Loading...
Specifications (16) Yr?ST2o/ - oo a i--/O /L/9Ry sw gh c. v'vt2 GT GREEN MOUNTnIN structural engineering Memorandum September 24, 2019 To: Amilian Avgi, Riverside Homes From:Corina Muntean, P.E Re: Plan 2626 at Elderberry Ridge Lot 3 I understand that the concrete stem wall was poured too high at the fireplace location. We recommended that the sill plate not be cut but instead 2x8 joists be used the span the approximate 6 ft span. If you have any questions, don't hesitate to ask. %cpPRpre 49 78PE 9 v - 001A, 0 1M 12, .041-06 NA WO' !EXPIRES 12. 3i -2474 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607