Loading...
Report (51) / COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Section 1 : Project Information IU[ Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title:WETZEL'S PRETZELS , Project Type:Alteration Construction Site: Owner/Agent: Designer/Contractor: WASHINGTON SQUARE MICHAEL NISIHI DAINEL REEVES 9585 S.W.WASHINGTON SQUARE SPACE 626-432-6920 PDMS DESIGN GROUP Y06 MICHAELTNISHI@YAHOO.COM 2225 EAST RANDAL MILL ROAD PORTLAND,OR 97223 SUITE 300 ARLINGTON,TX 76011 817-701-4808 DREEVES@PDMSDESIGN.COM Section 2: General Information Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Section 3: Mechanical Systems List Quantity System Type&Description 1 Water Heater 1: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:0.98 EF,Required Efficiency:0.88 EF Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Requirements Specific To: Water Heater 1 : • 1. Newly purchased equipment meets the efficiency requirements. Electric Water Heater efficiency: 0.88 EF(241 SL,Btu/h(if> 12 kW)) ✓ 2. Service water-heating equipment performance efficiency.Water heating equipment efficiency has been verified through data furnished by the manufacturer or through certification under an approved certification program. • 3. Temperature controls.Service water-heating equipment have controls to allow a setpoint of 110°F for equipment serving dwelling units and 90°F for equipment serving other occupancies.The outlet temperature of lavatories in public facility rest rooms is limited to 110°F. Plans reference page/section:P1.0 • 4. Heat traps.Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps on the supply and discharge piping associated with the equipment. Plans reference page/section: P1.0 ✓ 5. Pipe Insulation.For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems,piping is insulated in accordance with the specifications of this section. ✓ 6. Hot Water System Controls.Systems designed to maintain usage temperatures in hot water pipes is turned off automatically when the hot water system is not in operation and has demand sensing controls that turn off the system when there is no demand when the system is operational.A check valve or similar device is installed per requirement details. V Exception applies:Where coupled with water heating capacity less than 100 kBtu/h. Plans reference page/section: P1.0 Project Title: WETZEL'S PRETZELS Report date: 07/18/19 Data filename: V:\190169\MEP\Com Check\190169.cck Page 1 of 2 Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. All service water heating requirements are listed in requirements section specific to the system. Section 5: Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed mechanical alteration project has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code,Chapter 8,req ' nts in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. bA0 KA_ .?..4.E..4$50 16 tf Name-Title Signature Da Section 6: Post Construction Compliance Statement ❑ HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. • HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. • Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Title: WETZEL'S PRETZELS � _.._..�. ..._.�....._�.u__._....._..._,__..____ .._...___ Report date: 07/18/19 Data filename:V:\190169\MEP\Com Check\190169.cck Page 2 of 2