Loading...
Specifications (27) sz ckyL_ L st- • GREEN MOUNTVIIN REG'ENEP JAN 2 9 2019 %If structural engineering CITY OF ; BUILDING onhczint, STRUCTURAL CALCULATIONS Plan 2626 Elderberry Ridge, Lot 29 Tigard, Oregon Contractor: Riverside Homes _oo FR 0 Pes N.. 'P 49 .8PE OREGON COI .96VA MU14‘‘'. (EXPIRLS VZ• N Project Number: 17486 January 15, 2019 Index Structural Information Lateral Analysis L-1 thru L-15 hi greenmountainse com-info@greenmountainse corn -4857 NW Lake Rd.,Suite 260.Camas,WA 98607 M. GREEN MOUNThIN structural engineering STRUCTURAL DESIGN INFORMATION GOVERNING CODE: 2015 International Residential Code(IRC) 2015 International Building Code(IBC) This engineering pertains to the design of the Lateral Force Resisting System and a review of the home designer's framing and foundation plans. The home designer is responsible for making any necessary changes as required by these calculations to their framing and foundation plans. 1. Dead Load: A. Roof 15 psf B. Floor 10 psf C. Exterior walls 10 psf D. Exterior walls with veneer 50 psf E. Interior walls with gypboard each side 5 psf 2. Live load: A. Floor 40 psf B. Decks&Balconies 60 psf 3. Snow load: A. Uniformly distributed snow load on roof 25 psf 4. Wind load-based on ASCE 7-10 CH 27 MWFRS Directional Procedure: A. 3 Second Gust Wind Speed V=126 mph B. Exposure B C. Importance factor I=1.0 D. Topographical Factor Kzt=1.0 E. Wind Directional Factor Kd=0.85 F. Structure classified as enclosed 5. Seismic load-based on ASCE 7-10 Section 12.14: A. Mapped Spectral Acceleration for short periods Ss=1.0 B. Mapped Spectral Acceleration for 1 second period S1=0.34 C. Soil Site Class D D. Ductility coefficient R=6.5 E. Seismic Design Category D 6. Foundation Soil Properties: A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5 B. Maximum vertical bearing pressure 1500 psf 7. Retaining wall lateral loads: A. Walls free to displace laterally at top 40 pcf B. Walls restrained against lateral displacement at top 45 pcf 8. Concrete: A. 28 day design strength F'c 3000 psi B. Reinforcing bars ASTM A615,Grade 60 lit greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607 GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-1 LATERAL SEISMIC DESIGN BASED ON ASCE-7-10 1617.5 Simplified analysis procedure for seismic design of buildings SEISMIC BASE SHEAR V:= W (EQ.12.14-11 with F=12) R Ss mapped spectral acceleration for SS := 1.00 short periods(Sec.11.4.1) from USGS web site SS mapped spectral acceleration for S�:= 0.34 1 second period(Sec.11.4.1) Fa Site coefficient(Table 11.4-1) Fa 1.1 Based on Soil F„ Site coefficient(Table 11.4-2) F�:— 18 Site Class D SMS:= Fa•SS SMS= 1.1 (Eq.11.4-1) SMi:= F„•S1 SM1 = 0.61 (Eq.11.4-2) 11.4.43 Design spectrum response acceleration parameters 2 SDS 3'SMS SDs = 0.73 > 0.50g SEISMIC 2 CATEGORY SDi:= 3.5M1 Spy = 0.41 > 0.20g D per Table 11.6-1 WOOD SHEAR PANELS 1.2 SDS R:= 6.5 Table 9.52.2 V:_ •W R 1.2.0.73 V:= W V:= 0.135•W 6.5 4 Seismic Load Combinations E:= 1.3•V (E 12.4-3 with redundancy factor=13 per 12.3.42) WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS 11 GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-2 LATERAL SIMPLIFIED WIND AND SEISMIC COMPARISON WIND —34 11 j 7.4 psf psf Wind base Shear Length L:= 50•ft Height Ht:= 24-ft WIND:= L•Ht.