Loading...
PFI2019-00337 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT • '• COMMUNITY DEVELOPMENT Permit#: PFI2019-00337 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/26/2019 T'I c A R[7 g Parcel: 2S102AB00601 Jurisdiction: Tigard Site address: 12075 SW LINCOLN AVE Subdivision: NORTH TIGARDVILLE ADDITION,AME Lot: 63 Project: Ruggiero Project Description: Excavation and disposal of concrete, asphalt, and bamboo; disposal of all material;work area will be landscaped with a LIDA facility. Class of Work: FEES Description Date Amount Type 2-Sidewalk/Driveway Approach PFI Permit Fee 09/26/2019 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: SPRINGER CONSTRUCTION LLC 14845 SW MURRAY SCHOLLS DR STE# 110 PMB 105 BEAVERTON, OR 97007 PHONE: 5032097959 Applicant: RYAN RUGGIERO PHONE: 5415218891 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant See application Signature: Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2019-00337 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Sidewalk/[ 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Sidewalk/[ 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Sidewalk/[ 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Sidewalk/[ 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Sidewalk/[ 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Sidewalk/[ 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Sidewalk/[ 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Sidewalk/[ 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Sidewalk/[ 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Sidewalk/[ 31 -OTHER Applied Notice Other ?F/2c'/9-• DO City of Tigard PFI#: [Enter PFI Number] ' ENGINEERING DEPARTMENT Ir TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: Rueriero De-bavina Proiect • TYPE 1—Franchise Utility Work Brief description of project: Excavation and disposal of concrete, asphalt performed by NWN,PGE, or utility agency and bamboo clump;disposal of all material;work area will be landscaped • TYPE 2—ROW Sidewalk/Driveway/Utility Work performed for the purpose of: • Sidewalk/Curb installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary/Storm/Water lateral service Location (address if available): 12075 SW Lincoln Ave,Tigard, 97223 installation and main line tap • TYPE 3—Work performed with/without land use approval which includes any of the following. • Subdivisions and Partitions APPLICANT INFORMATION • Water Infrastructure Name: Ryan Ruggiero • Street Widening • Sanitary o r Storm Sewer Infrastructure Mailing address: 12075 SW Lincoln Ave • TYPE 4—Small Cell Technology City/State:_Tigard, OR Zip:_97223 • TYPE 5—Tigard Triangle Phone: (541) 521-8891 1 Email: rcruggiero@gmail.com_Phone: (541) 521-8891 NOTE: Type 1 and 2 applications may be emailed to rowpermitsaa,tigard-or.gov. Contact name: Ryan Ruggiero Phone: see above Email: see above CONTRACTOR INFORMATION ❑ Same as applicant Name: Springer Construction,LLC CCB Number: #188168 Mailing address: 14845 SW Murray Scholls Dr. Ste. 110 PMB 105 City/State: Beaverton, OR Zip: 97007 Phone: (503) 209-7959 Email: steve@springerconstructionllc.net ENGINEER INFORMATION Name: NA Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ $5,200 (NOT within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes a No Case number: City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of4 APPLICANTS NOTE: Person specified as `Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Applicant's or authorize agent's signature Print name Date •Property owner s sig ature (if required) Print name Date STAFF USE ONLY Case No: A PO/°-40/1/g59-* Permit fee: 400 " PIT eived by: Date: 1MY� Approved by: 1517•011 ( � Date: f[Z4 l9 Notified