,SLACK SPAN) son 056 CONDUCTORS 7360 40'4 AS 1966 1412 GC/O F657 OH TAP -..-.__ _ ... INSTALL 1-1/0 AL-TX UG SECONDARY 7340 450 KVAR CAPACITOR BANK .> IN EXISTING CONDUIT REMOVE 1-1N AL-TX OH SECONDARY B TEMP TRANSFER COMM(S), Sky <96, fir+ Q RTOPPEDTOcOMMIS TELCO TO EQUIPMENT d,Tac \ ) Q TELCO TO PULL REPLACE TRIP SAVER II BST RRO 4E 14 n n. ANCHORS GUYING 0 0 o 0 5 -tide 3 1 G_ 115 - N qq POS.LBS a i ' •'''- 'i b N -B 110 AL TX 1 (LEAD: L Ik n mOma4�'a9mi1EC •___.__ 1Guv ��- g 110 AL-TX A_ (LBSI b ' b k 2GUYS IMEMEMCE 5412 7300 50'-2 Anchor Code mop mei 3GUY5 :11:31:1182:13: 4 None O WL 3 PL-1099: PGE OWNED POLE It a°° Install: • • es•Q hr� PL 55'-2 10'NORTH LANDSCAPING NOTES 7340 m=ir D134 WL3 PL-1099: .0D224 X WILDLIFE PROTECTION PRE/POST POLE 1095 41 or 3-IN PVC CONDUIT UNIT W/12IN ROTS N. ...1 (3)142 C/O F100T OH TAP SIDEWALK REMOVAUREPAIR .-- N A5-L25'-42,213#(NORTH) m G20-PRI-13,771#-PRI-13,771# G19-NEU-14,689# A5-L24'-43,3934(SOUTHEAST) 2 1098 G26-NEI ,883#-PRI-15,305# 1 UNITY MAP 7325 55'-2 G16-NEU--7,7,443# SIN Ham Plan St 7275 None Remove: �` 450 kvar KVAR PL 50'-2 Trip Save 165 T I D50 3-IN PVC CONDUIT UNIT W/12IN BKTS 41 r (3)143 C/O F100T UG TAP �' 453 AS(NORTH) 7.:�i _B2ACSR '� 019(NORTH) r.- (3) ,�-�, M-2 872/0 AL SPUN --- B N -TEMP TRANSFER COMMIS), s'- PGE PULLED R ',,, SW VARNS S N TOPPED TO COMM(S) £ 7 cf` .. CA _TELCO TO PULL 1 8194 NN\ 2 35'-6 ^' 0 r 4 198 �� e, •�. 3,'g e 7330 132357155 ° . N N;;,,,,,,, "N Ae �o� w r1 1099 mm 8138 SW vans St •;t:-. 55'-2 45' ,, None / CJ 19,i 4 3 I I-B'10 CU DX.. r 104574 AN2ACSR 3 100T 64 ''2ACSR.10 BC4ACSRh,z Assn”erste s 141310g1AL-Tx SWVARNS ST 13309 Source.-Eon,HERE,EI�Gomm,USGS, HAMPTON R/OGEAP �{/�Ar N inn p IN T R NRCan,En 0 40 80 ART 160-FTiet' a 7080 6w F„ E�hoshnd),00 C,(r) 160- 7090 Fan Kaes,I, trslIOt NGCC,s) I 1 1 1 I 1 1 1 I i l _ N sr 011enSEMMBp contnWlors awl the GIS User Community PGE CONSTRUCTION DRAWING AS-BUILT VERIFICATION 8,NESC VIOLATIONS CORRECTED THINK Foreman: Date: General Foreman: Date: SAFETY (Signature only required for field construction changes.) \IRS j DATE NG REVIEW. IASBUILT BY DESIGNER: DATE SCALE' ACCOUNT AM: JOB NO ANY DEVIATION FROM THIS DESIGN MUST 9/19/2019 1 in=70 ft 1070001 1000004544 M2763698 $E APPROVED BY THE PGE PROJECT MANAGER TITLE (UAM DUE BY 9/16/19)REPLACE 3 POLES WITH TALLER POLES CALL 811 BEFORE YOU DIG CIRCUIT SIZE ATTENTION: WEST PORTLAND-72ND 17 x 11 OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 1PGE LOCATION BY THE OREGON UTILITY NOTIFICATION CENTER. ���a `/ 7218 SW HUNZIKER RD,TIGARD THOSE RULES ARE SET FORTH IN OAR 952-001-0010 DESCRIPTION THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF REPLACE POLES 5412,1098,1099 SHEET THE RULES BY CALLING THE OREGON UTILITY IP COUNTY SECTIONS WORK WITH NOTIFICATION CENTER ADMINISTRATION B(502-232-1987) TIGARD C2101D 1 OF 1 TO REQUEST UTILITY LOCATES CALL THE OREGON KeowwWt's bBlOyuy. WILoeov, E DESIGN BY PHONE DRAWN BY UTILITY NOTIFICATION CENTER,811AT LEAST um beOIe you dig. '-"'""'"""R NICK CHANEY 971.275.2597 WILL ZOBRIST 2 BUSINESS DAYS PRIOR TO EXCAVATION wLSONVILLE.OR 07070 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED