Permit (130) .IN ' CITY OF TIGARD BUILDING PERMIT
Permit#: BUP2019-00154
a • COMMUNITY DEVELOPMENT
T i G A it.n 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/23/2019
Parcel: 2S101 BA00500
Jurisdiction: Tigard
Site address: 7600 SW DARTMOUTH ST
Project: Walmart Subdivision: HERMOSO PARK Lot: 8
Project Description: TI for existing tenant:New grid wall,removal of(8)self-checkstands and bullpen,relocation of fixtures and
prefabricated cash wrap registers,and installation of shelving with anchorage.
Contractor: POWERHOUSE RETAIL SERVICES Owner: WAL-MART REAL ESTATE BUSINESS TR
812 SOUTH CROWLEY RD STE A BY PROPERTY TAX DEPT STORE 5935-00
CROWLEY,TX 7036 PO BOX 8050
ATTN MS 0555
BENTONVILLE,AR 72716
PHONE: 817-297-8575 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/11/2019 $729.45
Demolition
Occupancy Grp: Occupancy Load: 100 12%State Surcharge-Building 07/11/2019 $87.53
Dwelling Units: 0 Plan Review 07/11/2019 $474.14
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 07/11/2019 $102.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 07/11/2019 $291.78
Value: $50,000 Info Process/Archiving-Lg$2.00(over 07/11/2019 $12.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,696.90
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire AtaMT: — Protected Corridors
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. is permit will expire if work is not started within 180 day. of issuance, or if work is suspende for more the 180
days. ATTENTION: Oregon law requires • to follow the rules adopted by the Oregon Utility Nbti -tion Center. Those r le a set forth in OAR
952-001-0010 through OA- -,.2-001-0090. Y' ay obt-;r'a copy of the rules or direct questions to OUNC b calling •03.23'. 98 or 1.8 i 332.234•.
/
Issued By: /IL
// I // Permittee Signature: f,.G die
C 03.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial FOR OFFIcl: FSE Oy1.1
8 _1VEt.'Received
Ci of Tigard �r
Permit No.: t�
a 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review?s"M 6 ' G3� 1 C �5
Phone: 503-718-2439 Fax: 503-598-1960 'Uj 1-- I �0� 7—�i-J9 11 Related Permit:
Date/By: /
Inspection Line: 503-639-4175 Date Ready/By: , / furls ® See
e Page 2 for
l1GARI1Internetwww.tigard-or.gov ' ^ 'G R3 Notifie ethod: 7 / A Supplemental Inf
ormation
BUILDING DIVISION i
�i
TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
D 1-and 2-family dwelling ®Commercial/industrial
Valuation: $
I=1Accessory building ❑Multi-family Number of bedrooms:
❑Master builder - ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 7600 SW Dartmouth St New dwelling area: square feet
City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet
Suite/bldg./apt.#: Project name:Walmart Front End Remodel Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Add self-checkout bullpen; add pickup tower;add checkout stands Valuation: $ 50,000.00
Existing building area: square feet
New building area: NA square feet
PROPERTY OWNER 0 TENANT Number of stories: 1
Name: Walmart Real Estate Business Trust Type of construction:
Address:2001 SE Tenth St Occupancy groups:
City/State/ZIP: Bentonville AR 72712 Existing:
Phone:(479 ) 273-4000 Fax:( ) New:
RI APPLICANT - 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name: pb2 architecture+engineering to fee ockedukt
Structural plan review fee(or deposit):
Contact name:Heather Edmiston
FLS plan review fee(if applicable): ;
Address: 2809 Ajax Ave, d� ��'11
Ste 100
Total fees due upon application: I 7 j I1
City/State/ZIP: Rogers AR 72758
(479 ) 878-3530 Fax: :(479) Amount received:
Phone: 636-1209
E-mail: heather.edmiston@pb ae.COm
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System.
Business name: P cr G1 vusz �C-�j l ✓vie r S LL and Submit two(2)sets of roof plan with connection details
¢ x-11 1"' r fire department access,along with the 2010 Oregon
Address: 0 ( - 5 (j > )/L t, f d sttl ,/9 Solar Installation Specialty Code checklist.
City/State/ZIP: ` T >' /_ Permit fee(includes plan review $180.00
G,rmj.` r r l" / y and administrative fees
Phone:(7/ " 2.,,,, 7_ is-2S Faxr( ) State surcharge(12%of permit fee): $21.60
l-
CCB Lic.: /e l c 9 (l /? ` . 6 Total fee due upon application: $201.60 i
Authorized signature: kd r This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Heather Edmiston Date: 60.p?ri. 1-1 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
Julie Drinkwater
From: Julie Drinkwater
Sent: Monday,July 22, 2019 8:05 AM
To: 'Heather Edmiston'
Cc: #Building Permit Technicians
Subject: RE: BUP2019-00154, 7600 SW Dartmouth,Walmart
Good morning Heather
I will add the contractor information to this permit.
Thank you
Julie Drinkwater
Permit Technician
City of Tigard Building Department
13125 SW Hall Blvd
Tigard,OR 97223
503-718-2804
From: Heather Edmiston [mailto:Heather.Edmiston@PB2AE.COM]
Sent: Monday,July 22, 2019 6:23 AM
To:Julie Drinkwater<JulieD@tigard-or.gov>
Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>
Subject: RE: BUP2019-00154, 7600 SW Dartmouth,Walmart
Caution! This message was sent from outside your organization. Allow sender I Block sender
Good morning, Julie.
BUP2019-00154 has been awarded to the following General Contractor:
Powerhouse Retail Services, LLC.
812 South Crowley Road
Suite A
Crowley, TX 76036
Attn: LonlVCoore.
lori.moore@powerhousenow.com
8172978575
AWARDED CONTRACT VALUE: $45,588
They should be in touch regarding licensing, etc. Let me know if you need additional information from
me. Thank you for your continued time and attention to this project.
Thank you,
1
City of Tigard
114 'I COMMUNITY DEVELOPMENT DEPARTMENT
II
TIGARD Building Permit Review — Commercial - No Land Use
Building Permit #: 94/P,26M——CZ)i5-1/
Site Address: 7Ct `j i.4) Q /YYJU 5- - Suite/Bldg#:
Project Name: ' l/114 r*
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review tall
i f `.
Proposal: A4 Sikc-G ill oc��,cA f,iLp Lvtr j ,, c1 Li) c is
Existing Business Activity: Saki- 0 rtkt i?tk
Proposed Business Activity:
L.B Verify site address/suite# exists and active in permit syst .
ming:
Terrace Neighborhood: ❑ Yes vNo
L'fT
�rmitted Use: L< Yes El No ❑ Spec Space
2. Confirm no land use required.
Business License:
Exists: License
❑ No,applicant notified to obtain business license
Notes: .4i '; .'TV iir•
Approved by Planning: 1i)JVtvt.L (JIPL— Date: 7-i4 1
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 7 i L y -
Site Plans: # A
Building Plans: # '3
Building Permit#: er diner permit bove.
Workflow Routing: arming ermit Coordinator 3-1iuitdtng
Workflow Sign-off: —gn-off for Planning(include notes from planning review)
Route Application Documents: 8 ding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: -- -•.-ef --- Date: 7/1//i
I:\Building\Forms\BldgPermitRvw_COM NoLandUse 060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved, NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revi 'on Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes LTJ" N/A
Tigard Trans SDC: ❑ Yes A
Parks SDC:
CI L7 N/A
OK to Issue Permit ��j//�/
Approved by Permit Coordinator: G� ( Date: �714
I:\Building\Forms\BldgPennitRvw_COM NoLandUse 070915.docx