by: Date: 7��/ay f City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of4 -N) SEw O� - ,,,,/•:. LINE �V •\ ♦ ^ • Property \ ♦ •` line GARAGE ♦ \ \ Boundary of 178' \ ♦ 6' easement -, 1 \- _ --__._\ (surveyed and 1 , marked on the ground) . „,,,,,,.,__„,•,,, 1 \ _4 — \ �2VERHEAD UTILITY LINE 25A ♦1 '\ '9`♦ o_ o • \�, 1 \�ci) oo°° HOUSE \ ♦♦F� ` til\ `� o°moo° _____ Note: No existing \ 1 F \\'9� oo O at trees are affected \• 4<- •\R`�ca I. Limit of work �V by the project. \ ♦ , F O \ ♦A9° \ °d� ♦ -/ Note: 6' access y< -\\\ ♦J •\ easement boundary G>, �\ ♦ \ surveyed by Township �%� ` 1 ?s\ Surveys, LLC on 9/24/2019 <-'\ ♦ v\ - \ Excavation �\\\, 1 '\ Area -- 77 •\ \• 1 2,274 SF f• ,_¢- N. Straw wattles � �' • installed at downslope \. • end of excavation area `� - - \y o ®♦ a. 7 -3„. Water \ o meter fit 0\.\ r�V ♦ \ `� ky <''' \• 2' contour,-/ °�\'\ •,., -♦ \ �• � N 7/mss • 7 <„,.... .4., Note: .• \ \\ ♦1 G • ° . ° Sidewalk hits Utility locate to Bio-filter bags \•\ �5'c��P. driveway grade surroundingstormJY-o�.v%� here be performed \ \\ Ov prior to \� water inlet -. commencement \, Power of work. \, pole, ,,, i / ♦ Note: Excavated area \� typ' \\)) �,f- ♦ ' e to be covered with straw �POJC�'�/ coV� 7/ to stabilize exposed soils ���'� ��n in anticipation of winter �. /� g`� \c landscape plantings. , _/ \ Ruggiero De-paving Project 1"=20' - 12075 SW Lincoln Ave 20 10 0 20 Feet NORTH Tigard, OR 97223 Tax lot ID#2S102AB00601 Zoning: R4.5 Owner/Applicants: Ryan and Nicole Ruggiero -(541) 521-8891 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑ Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit LI Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan,Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineer's Seal/Signature ❑ Sheet Label(project Land Use name,revision and plan log block,dates,and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per Land Use conditions,if applicable) ❑ Traffic Report ❑ Stormwater Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of SW "Y" St Edge of Pavement "�'-- Ditch —�" Streetlight ,......41,—, •—•—•—•—•—•— —r—•— Ram Dram r�"`�"S. t Fir Tier. •{ . ' ' i—yrsp illi"SewFrriine-- I 1 , L) 6i . Existing House I ail I Existing 1 Ai Driveway l ' Oilii 0� Oil O r 1 a1 I rl 1 a 1 • 0,- 1 I 1 O J Existing Shop 1 Powerpole I I -`= I S — 1 �� o o ^ I I'- 95' 1 1 I -PlopertyLine-—---—-—- -- IFire Hydrant(FH) I I Scale: 'I"=30' ii I I I ! I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable ) North arrow Property lines & dimensions Existing utilities locations (sewer, storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of /"/ ./.20 i -- DO 3 3 -7 Habitat Enhancement Project LEGEND 0,.. 1k11`041-10 • Downspout Flow direction 110 > — • • • Easement boundary 40. ••— •- Property boundary „c\ \\ Ilifi:k. 4VSIFIIIIIPH.A13:1:1:_s..',, "'� 1 Storm C> 1 ` water $ Swale \\\\. ,-jer- \ k, > ow58 ., 1°4 4\ Native +� '� pollinator -, d, hedgerow Wetland plant list: Herbaceous Herbs border � ' Juncus patens A., Carex obnupta { Buried Carex unilateralis ", " perforated Carex to fAola Deschampsia cespitosa c Pipe,typ. Native Bidens cernua -`• t .� pollinator • hedgerow Shrubs ' Physocarpus capitatus Rhamnus purshiana \ ' h k de Cornus sericea •10. 'yak Pollinator hedgerow plant list: Trees and Shrubs Oregon white •Mahonia aquifolium oak,typ. *\ %. .+� - ,� Amelanchier alnifolia ' Holodiscus discolor ,� Quercus garryana \ b Je Symphoricarpos albus ` P Viburnum ellipticum O\'(� LI\Herbaceous border plant list: A\\.��Herbs \\AS6..);Val: S 1"=20' Carex deweyana Epilobium angustofolium Asclepiascordifolia Ryan &Nicole Ruggiero Sidalcea campestris 12075 SW Lincoln Ave Grindelia integrifolia Festuca roemeri Tigard, OR 97223