(11•psf + 7.4•psf) SEISMIC WIND= 22080 lb Fr Wroof F2 . Wfloor Seismic Wwal I base Shear Ar„f:= 50•ft•46•ft Aroof= 2300 ft2 Afloor 42•ft•34•ft door= 1428ft2 Wwalls 4.50•ft•20•ft Wwalls= 4000ft2 SEISMIC:= (Aroof•15•psf+ Afloor•15•psf+ Wwalls•10•psf)•0.123 SEISMIC= 11798.16 lb WIND GOVERNS DESIGN II GREEN MOUMTIIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-3 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE VELOCITY PRESSURE qZ:= .00256•KZ•KZt•Kd•V2•I (Eq.6-15) EXPOSURE B WIND SPEED(3 second gust) V35:= 126 mph IMPORTANCE FACTOR I:= 1.0 TOPOGRAPHICAL FACTOR Kit:= 1.0 WIND DIRECTIONAL FACTOR Kd:= 0.85 (Table 6-4) EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:= .00256•KZ•KZt•Kd•V3s2.1 qz= 19.69 (varies/h eight) 15-20' KZ:= 0.62 qz:= .00256•KZ•KZt•Kd•V3,2.I qZ= 21.42 20'-25' KZ:= 0.66 qz:= .00256•KZ•KZt•Kd•V3s2.1 9Z= 22.8 25-30' KZ:= 0.70 qz:= .00256•KfIct•Kd•V352•I qZ= 24.18 II GREEN MOUNTnII 1 PROJECT: Riverside - Plan 2626 illie structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-4 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. WIND PRESSURE P:= 9Z•G•CP G:= 0.85 Gust factor C, pressure coefficient AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1 0'-15' WINDWARD PW:= 12.4.psf•0.85.0.8 P,,= 8.43 psf LEEWARD PL := 12.4•psf•0.85.0.5 PL = 5.27 psf 15-20' WINDWARD PH,:= 13.49.psf•0.85.0.8 P„,= 9.17 psf LEEWARD PL := 13.49•psf•0.85.0.5 PL = 5.73 psf 20'-25' WINDWARD P„,:= 14.36.psf•0.85.0.8 P,,= 9.76 psf LEEWARD PL:= 14.36•psf•0.85.0.5 PL. = 6.1 psf AT ROOF 0'-15' WINDWARD P,,:= 12.4•psf•0.85.0.3 PW = 3.16 psf LEEWARD PL := 12.4.psf•0.85.0.6 Pi = 6.32 psf 1B-20' WINDWARD P,,,:= 13.49-psf•0.85.0.3 PW= 3.44 psf LEEWARD PL:= 13.49•psf•0.85.0.6 P1 = 6.88 psf 20'-25' WINDWARD P,,:= 14.36•psf•0.85.0.3 PW= 3.66psf LEEWARD PL := 14.36.psf•0.85.0.6 PL = 7.32 psf 2B-30' WINDWARD PW:= 15.23•psf•0.85.0.3 PW= 3.88 psf LEEWARD PL := 15.23•psf•0.85.0.6 PL = 7.77 psf _.._. lik • GREEN MOUNThIN PROJECT: Riverside - Plan 2626 Ike structural engineering DATE: Dec . 2017 BY: CM JOB NO: 174 8 6 SHEET: L-5 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. Assume x.44 6.88 Cp-0.3 psf PO tf = 35 `p--0.6 8.5 ft 8 ft 9.17 psf 6.1 psf Mean Roof Height 18 + 25 = 21.5 2 Loads at Roof roof-max -ave Windward 3.44•psf 8.5•ft= 29.24plf 3.44•psf•5ft= 17.2 plf Leeward 6.88•psf•8.5•ft= 58.48 plf 6.88 psf-5.ft= 34.4 plf Wall loads at upper level at main level Windward 8.43psf•4•ft= 33.72pIf 8.43•psf•8.5•ft= 71.66plf Leeward 5.73 psf•4•ft= 22.92pIf 5.73•psf•85•ft=48.71plf GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-6 LATERAL `ntiwir) 1.0fcs u r + , n A7 f`o re) „ ii II cit -rop, 111111 1111 11 11 ❑ ❑ r= o o 17' [==i111: 1 0 (___, ift . 