Loading...
PFI2019-00314 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 11111 II COMMUNITY DEVELOPMENT Permit#: PF12019-00314 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/18/2019 TIC7AIZD g Parcel: SEG2105 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Comcast 158460 Project Description: SEG2105 and SEG2020//14965 SW 72nd Ave. Comcast porposes to bore from existing pedestal for a totoal of 206', remove and replace(1)-4'x5'flag of sidewalk in city of Tigard PUE. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric, data) PFI Permit Fee 09/18/2019 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: ALEX SILANTIEV TIGARD, OR 97223 PHONE: 5035963733 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: 11111W' —�- • riA Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12019-00314 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED SEP 18 2019 City of Tigard CITY OF TIGARD A� !PI ■ PLANNING/ENGINEERIN PFI#: Wiq 3� a ENGINEERING DEPARTMENT TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION 158460-Cable/Fiber Plant Extension TYPE OF WORK Project name: TYPE 1—Franchise Utility Work Brief description of project: Comcast proposes to bore from existing performed by NWN,PGE, or utility agency pedestal for a total of 206', remove & replace (1)-4'X5' flag ❑ TYPE2—ROW sidewaur/Drveway/Sewcr of sidewalk in city of tigard PUE. Work performed for the purpose o€ • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 14965 SW 72nd Ave, Portland, OR 97224 main line tap Location (address if available): ❑ TYPE 3—Full Scale Development Work SE35-116S) .4L performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Comcast Cable Communications Management, LLC • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 11308 SW 68th Parkway water service area City/State: Tigard, OR Zip: 97223 0 TYPE 4—Small Cell Technology Phone: (503) 596-3733 0 TYPE s—Tigard Triangle Alexander_Silantiev@comcast.com (503) 941-8656 Email: NOTE: Type 1 and 2 applications may be Contact name: Alex Silantiev emailed to rowpennitst tigard-or.gov. Phone: (503) 596-3733 Email: Alexander Silantiev@comcast.com CONTRACTOR INFORMATION 0 Same as applicant Name: Texstar Enterprises CCB Number: 178798 Mailing address: 14122 Arndt Rd City/State: Aurora, OR Zip: 97002 Phone: (503) 776-5049 Email: Jim.miner@texstarenterprises.com ENGINEER INFORMATION Name: kyle Schoepke Mailing address: PO BOX 2529 City/State: Clackamas, OR Zip: 97015 Phone: (503) 650-6041 Ext. 214 Email: Kyle_Schoepke@kbmail.net ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owtui or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with till: application. Franchised or licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. �� Kyle. 561oe.p/( for Alex S��a„��e v) 4- l 8- t 9 A hca 's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: it.�� O v l Permit fee: &O-O0 Received by: Date: t' 'I Approved by: /A-612/ Date: 91/2 s-h, Notified by: Date: 9 le r9 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www:tigard-or.gov • 503-718-2421 • Page 2 of 4 Page 104 2011 Edition Work in a Continuous Left Turn Lane Diagram 420 Diagram 420 shows work in the continuous two-way left turn lane of a two- way road with three or more lanes. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. For operations of more than one hour, cones and signs are required as shown. Protection vehicles are optional. 4. For operations between 15 minutes and one hour, including work that will relocate intermittently, cones are required and signs may be replaced by protection vehicles with flashing lights. 5. For operations of 15 minutes or less, signs and cones may be replaced by one or more protection vehicles with flashing lights. 6. When only one protection vehicle is used, the use of a spotter(s) is recommended to warn workers of approaching traffic. Sign Spacing and Buffer Lengths(feet) Posted Spadng Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 105 Work in a Continuous Left Turn Lane Diagram 420 II ROAD WORK AHEAD B 1 hit r CENTER LANE ♦ N CLOSED D I I AHEAD A It • .. U2 • • r • Buffer r�r � Protection Vehicles w/TMA(both Optional) See Chapter 4 m Buffer r • . . • L/2 1. 