Loading...
Plans (97) 7 VALIDITY OF PEflMIT OFFICE COPY THE ISSUANCE OF A PERMIT 16' Garage Door (As-Is Currently) ` , n BASED ON CONSTRU ION E C E I �/E Ld DOCUMENTS AND O ER DATA SHALL NOT PRE NT SEP 1 o 2019 THE CODE OFFICIAL FROM REQUIRING THE CORRECTION CITY OF TIGARD 007____ ______mmit._ OF ERRORS.ORSC 105.4 = , ;'UILDING DIVISION i_7,_s__711.2.0..7271_0:_i_71,11,11,,,a: (' : _7_- - - ---------Jr--' NW rte, � �-- i — 1.f tis 4 i: 4 el ...., l3 ___.:_v___,7_:.__ � _-ii, - X14 �_ 01- f i Approved plans ,.....------„7------- ---- shall be on job site. CITY OF TIGARD ' ItEVIrAvi D FOR DE COMPLIANCE Approved: [ LUIS AND JESSICA ARREOLA OTS t 1 LIABILITY 10660 SW PARK ST. Permit#: O�`� 0�3�9 The Cityof Tigard and it Address: b O ` o -" TIGARD, OR 97223 employees shall not be GSuite #: responsible for discrepancies 503-890-8911 B3; Date: 9 �`�lie\ which may appear herein. By: ()hotmail.com - Phase 1: Weather-proof, seal and bolt garage door. Frame and Insulate with R-25 x 01101111111 f x I 7 1 it F { \/SIDEoDCCR G000RE CF DCCR N.RAIN EBRI9` . ' ., ,i, L FLASH TO BE SCREWED INTO DOOR l -2 LAYERS OF SILICONE CAULKING PESTS , -L FLASH WEATHER/PEST PROOFING �>�����-. CONCRETE FLOOR LUIS AND JESSICA ARREOLA ': , ,ti 10660 SW PARK ST. — ...•0' TIGARD, OR 97223 503-890-8911 arreola1986(a1hotmail.com Phase 2: Sheet Rock Entire Wall au au up ao ail all OW ION 11111 OM MO IIII LUIS AND JESSICA ARREOLA 10660 SW PARK ST. TIGARD, OR 97223 503-890-8911 arreolal986(a,hotmail.com Process for Closing-Off the Garage Door/Trade-Off s 1. We will create a seal and r the garage door to prevent water/moisture/debris/pests from getting through. This will be done by installing an L-Shape Flashing that ill have silicone caulking under and above it to adhere to both the concrete floor and the bottom of the garage door. 2. The L-Shape Flashing will then be screwed in place onto the garage door. Silicone caulking will also be applied all around the garage door. This will ensure a tight seal. 3. We will then frame around the entire garage door with 2x4's. 4. Once framed, the garage door will be screwed into the 2x4's to be held in place in order to remove all railings, tracks and any other hardware. This framing will also get caulking in any gaps between the frame and the door for a tight seal. 5. Once the door is sealed/framed/secured in place and the entire wall furred out R- Insulation will be installed on all exterior walls of the garage as a heat trade-off for keeping the concrete floor as is. R25 c-.�u t r.� {'°r -�r c,_ s� c E 6. R-49 Insulation will be installed for the ceiling. 7. Installation of sheet rock throughout garage walls and ceilings. Additional Trade-Off's 8. A 3x3 window and a 60"x80"patio door will be installed on the South Wall for ventilation and light. 9. An Electric Tank-less Water Heater will be installed to replace an outdated tank water heater. i v off' 1Eaa.,r r c,oc-A‹rtx-e)0 °Ala/L- LUIS AND JESSICA ARREOLA 10660 SW PARK ST. TIGARD, OR 97223 503-890-8911 arreola1986( ,hotmail.com I 1 I I 1 I I II 111 y..l 5.9"s2 36E" _._':ti= I :33 :X3 :X3 :.13 — 1 I 1 I II I I 70' X9' F' T ELE'. TI 1i8"=1' LUIS AND JESSICA ARREOLA 10660 SW PARK ST. TIGARD,OR 97223 503-890-8911 arreola1986(a�hotmail.com INIIINIIIIIII MMIL ADD 5'DOOR ° ADD..3'X3' WINDOW i v. 4 Xc k-ta.ctc.r KITCHEN M - 2. ...A--5 .Zo.r lti- OA- __ W/D + TANKLESS /CLOSET ;- HEATER 10'0° ` 3'4". 43'B", , ^,` en - 7'8" to en __ CURRENT ` Lau DRY+ MAIN BEDROOM AREA 3 A v lallO 10'0° ADD LPVING ROOM A _,, L A V EXISTING GARAGE DOOR 16' ii+ r 7 42 3".. 4 2 3' I. 20'6" V 10'0" S n& �.eL r 4 3'4ii.. w 31 811. 1.1111.111.11.1111* 1=1.01.111111.1.1 .4( CAtiOr kA616C-1--. ) "4 i° J PROPOSED%2 BATH UPDATE TO FULL BATH in ` ': WITH SHOWER—WASHER AND DRYER WOULD Lk ! -�- _ I BE MOVED INTO THE GARAGES CLOSET % 4 uy 0„ I LUIS AND JESSICA ARREOLA 10660 SW PARK ST. TIGARD, OR 97223 (503)890-8911 Meeting Date: 9/10/2004 Code ID#: 27 -WB T: Garage conversions to living space; one and two family dwellings RESOLUTION NOTES: We agreed that we would accept the following as an alternative method of construciton (SECTION R104.11) when converting a Group U garage to living space under the OREGON RESIDENTIAL SPECIALTY CODE: A. energy trade-offs to be used in lieu of slab edge insulation; walls R-15, ceilings R-49, windows .036 and doors .020. B. waterproofing paint to be used in lieu of floor vapor barrier provided it can be demonstrated to meet the required perm rating. C. all other code requirements must be met for the proposed type of use, including but not limited to: light and ventilation, smoke detection, and emergency egress. D. site specific and climatic requirements will be left to the disgression of the building official. Meeting Date: 5/9/2008 Code ID#: 18 SUBJECT: Handicap parking space complaints in existing parking lots RESOLUTION NOTES: Bob Moore asked the group when they would act on a complaint and when to apply the new code provisions to an existing parking lot. Portland has a program that where there is evidence (records) that indicate disabled parking had been required as part of the development, action will be undertaken to maintain the disabled parking. An existing parking lot may be restriped to the same configuration as original. For a new configuration, the new disabled parking provisions are required. The general consensus was to follow this approach. Meeting Date: 7/10/2009 Code ID#: 1 SUBJECT: Hazardous exhaust systems in nail salons. RESOLUTION NOTES: Dave asked if others required the same type exhaust for pedicure stations as they would for mainicure stations. The code only specifies manicure stations, not pedicure. It was mentioned that the reason for the maincure exhaust requirements was not for the nail polish fumes, but for the acrylic adhesives and dust created by the artificial nails. This is not typically found with a pedicure station. The group agreed that only manicure stations should require the exhaust systems. Thursday,September 10,2009 Page 7 of 19