0 ja , . 1 CIE31 C I CA r - V I III r ° ° c o <: LEI 1 "A .z 5 11.- 4 LP V' ° �' I-- -- _ I 0 ca i(eW' I . ?3,rii„ II GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-7 LATERAL 161M2- 1.446k, 1 ti2t _ 00 1 I II I "II I 1 Il =�I NIF ig Fr RL 1p. ' iii 11 I 1 ! nisr -I 8 lu 11 IN In eeon.wooM i� o H I I I1 _ I H--. 1 III '•g�), NI I ,nom M I r—n I 1 II.1 — s.- v 1 4--- Vilr 1�� II 2t.51I L_J I 1 PARTIAL ELEVATION F -e an c- r If t �� t t 13 t-7,,,, A 1 GREEN MVVI`IIruiN PROJECT: Riverside - Plan 2626 illiii- structural engineering DATE: Dec . 2017 BY: CM JOB NO: 17486 SHEET: L-8 LATERAL 4ko1uc) {akvps ia, ill(514/4414 VirAi fit, > it 400b16 _ rj ---- 0112: V(Iie II 1 NOOK P^ 1 ROOIAsi it1 II r . iiiiit, IIIIIII II p •) 11110 .- II ,,,..1'. i 1 I� _ :o� I / z--- o Q I 144 oARA= D— .___ I °(›Ne‘. Abaft= \SUET ..- t ."4 tO` Foven I, ' L i� 2=1 - fg0�' 11119 immicualraue* = i 1 loov- l'novv- it GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-9 LATERAL SHEAR WALL DESIGN Pd! Pd! I Wdl 4 ! p (0 P:= wind i 11111111111 V:= seismic h R=HoIdown Force Based on IBC Basic Load Combinations 0.6D+ W (Equation 16-11) 0.6•D+ 0.7•E (Equation 16-12) Overturning Moment: Mot:= P•h L2 Resisting Moment: Mr:= 0.6•(Wdi + WWaii) ( + 0.6•Pdi•L Mot- Mr Holdown Force R:= L ii GREEN MOUNThIIN PROJECT: Riverside - Plan 2626 lie structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-10 LATE RAL Left Elevation Exterior Walls Second Level Wind Force P:= 1700•Ib P= 1700 lb Length of wall L:= 3.5•ft+ 6-ft+ 11-ft L= 20.5ft P Shear v:= - v= 82.93pIf A 3.5 Overturning Mot:= P•8 ft Mot= 232125 lb ft Moment 20.5 (3.5•ft)2 Resisting Mr:= 0.6•(15•psf•17•ft+ 10-psf•8•ft)• 2 + 0.6 600 Ib•3.5•ft Moment Mr = 2491.131b ft Mot- Mr Holdown = -48.34 lb Force 3'S ft Main Level Wind Force P:= 4400-lb P= 4400 lb Length of wall L:= 4•ft+4•ft+ 6•ft+ 13•ft L= 27ft P Shear v:= - v= 162.96p1f S 4 Overturning Mot:= P•9'ft•27 Mat= 5866.67 lb•ft Moment Resisting Mr:= 0.6•(15•psf•17•ft+ 10•psf•17•ft)• 2 + 0.6 800 lb 4•ft Moment Mr = 3960 lb ft Mot- Mr Holdown = 476.67 lb Oft Force II GREEN MOUNThIN 1 PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM .JOB NO: 17486 SHEET: L-1 LATE RAL Front Elevation Exterior Walls Second Level-Ele vA Gov design Wind Force P:= 2859•lb P= 2859lb Length of wall L:= 5•ft•2+ 3.5•ft•2 L=17ft P Shear v:= — v= 168.18plf 3.5 Overturning Mot:= P•8•ft•— Mot = 4708.94 lb ft Moment 17 (3.5,ft)2 Resisting M1:= 0.6.(15 psf 4 ft + 10•psf•8-ft)• 2 + 0.6-600-lb•3.5 ft Moment Mr = 1774.5 lb ft Mot- Mr Holdown = 838.41 lb Force 3.5ft Main Level -not considering the 3rd ca-garage Wind Force P:= 3680•lb P = 3680 lb Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25•ft L = 6.75 ft 2.25.3.5 = 7.88 P Shear Wind v — v= 545.19plf E 2.25 Overturning Mot:= P•7.88 ft Mot= 9666.131b•ft Moment 6.75 (2.25•ft)2 Resisting M�:= 0.6.