1 A ' CENTER LANE CLOSED AHEAD 1 yit B M ' ROAD • WORK AHEAD September 2016 Chapter 5 Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer" Speed A B is Space 20 50 25 100 100 100 75 30 100 35 40 25 350 350 350 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 / ORAD WORK AHEAD ■ B llyIt CENTER LANE CLOSED \AHEAD A II • • U2 •• I • i I :Buffer r Protection Vehicle w/TMA(both Optional) See Chapter 4 Buffer . • • U2 • . . U2 • I A • II 1 B ROAD V . WORK HEAD i September 2016 Chapter 5 Page 78 2011 Edition Work on Shoulder Diagram 210 Diagram 210 covers stationary work with work or parked equipment on the shoulder. This diagram does not cover work on a freeway shoulder. See Diagram 710 for Freeway Shoulder work. 1. Vehicles should be parked as far off the roadway as practical. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 3. For added visibility, truck-mounted arrow boards or PCMS in caution mode may be used. 4. Arrow panels in caution mode are recommended for work on roads with posted speeds of 45 mph or greater and high traffic volumes, greater than 2000 average daily traffic(ADT). 5. Requirements for signing and devices are shown in Table 5-2, below. Table 5-2: Device and Signage Guidelines Proximity to Edge of Traveled Way More than 15 feet or behind Barrier or Less than 15 feet Guardrail One advance warning sign is Advance warning required and two signs are Work in Place signs, devices, and recommended. More than 1 Hour flashing warning Cone taper is required. Cones lights are optional. along the edge of traveled way are optional. Work in Place Advance warning signs and devices are optional. Less than 1 Hour Sign Spacing and Buffer Lengths(feet) Posted Spadng Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 0 70 365 Chapter 5 September 2016 2011 Edition Page 79 Work on Shoulder Diagram 210 1t . • • . . • • (Optional) Protection Vehicle • III %% T S 8(bothhpOept nal) • rim • Buffer • • • • VS* • A * ROAD SHOULDE\ WORK OR WORK AHEAD AHEAD Initial Warning Sign If *Use as appropriate-see Table 5-2 September 2016 Chapter 5 f 3 5' R R N Z z3. 14945 , 4E E g g' 10' S 10' IIIs' I W 1 Z O S Q A X 2 W OL 0 10 0' OK r W R a. ^� 11945 SCALE: 1"=20' '0 R ff4//?JJJN a 2 n W O CO gO LT 'i 8 1 R g F .4.I I a 0 EXIT CIT'OF TIGARD ROW j. R PROPOSED PEDESTAL IU 3T 2T ji-R-3a . Iil�.o .,. AO .o. . g 4 ��, BSNY� 11 . .o. R Q \ .---------s,or SM sew s, sm Sh-� sm 5/ \a' TPB r« ROC FOC IS ml R I 1 = B i 11986 j is 1 1 N � R I 1 0 RCA CA CA CA SW CARDINAL LN- =A =A cg-$ CA CA 1 6 _ I4 jR ? R®IDIEIWDI@UCEf1Hx, ow E R1MiDF BDl9Ml1( ', j 6 E FOC « I ' «- 18' li ---__-106'____ 1-- ,.> - T't.-s/x S81W~ s, OI. f5sMmOE __�_"______'__"�_ /�d ...,--.„.„,—,...4—„,,„--v...,„----- F S f 1 ,i NA In 1 E y� "2 BEGIN CONSTRUCTION AT EXISTING E / PEDESTAL IN CITY OF TIGARD ROW I` R - / vu vac+ Puc - vac o.c 4 ws ws m $ i N c Ib u T / a o a4 DIRECTIONAL DRILL TO PLACE(1)-T �'U F Q CONDUIT CONTAINING(1}IBCT R / / FIBER MIN OF 36.BELOW GRADE y A msm 150E O o. n 151150 • R U 1.ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER 311.1 NO CONDITION. 5' Ia c Y S `' -" 2.ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES RP 1 OR UTILITY STRUCTURES. ieanw 3.IT IS THE CONSTRUCTION CONTRACTORS .=....es,..... RESPONSIBILITY TO CALL FOR LOCATES BEFORE DIGGING. CIU 2M77.10711 z 0 z W p N CI W w 3 O UNIMPROVED HARD SURFACE 1 6 Z d fOCi S- AREAS 1m � (CONCRETE) g $d ro DESCRIPTION: EXAMPLE: DESCRIPTION: EXAMPLE: `-K Z BORE/DRILL _.._.._.._.._.._.._ JOINT USE POLE 4 � r U.W TRENCH JOINT USE POLE W/TRANSFORMER r .142°Er' y «� EXISTING CONDUIT POWER POLE W/TRANSFORMER Z �ui me Y U k 1 k STRAND POWER POLE ' RIGHT OF WAY CABLE POLE 6 •��' PROPERTY LINE TELEPHONE POLE f IMI) 1 E 1 : , . . PUBLIC UTILITY EASEMENT .— PEDESTAL,VAULT 0 El CENTER LINE —..—•.—..— MANHOLE FACE OF CURB CATCH BASIN CM 11 EDGE OF PAVEMENT - VALVE(WATER,GAS,ETC) D4 A B C D T EDGE OF GRAVEL METER(WATER ©GAS,ETC) CPH911 13.0' 9.5' 14.5' 10.5' S (330nn) (240nn) (3?Onn) (2o5nn, • EDGE OF SIDEWALK t FIRE HYDRANT ' CPH915 17.0' 9.5' 14.5' 10.5' (430nn) (240nn) (3'On0 (265,0 EDGE OF DRIVEWAY '" CPH920 220' 9.5' 14.5' REMOVE&REPLACE UNITS, (560nn) (240nn) (370nn) (265nn) 3 i BORE PIT 14.0' 10.75' 14.5' 10.5' �/ SEWER CPH1012 (355nn) (275nn) (370nn) (265r,) g CP Hill. 16.0' 10.75' 14.5' 10.5' PF STORM •• - (455nn) (275nn) (370nn) (265nn, I gg 24.0' 10.75' 14.5' 10.5' c I�iB� I—iUI�i } WATER —' .— CPH1022 (610nn) (275nn) (370nn> (265nn) c _jBl�l g GAS �i�iIl�I SIB�� UPRIGHT PEDESTAL • POWER . 1 Il (fix, TELECOMMUNICATION ------ g I/ CAN TRAFFIC CONDUIT —. o STEAM -- - m N c .. m FENCE LINE —.—. Q m GUARD RAIL . - - �7 U m Ey d(J RAILROAD TRACKS (nlwnnnuiunumnu v. S 3- G m O 5 o C NI boa \J a SHEET no RP-L MUM„IO CMLE0477.10711