Plans (92) -1--_- . -G\cA —G ` 0—kg-IAA S-u3 cZ LA—
RECEIVED
0 JUN 1 9 2019
PLANNING/ENGINEERINGCITYOFTIGARD
0 10' 20'
I I 150 l
SCALE: 1' =20' - - 150
•
•a7 ' ♦ '♦
TREE PLANTING NOTES(Note:Lot 5 was tot 1 in the previously approved Urban Forestry `♦ ♦,
anl
of NEW W TREES THAT ARE PLANTED TO MEET THE EFFECTIVE CANOPY REQUIREMENTS SHALL.P ' 1 ' ♦♦♦♦♦♦ `♦♦152
CONFORM TO THE APPUCABLE STANDARDS IN THE TIGARD URBAN FORESTRY MANUAL 1t 7
y
THEY SHALL BE PLANTED IN ACCORDANCE WITH THE AMERICAN NATIONAL STANDARDS ''r♦ ♦♦♦. `♦,'A 154
INSTITUTE(ANSI)STANDARDS FOR TREE PLANTING(A300,PART 6I AND ADDITIONAL I
STANDARDS ADOPTED BY THE OREGON LANDSCAPE CONTRACTORS BOARD.NURSERY • = \I ♦
NURSERYMEN FOR NURSESTOCK SHALL MEET THE ERYY QUISTOCK(EMTs OFANSI )FFAMERIRCAD ASSOCIATIONBR ETTEOR.F DOUBLE I ' - i: R,156
STAKE TREES IF NEEDED FOR STABILITY DURING THE ESTABLISHMENT PERIOD. 4
2.ROOT BARRIERS SHALL BE INSTALLED ACCORDING'0 THE MANUFACTURER'S * ' 158
SPECIFICATIONS WHEN A STREET TREE IS PLANTED WITHIN S'OF ANY HARD SURFACE, ♦
PAVING,OR UTILITY BOX.
3.IF NEEDED,IRRIGATION TO BE DESIGN/BUILD BY THE LANDSCAPE CONTRACTOR. 2'x (Y B
4.IF NEEDED,SPECIES SUBSITLMONS SHALL BE COORDINATED WITH THE PROJECT PATIO 160
ARBORIST TO ENSURE EQUIVALENT CANOPY COVER IN ORDER TO AVOID MODIFICATION OF
THE PREVIOUSLY APPROVED URBAN FORESTRY PLAN. ,
The project arborist has reviewed thrs plan and certifies that the trees and tree protection 15 r 4 .
71 i
are accurately represented in accordance with the approved Urban I63 F F H�
previously Po Forestry Plan
I3ft6in
Morgan Meilen,ISA Board Certified Master Arborist(PN-6145B),LSA Tree Risk Assessor I I Ii
(
Qualified
-
Date May 25,2019 Phone Number:971.409.9354 0
0
f'.4114--
0 5 ft
171 LST 6 t l , 2885 5 ft FIREPLACE
' oCANTILEVER
KATSURA/CERCIDIPHYLWS JAPONICUM 0
✓J (DIAMETER SPREAD 40') I
(7)
`VIII' �
Water Service x I
Drainage � I`\'''
, 1161 GFH
Erosion i I
Grade I .,J
I I _ DRIVEWAY
LOCATED
IS < WHERE GRAY
Lot Area: 5959 SF — �--S.�I BOX IS LOCATED.
Bldg Coverage: 2000 SF . SS - x
a Total Impervious: 261,3 SF + 8 13' P U E 2 N
Coverage: 33% / 43% Total v ��
N - 1 C i
O I
1 !160 35.50' 160
5' SIDEWALK �—
a EASEMENT r ° 8 PUE
__.
o
BELVOIR CT w
" rpoLN
-
:
N
= 14.450'
)
3
z
DATE
08/24/2018 ELDERBERRY RIDGEWESTLAKE
REVISION
1 TIGARD, OREGON
III
p CONSULTANTS INC.
DRAWN BY
DAB 14934 SW BELVOIR CT
a CHECKED BY ENGINEERING • SURVEYING • PLANNING
JAB LOT SETBACKS PACIFIC CORPORATE CENTER
JOB NO. LOT 5, 5959 SF 15115 S.W. SEQUOIA PARKWAY, SUITE 150 503) 684-0652
1306-006 TIGARD, OREGON 97224 FAX 503) 624-0157