(15•psf•4•ft+10•psf.8•ft)• 2 + 0.6.800•lb•2.25•ft Moment M M Holdown of = 3721.56 lb Mr= 1292.63lb•ft Force 2.25•ft HITS II GREEN MOUNThIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-12 LATERAL Right Elevation Exterior Walls Second Level Wind Force P:= 1700.lb P= 17001b Length alma!! L:= 3•ft+ 6•ft+ 10•ft L= 19ft P Shear v:= - v= 89.47 plf A 6 Overturning Mot:= P•8•ft•19 Mot = 4294.74 Ib ft Moment (6-ft)2 Resisting Mr:= 0.6.(15•psf•17•ft+ 10•psf•8•ft)• 2 + 0.6.600 lb•6 ft Moment Mr = 5778 lb ft Mot- Mr Holdown = -247.21 lb Force 6-ft Main Level Wind Force P:= 4400-lb P= 4400 lb Length of wall L:= 15-ft+ 7-ft+ 4-ft L= 26ft P Shear v:_ - v= 169.23 plf B 4 Overturning Mot:= P.9 ft•— Mot= 6092.31lb•ft Moment 26 Resisting Mr:= 0.6 (15 psf 17 ft+ 10 psf 17 ft)•( • 2 + O.6.800•lb•4•ft Moment Mr= 8167.5lb-ft Mot- Mr Holdown = -518.8lb 4-ft Force 11 GREEN MOUNTSIIN PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-13 LATE RAL Rear Elevation Exterior Walls Second Level Wind Force P:= 3043.1b P= 3043 lb Length of wall L:= 8•ft+ 7•ft L= 15ft P Shear v:= - v= 202.87 plf B 7 Overturning Mot:= P 8•ft•15 Mot= 11360.53 1 b•ft Moment (7.ft)2 Resisting Mr:= 0.6-(15-psf-2 ft + 10•psf•12.ft)• 2 + 0.6 600 1137 ft Moment Mr = 4725Ib•ft Mot- Mr Holdown = 947.93 lb MSTC40 Force 7ft Math Level Wind Force P:= 4303.lb P=4303 lb Length of wall L:= 3•ft+4•ft+ 3.5•ft L= 10.5ft P Shear Wind v:= - v=409.81 pIf D 3 Overturning Mot:= P9 ft•— Mot= 11064.861b•ft Moment 10.5 (3•ft)2 Resisting Mr:= 0.6•(15•psf•4 ft+ 10•psf.8.ft)• 2 + 0.6.800•Ib•3•ft Moment M r Mr= 18181b•ft Holdown of- = 3082.29 lb Force aft HTT5 II GREEN MOUI`ITMIIM PROJECT: Riverside - Plan 2626 structural engineering DATE: Dec . 2017 BY: CM JOB MO: 17486 SHEET: L-14 LATERAL Interior Shear Walls at Garage Main Level Wind Force P:= 3797•Ib P = 3797 lb Length of wall L:= 12•ft L= 12ft P Shear Wind v:= v= 316.42pif C Overturning Mot:= P 9•ft Mot= 34173lb•ft Moment (12 ft)2 Resisting Mr:= 0.6•(10•psf.12•ft+ 10•psf•9•ft)• 2 + 0.6.1200-lb•12•ft Moment Mot Mr = 177121bft Holdown = 1371.75lb M- Force 12ft HITS 11 GREEN MOUNTAIN PROJECT: Riverside - Plan 2626 VIP structural engineering DATE: Dec. 2017 BY: CM JOB NO: 17486 SHEET: L-15 LATERAL WIND ON PORCH ROOF 126 MPH,EXP B w:= 6•ft•(4.43.psf+ 8.86•psf) w= 79.7 plf t D / > / r II II \... li II w II �I M II j II II II ll — " LL , I cm /D / I DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 12 ft w•L2 M:= 2 M= 3987Ibft support beam on post in wall at house with M Simpson HUCQ-SDS C:= — T---C— C= 398.7 lb L 12 SDS 1/4x2 1/4 screws(min)x 172 lbs=2064 in combined withdraw w•L Nail top and bottom chord of first truss to wall with v:= p v= 66.45 plf (2)16d nails at 16"o.c.(web to studs) PI